Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.106 S Mill St.0012.2019 (5).ACBK
Task Name Duration Start Finish Aspen Project Start 45d 02/12/19 04/04/19 Interior 72.25d 04/02/19 06/25/19 Demo Prep 0.75d 04/02/19 04/02/19 Appliance, Fixture, hardware Removal 0.25d 04/02/19 04/02/19 Temp Services set up 0.25d 04/02/19 04/02/19 Dumpster Delivery 0.25d 04/02/19 04/02/19 Demolition 4.25d 04/02/19 04/06/19 Suite 201 Walls A,B,C,D 1d 04/02/19 04/03/19 Suite 201 Doors/Frame A,B,C,D 0.25d 04/03/19 04/03/19 Suite 201 Closet/Closet doors A 0.25d 04/04/19 04/04/19 Suite 203 Wall 0.25d 04/04/19 04/04/19 Hallway Bathroom Door 0.25d 04/04/19 04/04/19 Remove Ceiling Grid 1d 04/04/19 04/05/19 Remove All Flooring 2.5d 04/04/19 04/06/19 Framing 6.5d 04/08/19 04/15/19 Level/True Main Floor 0.25d 04/08/19 04/08/19 Frame Package Delivery 0.25d 04/08/19 04/08/19 Prep 2d 04/08/19 04/10/19 Install Framing 4d 04/10/19 04/15/19 Windows 7d 04/08/19 04/16/19 Treatments 3d 04/08/19 04/11/19 Security 4d 04/11/19 04/16/19 Electrical Rough-In 10d 04/15/19 04/26/19 Electrical-Rough In 9d 04/15/19 04/25/19 Walkthrough 1d 04/25/19 04/26/19 Plumbing Rough-In 6d 04/15/19 04/22/19 Ground Work 3d 04/15/19 04/18/19 Rough In 3d 04/18/19 04/22/19 HVAC Rough-In 2d 04/15/19 04/17/19 Ducting and Gas Piping 2d 04/15/19 04/17/19 A/V/Security Rough-In 10d 04/15/19 04/26/19 Low Voltage- CATV, CAT6, Tele 5d 04/15/19 04/20/19 Speaker Pre-Wire 2d 04/20/19 04/23/19 Alarm/Security Wiring 3d 04/23/19 04/26/19 Insulation 1.5d 04/26/19 04/27/19 Blow In 1d 04/26/19 04/27/19 Bats 0.25d 04/27/19 04/27/19 Rigid 0.25d 04/27/19 04/27/19 Drywall 8.5d 04/29/19 05/08/19 Delivery 0.5d 04/29/19 04/29/19 Hang and Scrap 5d 04/29/19 05/04/19 Tape 1d 05/04/19 05/06/19 Prime 1d 05/06/19 05/07/19 Mud 1d 05/07/19 05/08/19 02/22/2019 Drywall Texture 3.75d 05/08/19 05/13/19 Sand/Smooth 1d 05/08/19 05/09/19 Prep 1d 05/09/19 05/10/19 Blast Texture 0.75d 05/10/19 05/11/19 Touch UP 1d 05/11/19 05/13/19 Interior Painting 10.5d 05/13/19 05/24/19 Cleaning and Masking 2d 05/13/19 05/15/19 Sales Floor (PT-1)2d 05/15/19 05/17/19 Live Line (PT-2)0.75d 05/17/19 05/17/19 Processing/Vault (PT-2)0.75d 05/18/19 05/18/19 Halls (PT-1)2d 05/18/19 05/21/19 Break Room (PT-2)1d 05/21/19 05/22/19 Storage Room (PT-2)1d 05/22/19 05/23/19 Office (PT-2)1d 05/23/19 05/24/19 Interior doors Hang 7.25d 05/13/19 05/21/19 Return from Pre-Fin Shop 1d 05/13/19 05/14/19 Hang 1d 05/14/19 05/15/19 FOH 1d 05/15/19 05/16/19 BOH 1d 05/16/19 05/17/19 Bathrooms 0.25d 05/17/19 05/17/19 Halls 1d 05/17/19 05/18/19 Exits 1d 05/18/19 05/20/19 Install Hardware 1d 05/20/19 05/21/19 Interior Trim 5d 05/24/19 05/30/19 Windows 1d 05/24/19 05/25/19 Doors 1d 05/25/19 05/27/19 Walls 1d 05/27/19 05/28/19 Floors 2d 05/28/19 05/30/19 Millwork 4.25d 05/14/19 05/18/19 Millwork Material Delivery 0.25d 05/14/19 05/14/19 Millwork BOH Install 4d 05/14/19 05/18/19 Counter Tops 7d 05/18/19 05/27/19 POS 4d 05/18/19 05/23/19 Bathrooms 2d 05/23/19 05/25/19 Break room 1d 05/25/19 05/27/19 Cabinets 8d 05/24/19 06/03/19 Sales Floor 6d 05/24/19 05/31/19 Offices 1d 05/31/19 06/01/19 Break Room 1d 06/01/19 06/03/19 Electrical Trim 2d 06/03/19 06/05/19 Trim Cans 1.5d 06/03/19 06/05/19 Outlets and Switches 0.5d 06/05/19 06/05/19 Surface Mount Fixtures 2d 06/03/19 06/05/19 Plumbing Trim 4d 06/03/19 06/07/19 Set Toilets, Sinks, etc.2d 06/03/19 06/05/19 Install under Mount Sinks 2d 06/05/19 06/07/19 02/22/2019 A/V & Security Trim 5d 06/03/19 06/08/19 Install Plates 1d 06/03/19 06/04/19 Install Cameras 2d 06/04/19 06/06/19 Install Alarms 1d 06/06/19 06/07/19 Install Sensors 1d 06/07/19 06/08/19 Flooring 6d 06/07/19 06/14/19 Deliver/Acclimate 1d 06/07/19 06/08/19 Office 1d 06/07/19 06/08/19 Sales Floor 4d 06/08/19 06/13/19 Check-In 1d 06/07/19 06/08/19 Finish 1d 06/13/19 06/14/19 Cure and Protect 1d 06/13/19 06/14/19 Base 1d 06/13/19 06/14/19 Tile 7d 06/07/19 06/15/19 Prep 1d 06/07/19 06/08/19 Install 1d 06/07/19 06/08/19 Bong Wall 1d 06/07/19 06/08/19 Bathroom 1d 06/08/19 06/10/19 Processing Room 1d 06/10/19 06/11/19 Vault Room 1d 06/11/19 06/12/19 Storage Room 1d 06/12/19 06/13/19 Break Room 1d 06/13/19 06/14/19 Grout Install 1d 06/14/19 06/15/19 Wallpaper Check-In Area 3d 06/07/19 06/11/19 Prime 0.25d 06/07/19 06/07/19 Prep 0.25d 06/08/19 06/08/19 Cut/Size 1d 06/08/19 06/10/19 Hang/Smooth 1d 06/10/19 06/11/19 Trim 0.25d 06/11/19 06/11/19 Caulk 0.25d 06/11/19 06/11/19 Appliances 3d 06/15/19 06/19/19 Delivery 1d 06/15/19 06/17/19 Install 1d 06/17/19 06/18/19 Deli Case 1d 06/18/19 06/19/19 Merch. Refrigerator 1d 06/18/19 06/19/19 Merch. Freezer 1d 06/18/19 06/19/19 Safe 1d 06/18/19 06/19/19 Drinking Fountain 1d 06/18/19 06/19/19 Interior Glass 0.5d 06/19/19 06/20/19 Mirrors 0.5d 06/19/19 06/20/19 Sales Floor 0.5d 06/19/19 06/20/19 Clone Case 0.5d 06/19/19 06/20/19 Punch-list/Retail 4d 06/20/19 06/25/19 Final Inspections 7d 06/15/19 06/24/19 Plumbing, Electrical, Mechanical 5d 06/15/19 06/21/19 MED 1d 06/21/19 06/22/19 02/22/2019 CO 1d 06/22/19 06/24/19 Wrap Up 06/24/19 Remove Tools 06/24/19 Remove Materials 06/24/19 Final Cleanup 06/24/19 Deliver Job Book (Sub List, Warranty/Install Paperwork, etc.)06/24/19 Deliver Keys 06/24/19 Complete 1d 02/22/2019