The permit processing time is stopped on this review and will not begin again until
all of the issues are addressed and the corrections are submitted. The review will
queue with other permits being processed beginning at the date of resubmission.
Date: 2/16/17
To: Sara Upton
Email: supton@rowlandbroughton.com
Phone: 429-8722
From: Justin Hahn, Plans Examiner, City of Aspen
Phone (970) 429-2784, Fax (970) 920-5440, Justin.Hahn@cityofaspen.com
Permit Coordinator: Garrett Larimer, (970) 429-2768, Garrett.Larimer@cityofaspen.com
Project Name: Larkspur
Address: 101 S 7th St
Permit Number: 0002.2017.ARBU
Owner’s Name: Larkspur LLC
Code Edition: IRC 2009
Occupancy Group: IRC
Type of Construction: VB
Number of Stories: 2
These design documents have been reviewed for conformance to the International Codes
as adopted and amended by the City of Aspen. State and Federal regulations are
administered where applicable. All referenced code sections are from the 2009 IRC
unless noted otherwise. You can find a copy of all adopted codes, ordinances, and
policies on our website.
The date on this letter may be earlier than the time you receive it. This is because
comment letters from review agencies are held until all agencies have finished their
letters or signed off.
The attached corrections are required to be addressed. Revise and redraw the plans to
clearly respond to the attached comments and resubmit this comment letter with your
written response to each comment on this list. Indicate which detail or specification
page shows the required information. Provide both a physical copy and a digital
Word doc. Plan corrections cannot be made on the blueprints (e.g., red-lined). All
changes must be made to the originals prior to making prints. Responses such as “will
comply with code” are not adequate. Revised drawings must clearly show code
compliance.
If you have any questions specifically regarding the comments below, please feel free to
contact me directly. If you have questions regarding the status of your permit in the queue
or general permitting questions, please contact your Permit Coordinator.
When all items from all agencies have been addressed regarding the comments
below, call 970-920-5090 to schedule a required appointment for re-submittal with
The permit processing time is stopped on this review and will not begin again until
all of the issues are addressed and the corrections are submitted. The review will
queue with other permits being processed beginning at the date of resubmission.
your Permit Coordinator. You will be required to bring a copy of this letter with
ALL responses and required documentation. If all items listed have not been
addressed, the resubmittal will be deemed incomplete, and will not be accepted.
Building plan check is only one part of the often complex process by which projects are
reviewed for approval. These parts are interrelated and are sometimes conflicting. It is
ultimately the applicant’s responsibility to coordinate these requirements.
Please provide the following information to enable completion of this plan review:
1. Please provide a basic floor plan of the lower level of unit #101. If the
triangular window well is required emergency egress it does not meet the size
requirements of R310.2, it must have a minimum 3’x3’ clear space.
Please refer to changes on A-101.pdf, A-102.pdf, and A-501 as well as the
structural design on S1.
2. How will new grading affect the distance between finished grade and top of
the existing foundation wall on the building itself? Top of the foundation wall
will need to be 6” above the new finished grade per R404.1.6 unless masonry
veneer is being used in which case it would be 4”. Please provide a section
detail showing how the new grade will relate to the building and not just the
window wells for drainage/waterproofing.
Grade at building footprint and is not changing
Please refer to A-501 and S1
3. Fill out the asbestos questionnaire as required with all permit submittals.
Included
4. Fill out an IRC building description form as required with all permit
submittals.
Included
0002.2017.ARBU_Engineering_1
Page: A-102
Author: jackd
File Name: 00.Plan-Set.2017.01.09.pdf
How will this new stairwell be
drained?
A-102 (3)
Page: A-102
Author: jackd
File Name: 00.Plan-Set.2017.01.09.pdf
A minor drainage report is
required for this permit. Refer to
the Urban Runoff Management
Plan, Appendix A for more
information.
Page: A-102
Author: jackd
File Name: 00.Plan-Set.2017.01.09.pdf
Surface drainage from lightwells
can not be connected to a
perimeter drain.
Page: A-103
Author: jackd
File Name: 00.Plan-Set.2017.01.09.pdf
215 sf
A-103 (3)
Page: A-103
Author: jackd
File Name: 00.Plan-Set.2017.01.09.pdf
35 sf
How will this new stairwell
be drained?
Surface drainage
from lightwells can
not be connected to
a perimeter drain.
215 sf
35 sf
The proposed stairs will be
sheeted to drain to the existing
landscape. See attached A-101
Please see attached
minor drainage narrative
and drawings.
Revised to drain to existing
drywell. See attached A-101
Numbers have been revised
and updated. Refer to A-101
Numbers have been revised
and updated. Refer to A-101
Page: A-103
Author: jackd
File Name: 00.Plan-Set.2017.01.09.pdf
530 sf
530 sf Numbers have been revised
and updated. Refer to A-101
Zoning Comments Round 1 0002.2017.ARBU 03_08_2017 00.Plan-Set.2017.01.09 3-8-2017
Page: A-001
Page Index: 1
Checkmark: Checked
Author: claude
Date: 3/8/2017 4:40:32 PM
Color:
File Name: 00.Plan-Set.2017.01.09.pdf
Zoning Comment 2
What is the full scope of work?
00.Plan-Set.2017.01.09.pdf (3)
Page: A-001
Page Index: 1
Checkmark: Checked
Author: claude
Date: 3/8/2017 4:39:59 PM
Color:
File Name: 00.Plan-Set.2017.01.09.pdf
Zoning Comment 3
Provide existing first floor plans.
Want to understand the stair and
retaining wall changes at the
East Facade
Page: A-001
Page Index: 1
Checkmark: Checked
Author: claude
Date: 3/8/2017 4:40:31 PM
Color:
File Name: 00.Plan-Set.2017.01.09.pdf
Zoning Comment 1
Provide existing floor plans for
lower level
Zoning Comment 2What is the full
scope of work?
Zoning Comment 3
Provide existing first
floor plans. Want to
understand the stair
and retaining wall
changes at the East
Facade
Zoning Comment 1
Provide existing floor
plans for lower level
•The light wells will be closed off on one side to match up
to existing grade to stop water from coming into basement
and increase usable yard area.
•On the side of the house facing South 7th St. a new stair
will be built into an existing retaining wall next to driveway
and adjacent property.
Please refer to A-103e
Please refer to A-102e