1.0 General
2,137 sqft of interior space renovated.
Table of Contents
2.0 Project Introduction
2.1 Total project disturbance area roughly 2,137 sqft
2.2 Project vicinity map is included
2.3 The project is located at 100 E Main St on the corner of E Main and North Garmisch St across from
Paepcke park. The owner is proposing Interior fit-out of existing tenant space to house a dental office
3.0 Project Documentation
3.1 At the time of this CMP no permits have been issued.
3.2 Indicate project notification per CMP Manual for all properties within 300ft.
3.3 Project Sign will be placed on the front door
3.4 Contact list included for: This information is also listed on A0.1 cover page of the plans
Owner John Miller aspendmd@gmail.com
Contractor Lester Development – 970.424.1001
Site supervisor Alberto – 970.618-6192
Safety officer Alberto – 970.618-6192
4.0 Project Implementation
4.1 Dates of construction ___09/01/201 to 05/15/17_________
4.2 Hours of construction __7:30 am to 5:00 pm Monday to Friday and Saturday 9am to 5pm
4.3 Construction schedule:
4.6 Site map is provided
5.0 Project Management
5.2 Read Emergency vehicle access.
We, Lester Development (General Contractor) will maintain continuous emergency vehicle access, on and
around site, including but not limited to police, fire and ambulance services. This includes projects adjacent to
roads and alleys.
5.4 Map showing location of:
Staging ___Galena St______
Trailer _______N/A_________
Materials ______inside ________
Waste management _____inside_________
6.0 Traffic Control
6.2 Project haul routes _____Galena to Main Street_______
6.3 Weight and size limitations of vehicles ___N/A______
6.4 Construction vehicles activities defined _______N/A________
6.4 Specify delivery vehicle:
Maximum number of deliveries at a time ___2_______
Hours of deliveries ____7:30 am to 5:00 pm__________
Exceptions to delivery schedule ___Holidays & high traffic times – Lester Development will
contact engineering if necessary.
0040.2016.ACBKReceived
8/31/2016 11:51:28 AM
Received
8/31/2016 11:53:14 AM
8.0 Sediment and Erosion Control
9.0 Fugitive Dust Control
9.1 Complete a fugitive dust control plan
Plan includes: N/A
Sediment tracking techniques N/A
Water Truck N/A
24-hour contact - Tom Lester 379-4655
10.0 Emissions
10.1 Assure proper vehicle maintenance
10.2 Opacity – no darker than 40%
11.0 Noise Suppression
11.1 Include a signed noise suppression plan ____provided__________
11.2 Read the Noise controls and reduction plan.. Lester Development will remind and require laborers
and sub-contractor about construction noise policy and requirements.
Hours: 9am to 5pm Monday to Friday for all activities exceeding 80 decibels.