HomeMy WebLinkAboutFile Documents.106 S Mill St.0012.2019 (13).ACBK 1
HealthSafe Inspections Inc
390 Apple Drive
Basalt CO 81621
970-920-2100
Jim Baker
CDPHE Asbestos Building Inspector, Asbestos Air Monitoring Specialist (AMS) &
Project Designer Certification #13437
CDPHE Lead-Based Paint Inspector & Lead Hazard Assessor Certification #23607
ASBESTOS REPORT
DATE
02/22/2019
CLIENT
TGS Global
4100 E Arkansas Ave
Denver CO 80222
PROPERTY ADDRESS
106 South Mill Street, Commercial Office Unit #203, Aspen, Colorado 81611
02/22/2019
2
CLIENT BACKGROUND & CONCERNS
The Client, TGS Global, hired HealthSafe Inspections, Inc. (hereinafter, HealthSafe) to
perform an asbestos inspection for the complete gut of interior building materials within
the commercial office suite known as #203. This report does not include building
materials outside or exterior to the interior walls of the office suite #203, nor does it
include building materials into or below the floor’s primary structure or above the ceiling
drywall materials into the building’s voids which are not part of this commercial office
suite’s domain.
VISUAL INSPECTION & LABORATORY FINDINGS
An inspection was conducted by Jim Baker of HealthSafe on Wednesday, February 20,
2019. All interior suspect asbestos containing materials (ACM) or suspect asbestos
containing building materials (ACBM) were identified by their respective homogenous
materials reflecting the same in consistency, appearance and application/installation
date(s) and sampled randomly respective to the scope of those materials slated for
disturbance-demolition-disposal (DDD) in the office interior gut. Those materials
collected and analyzed by EPA 600 Method PLM analysis are the following:
02/22/2019
3
1. Flat-Skim-Coat Surfacing Material,, a homogeneous ceiling and wall trowel-
applied flat-finish surfacing material/texture [samples 1-5: 203-F-1,2,3,4,5],
collected from the east main wall near entry door NE corner area, west office
ceiling SW quadrant, main office west wall, east wall of main office and west
office north wall near NW corner, respectively, using the AHERA random
sampling grid # 8. This homogeneous surfacing material/texture is on the ceilings
and interior walls of the suite. The estimated impact area of DDD is more than
1,000 sf of surface area, but less than 5,000 sf, requiring a minimum of at least
five surfacing/texture material samples. The PLM analytical estimated results:
NONE DETECTED.
2. Drywall System Joint Compound: a homogeneous miscellaneous seam taping
compound requiring at least two samples [samples 6-7: 203-JC-1,2], collected
from the main office SE outside corner south side and west of NW inside corner,
respectively. This material is applied to the entire #203 office suite ceiling and
wall drywall system. The PLM analytical estimated results: NONE DETECTED.
3. Composite-Layered Drywall System, a homogeneous taped and joint
compounded drywall system (classified as a miscellaneous material as a complete
integral system) [samples 8-9: 203-J-1,2], collected from the west office NE
inside corner and NW inside corner of the main office, respectively. These
composite layered taped and joint compounded drywall materials are on ceilings
and walls of the office suite #203 with the flat-finish applied surfacing
material/texture. The estimated impact area of DDD is more than 1,000 sf, but
less than 5,000 sf, requiring a minimum of at least two composite core samples of
all drywall layers in conjunction with the joint compound samples in paragraph #2
above. The PLM analytical estimated results: NONE DETECTED.
4. Cementitious Floor Leveling Compound, a homogeneous miscellaneous
flooring material requiring a minimum of at least two samples [samples 10-11:
203-FLR-LVL-1,2], collected at the entry door underneath the wood-paneled
flooring and threshold. The PLM analytical estimated results: NONE
DETECTED.
A total of 11 suspect homogeneous ACM/ACBM bulk samples were collected and 11
samples were analyzed. The bulk samples were analyzed by EPA 600 PLM analytical
methods by a NVLAP accredited laboratory in accordance with Colorado State
Regulation 8 for the presence of asbestos mineral fibers. There is NO asbestos detected in
all 11 samples.
See supporting Hayes Microbial Consulting, Inc. data report #19007195.
02/22/2019
4
HEALTHSAFE CONCLUSIONS
• There is NO asbestos in any of the commercial office suite’s interior suspect
building materials slated for a total gut and DDD. NO asbestos abatement will be
required for any of the building materials within the office suite’s specific
materials. All building waste and debris can be disposed of in any landfill which
accepts normal, non-hazardous building waste.
Sincerely Submitted,
Jim Baker
COLORADO & FEDERAL ASBESTOS REGULATIONS SUMMARY
Regulation No. 8 Part B – Asbestos of the Colorado Department of Public Health and
Environment (CDPHE), Air Quality Control Commission requires a State-certified
Asbestos Building Inspector to inspect and collect bulk samples of all suspect asbestos
containing materials (ACM) or suspect asbestos containing building materials (ACBM)
prior to their disturbance, removal or demolition and disposal. The suspect materials shall
be analyzed by a NVLAP accredited laboratory by polarized light microscopy (PLM)
using EPA 600 analytical method. A material which is estimated to contain more than 1%
asbestos is classified as ACM/ACBM and regulated by the State and Federal
governments. Any friable (able to crush or reduce to powder by finger pressure) asbestos
with trace amounts of asbestos fibers or less than 1% must be point-counted using EPA
400 analytical method to prove that it is indeed less than 1%; if not, it must be classified
as ACM/ACBM and shall be treated as a State and Federal regulated material. Any
friable asbestos containing material (greater than 1% asbestos concentration) or
ACM/ACBM that could be rendered friable during its removal or demolition and disposal
shall require an asbestos abatement by a certified asbestos abatement contractor to
remove and dispose of the material(s).
A Colorado State (CDPHE) issued asbestos abatement permit is required for the
following trigger levels of ACM/ACBM:
02/22/2019
5
1. Residential buildings of four or fewer units--if more than 32 square feet of any
surface coverage (e.g., gypsum wallboard or drywall and associated applied surfacing
materials/textures, acoustic sprays, joint compounds, plaster, etc.), 50 feet of asbestos
covered or asbestos insulated pipe or any material which would fill a 55-gallon drum is
going to be disturbed, removed or disposed of, an asbestos abatement permit is required.
2. Residential complexes with more than four residential units, public access areas to a
residential building, commercial and retail buildings, public and civic buildings,
industrial buildings--if more than 160 square feet of surfacing materials, 260 linear feet
or more than 35 cubic feet (NESHAP) or 55-gallon drum (CDPHE) of suspect
ACM/ACBM is going to be disturbed, removed or disposed of, an asbestos abatement
permit is required under NESHAP and by the CDPHE. See note below on OSHA.
The regulations require an absolute minimum of 3 samples (EPA suggests 9) per
homogenous suspect surfacing and TSI materials and an absolute minimum of 2 samples
of homogenous miscellaneous materials or any number of “samples sufficient to
determine whether a material is ACM” (Reg8.IV.D.3). More samples are required based
on surface area or volume. These are minimums; the asbestos building inspector has the
field responsibility to determine homogenous materials and the number of samples to
collect per material; more than the minimum number of samples may be necessary at the
discretion of the inspector. An assessment of friability and functional space conditions of
the materials are also the inspector’s field responsibilities.
OSHA compliance is required for all employers and employees no matter the
quantity of asbestos present with strict regulations regarding 10 sf or more of TSI or
friable surfacing materials, and therefore it does not matter what the quantity or
State trigger levels are: all suspect ACM/ACBM shall be inspected and tested for
asbestos prior to their disturbance, removal and disposal for worker protection and
safety. See EPA 40 CFR 763.121 Worker Protection Rule, OSHA 29 CFR 1910.134
Respirator Protection Standard, OSHA 29 CFR 1910.1001 General Industry Standard and
OSHA 29 CFR 1926.1101 Construction Standard regulations when dealing with asbestos
hazards.
Note: County or City regulations may be more stringent.
02/22/2019
HMC #19007195
contact@hayesmicrobial.com
http://hayesmicrobial.com/
Analysis Report prepared for
HealthSafe Inspections
390 Apple Drive
Basalt, CO. 81621
Phone: 970-920-2100
Job Name: TGS Global
106 S. Mill St. #203
Aspen, CO 81611
Date Sampled: 02-20-2019
Date Analyzed: 02-22-2019
Report Date: 02-22-2019
EPA Laboratory ID# VA01419
NVLAP Lab Code: 500096-0 Asbestos License: 300435 License: #PH-0198
Page 1 of 5
02/22/2019
HMC #19007195
HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
February 22, 2019
Client Job Number:
Client Job Name:TGS Global
106 S. Mill St. #203
Aspen, CO 81611
Dear HealthSafe Inspections,
We would like to thank you for trusting Hayes Microbial for your analytical needs. On February 21, 2019 we received 11 samples by FedEx for the job
referenced above. 11 samples were received in good condition.
The results in this analysis pertain only to this job, collected on the stated date and should not be used in the interpretation of any other job. This report
may not be duplicated, except in full, without the written consent of Hayes Microbial Consulting, LLC.
This laboratory bears no responsibility for sample collection activities, analytical method limitations, or your use of the test results. Interpretation and
use of test results are your responsibility. Any reference to health effects or interpretation of mold levels is strictly the opinion of Hayes Microbial
Consulting. In no event, shall Hayes Microbial Consulting or any of its employees be liable for lost profits or any special, incidental or consequential
damages arising out of your use of the test results.
Steve Hayes, BSMT(ASCP)
Laboratory Director
Hayes Microbial Consulting, LLC
Page 2 of 5
02/22/2019
HMC #19007195
EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
Phone: 970-920-2100
Job Number:
Collected by:
Email:
Jim Baker
healthsafeinspections@gmail.com
Job Name:TGS Global
106 S. Mill St. #203
Aspen, CO 81611
Date Collected:
Date Received:
Date Reported:
02/20/2019
02/21/2019
02/22/2019
#Sample Name Description Asbestos Fibers Other Fibers Non- Fibers
1 1 203-F-1 Texture / White
(None Detected)
(None Detected)
100 %
2 2 203-F-2 Brittle / White
(None Detected)
(None Detected)
100 %
3 3 203-F-3 Brittle / White
(None Detected)
(None Detected)
100 %
4 4 203-F-4 Brittle / White
(None Detected)
(None Detected)
100 %
5 5 203-F-5 Brittle / White
(None Detected)
(None Detected)
100 %
6 6 203-JC-1 Brittle / White
(None Detected)
(None Detected)
100 %
7 7 203-JC-2 Brittle / White
(None Detected)
(None Detected)
100 %
8 8 203-8-1 Drywall / White/Brown
(None Detected)
(None Detected)
100 %
Layer 2 203-8-1 Joint Compound / White
(None Detected)
(None Detected)
100 %
Layer 3 203-8-1 Drywall/ J.Compnd / White
(None Detected)
12 % Cellulose fibers
88 %
Notes: Composite Of Drywall and Joint Compound.
Signature: Date:02/22/2019 Reviewed by: Date:02/22/2019
Page 3 of 5
02/22/2019
HMC #19007195
EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
Phone: 970-920-2100
Job Number:
Collected by:
Email:
Jim Baker
healthsafeinspections@gmail.com
Job Name:TGS Global
106 S. Mill St. #203
Aspen, CO 81611
Date Collected:
Date Received:
Date Reported:
02/20/2019
02/21/2019
02/22/2019
#Sample Name Description Asbestos Fibers Other Fibers Non- Fibers
9 9 203-J-2 Drywall / White/Brown
(None Detected)
12 % Cellulose fibers
88 %
Layer 2 203-J-2 Joint Compound / White
(None Detected)
(None Detected)
100 %
Layer 3 203-J-2 Drywall/ J.Compnd / White/Brown
(None Detected)
% Cellulose fibers
100 %
Notes: Composite Of Drywall and Joint Compound.
10 10 203-FLR-LVL-1 Cementitious / White
(None Detected)
(None Detected)
100 %
11 11 203-FLR-LVL-2 Cementitious / White
(None Detected)
(None Detected)
100 %
Signature: Date:02/22/2019 Reviewed by: Date:02/22/2019
Page 4 of 5
02/22/2019
HMC #19007195
Asbestos - Additional InformationHealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
Phone: 970-920-2100
All samples were received in acceptable condition unless otherwise noted on the report. This report must not be used by the client to claim product certification, approval, or
endorsement by AIHA, NIST, NVLAP, NY ELAP, or any agency. The results relate only to the items tested. Hayes Microbial Consulting reserves the right to dispose of all samples
after a period of 60 days in compliance with state and federal guidelines.
All Polarized Light Microscopy (PLM) results include an inherent uncertainty of measurement associated with estimating percentages by PLM. Measurement uncertainty data can be
provided when requested.
'None Detected' - Below the detected reporting limit of 1% unless point counting is performed, then the detected reporting limit is .25%.
Per NY ELAP198.6 (NOB), TEM is the only reliable method to declare an NOB material as Non-Asbestos Containing.
Any NY ELAP samples that are subcontracted to another laboratory will display the name and ELAP Lab Identification number in the report page heading of those samples. The
original report provided to Hayes Microbial Consulting is available upon request.
Signature: Date:02/22/2019 Reviewed by: Date:02/22/2019
Page 5 of 5
02/22/2019
02/22/2019
02/22/2019