Loading...
HomeMy WebLinkAboutFile Documents.101 S 7th St.0002.2017 (12).ARBU The permit processing time is stopped on this review and will not begin again until all of the issues are addressed and the corrections are submitted. The review will queue with other permits being processed beginning at the date of resubmission. Date: 2/16/17 To: Sara Upton Email: supton@rowlandbroughton.com Phone: 429-8722 From: Justin Hahn, Plans Examiner, City of Aspen Phone (970) 429-2784, Fax (970) 920-5440, Justin.Hahn@cityofaspen.com Permit Coordinator: Garrett Larimer, (970) 429-2768, Garrett.Larimer@cityofaspen.com Project Name: Larkspur Address: 101 S 7th St Permit Number: 0002.2017.ARBU Owner’s Name: Larkspur LLC Code Edition: IRC 2009 Occupancy Group: IRC Type of Construction: VB Number of Stories: 2 These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen. State and Federal regulations are administered where applicable. All referenced code sections are from the 2009 IRC unless noted otherwise. You can find a copy of all adopted codes, ordinances, and policies on our website. The date on this letter may be earlier than the time you receive it. This is because comment letters from review agencies are held until all agencies have finished their letters or signed off. The attached corrections are required to be addressed. Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list. Indicate which detail or specification page shows the required information. Provide both a physical copy and a digital Word doc. Plan corrections cannot be made on the blueprints (e.g., red-lined). All changes must be made to the originals prior to making prints. Responses such as “will comply with code” are not adequate. Revised drawings must clearly show code compliance. If you have any questions specifically regarding the comments below, please feel free to contact me directly. If you have questions regarding the status of your permit in the queue or general permitting questions, please contact your Permit Coordinator. When all items from all agencies have been addressed regarding the comments below, call 970-920-5090 to schedule a required appointment for re-submittal with Received 3/27/17 The permit processing time is stopped on this review and will not begin again until all of the issues are addressed and the corrections are submitted. The review will queue with other permits being processed beginning at the date of resubmission. your Permit Coordinator. You will be required to bring a copy of this letter with ALL responses and required documentation. If all items listed have not been addressed, the resubmittal will be deemed incomplete, and will not be accepted. Building plan check is only one part of the often complex process by which projects are reviewed for approval. These parts are interrelated and are sometimes conflicting. It is ultimately the applicant’s responsibility to coordinate these requirements. Please provide the following information to enable completion of this plan review: 1. Please provide a basic floor plan of the lower level of unit #101. If the triangular window well is required emergency egress it does not meet the size requirements of R310.2, it must have a minimum 3’x3’ clear space. Please refer to changes on A-101.pdf, A-102.pdf, and A-501 as well as the structural design on S1. 2. How will new grading affect the distance between finished grade and top of the existing foundation wall on the building itself? Top of the foundation wall will need to be 6” above the new finished grade per R404.1.6 unless masonry veneer is being used in which case it would be 4”. Please provide a section detail showing how the new grade will relate to the building and not just the window wells for drainage/waterproofing. Grade at building footprint and is not changing Please refer to A-501 and S1 3. Fill out the asbestos questionnaire as required with all permit submittals. Included 4. Fill out an IRC building description form as required with all permit submittals. Included Received 3/27/17 0002.2017.ARBU_Engineering_1 Page: A-102 Author: jackd File Name: 00.Plan-Set.2017.01.09.pdf How will this new stairwell be drained? A-102 (3) Page: A-102 Author: jackd File Name: 00.Plan-Set.2017.01.09.pdf A minor drainage report is required for this permit. Refer to the Urban Runoff Management Plan, Appendix A for more information. Page: A-102 Author: jackd File Name: 00.Plan-Set.2017.01.09.pdf Surface drainage from lightwells can not be connected to a perimeter drain. Page: A-103 Author: jackd File Name: 00.Plan-Set.2017.01.09.pdf 215 sf A-103 (3) Page: A-103 Author: jackd File Name: 00.Plan-Set.2017.01.09.pdf 35 sf How will this new stairwell be drained? Surface drainage from lightwells can not be connected to a perimeter drain. 215 sf 35 sf The proposed stairs will be sheeted to drain to the existing landscape. See attached A-101 Please see attached minor drainage narrative and drawings. Revised to drain to existing drywell. See attached A-101 Numbers have been revised and updated. Refer to A-101 Numbers have been revised and updated. Refer to A-101 Received 3/27/17 Page: A-103 Author: jackd File Name: 00.Plan-Set.2017.01.09.pdf 530 sf 530 sf Numbers have been revised and updated. Refer to A-101 Received 3/27/17 Zoning Comments Round 1 0002.2017.ARBU 03_08_2017 00.Plan-Set.2017.01.09 3-8-2017 Page: A-001 Page Index: 1 Checkmark: Checked Author: claude Date: 3/8/2017 4:40:32 PM Color: File Name: 00.Plan-Set.2017.01.09.pdf Zoning Comment 2 What is the full scope of work? 00.Plan-Set.2017.01.09.pdf (3) Page: A-001 Page Index: 1 Checkmark: Checked Author: claude Date: 3/8/2017 4:39:59 PM Color: File Name: 00.Plan-Set.2017.01.09.pdf Zoning Comment 3 Provide existing first floor plans. Want to understand the stair and retaining wall changes at the East Facade Page: A-001 Page Index: 1 Checkmark: Checked Author: claude Date: 3/8/2017 4:40:31 PM Color: File Name: 00.Plan-Set.2017.01.09.pdf Zoning Comment 1 Provide existing floor plans for lower level Zoning Comment 2What is the full scope of work? Zoning Comment 3 Provide existing first floor plans. Want to understand the stair and retaining wall changes at the East Facade Zoning Comment 1 Provide existing floor plans for lower level •The light wells will be closed off on one side to match up to existing grade to stop water from coming into basement and increase usable yard area. •On the side of the house facing South 7th St. a new stair will be built into an existing retaining wall next to driveway and adjacent property. Please refer to A-103e Please refer to A-102e Received 3/27/17 Received 3/27/17 No special inspection required, doing epoxy dowels not epoxy anchors. Please discard from permit docs prior to approval. City of Aspen Asbestos Checklist Project Address: Parcel ID #: Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days, weeks or even months before settling out of the air, only to become airborne again from some minor disturbance, such as turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. 1. Are you the owner/builder for this project? ___ NO ___ YES If YES, you must submit a Single-Family Residential Dwelling Area of Public Access Opt-out Form with the Colorado Department of Public Health and Environment (CDPHE). http://www.cdphe.state.co.us/ap/asbestos/asSFRDform.pdf A copy of this form must be submitted with the building permit application. Due to a rescinded EPA Ban, buildings of any age may contain asbestos; even those built after 1988 may have asbestos containing materials and therefore all demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. 2. Residential: Will you be removing more than 50 linear feet or 32 sq.ft. or equivalent of a 55- gallon drum of any material besides concrete, wood, bricks or steel (examples are drywall, linoleum, carpet, ceiling tiles, pipe insulation, etc)? ___ NO ___ YES 3. Commercial: Will you be removing more than 260 linear feet or 160 sq.ft or equivalent of a 55-gallon drum of any material besides concrete, wood, bricks or steel (examples are drywall, linoleum, carpet, ceiling tiles, pipe insulation, etc)? ___ NO ___ YES 4. Will you be completely demolishing the building? ___ NO ___ YES If the answer is YES to either question #2, #3 or #4, you need an asbestos test before you can apply for a building and/or demolition permit. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Division stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages for certified asbestos inspectors and abatement companies. ALWAYS ASK FOR PROOF OF CURRENT STATE CERTIFICATION.) If YES to question #4 and your asbestos test is less than the State Threshold, you must still submit a demolition permit with the CDPHE. http://www.cdphe.state.co.us/ap/asbestos/asdemo.pdf A copy of this demolition permit must be submitted with the building permit application. I hereby certify that the above information is true and complete. Owner______________________________ Phone # Applicant (print name)_________________________________ Phone #____________ Applicant Signature ___________________________________ Date ______________ Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have questions about asbestos, interpreting your test results, or other matters. 101 S 7th St x x 273512317004 Larkspur LLC. Rowland & Broughton 970-429-8722 970-544-9006 x x Received 3/27/17    IRC Building Description Form  New Gdrive/master files/building/apps, forms checklists BCM 1/13/14                              MASTER PERMIT#_______________________________             CHANGE ORDER #_______________________________             CHANGE ORDER #_______________________________  CHANGE ORDER #_______________________________  Building Description Form - IRC Property Location: Address: Unit #: Legal Description: (lot, Block) Owner: Owner Address: Parcel ID #: Building Code Information Code Editions: 2009 IRC 2009 IMC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC Fire Sprinkler System Installed: ______ NO _____ YES NFPA _____ Type of Construction: VB Required Special Inspections: ____High Strength Bolting ____Epoxy Anchors ____Structural Steel Welding ____Permanent Micropiles _____Other (specify): ______________________ Energy Code Compliance Path: ____Prescriptive Table ____ResCheck Performace ____ResCheck UA Tradeoff External Energy Use Snowmelt ______sq ft Existing ______sq ft New Spa _____ Pool ____ Building Description # Stories Above Grade _______ # Stories Below Grade ________ Garage: Attached______# Of Cars___ Detached______# Of Cars____ Carport_______ Bedrooms______ Full Baths_____3/4 Baths_____1/2 Baths_____ Kitchen_____ # Wood Fireplaces: _______ # Gas Appliances: _______ # Gas Logs:____________ Other Rooms: ____________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ACCESSORY DWELLING UNIT: Living______Kitchen_______Bath______Bedroom______Other:_________ Reviewed by Plans Examiner Date 101 S 7th St 273512317004 Shadow Mountain Townhomes Condo Unit B Larkspur LLC. 3000 Sand Hill Rd. Building 1 Suite 150, Menlo Park, CA 94025 Pending x 2 1 2x 5 3 1 1 1 0 2 0 N/A x Received 3/27/17 0002.2017.ARBU JH 4/6/17 Minor Drainage Report Narrative 101 7th Street Aspen, CO 81611 Description of the Existing Site: · The single-family house sits on a site with minor slopes on the corner of Main St. and South 7th St. · Window wells on the basement level are open along one side allowing the landscape to slope down into the basement level. · There are no current as-built drawings of the house or civil engineering drawings. · We will verify in field the system for downspouts and gutters during construction. · Please refer to attached drawings V-001, A-101e, A-102e, A-103e Description of the Proposed Project: · The light wells will be closed off on one side to match up to existing grade to stop water from coming into basement and create a level lawn. · On the side of the house facing South 7th St. a new stair will be built into an existing retaining wall next to driveway and adjacent parcel. Both parcels have the same owner. · Please refer to attached drawings D-101, D-102, A-101, A-102, A-104, and A-501 for areas of demolition and reconfiguration. Discussion of Drainage Issues: · Due to lack of as-built civil drawings, the foundation drainage and downspout system is assumed to drain to existing on-site drywells to be verified in field. Discussion of Drainage Alterations: · The proposed drainage of the lightwells will not tie into a foundation drain and will be made as a separate system to drain to an existing on-site drywell, the location of which shall be determined during construction. · The proposed drainage from the new stairs will be sheeted to drain over the existing driveway surface to the green landscape to the north. · Please refer to attached drawings A-101 and A-102. Discussion of Downstream Water Quality improvements: · By increasing the permeable area around the lightwell we are greatly reducing the amount of water directed to the drainage system from lightwells or the perimeter drain. · Sheeting our drainage of the proposed stairwell on the existing landscape reduces the amount of standing water on the hard surface of the driveway. Received 3/27/17 Verify where existing drywells are. The IBC does not allow surface drains being connected to the the foundation drain system. Is the drywell discussed part of the foundation drain system? Received 3/27/17 Received 3/27/17 Received 3/27/17 Received 3/27/17 Received 3/27/17 Received 3/27/17 Received 3/27/17 show spot elevations that support the drainage from these stairs will sheet flow across driveway to green space. Show how lightwells will drain to existing drywells. Call out pipe invert elevations, size, slope and type. Received 3/27/17 Received 3/27/17 Received 3/27/17 Received 3/27/17 Received 3/27/17 · · · · S1LARKSPUR EXTERIORIMPROVEMENTS101 7TH STREETASPEN, COLORADOPATTILLO ASSOCIATES ENGINEERSSTRUCTURAL CONSULTANTSReceived 3/27/17