HomeMy WebLinkAboutFile Documents.18 Westview Dr.0033.2019 (3).ARBKConstruction Management Plan L8 Westview 1.0 Total square footage of disturbance shall be 800 on the existing land. Total interior remodel shall consist of 700 square feet of interior space as per architect. 2,0 Project Introduction: 626 Francis St remodel' 2. j. Total project disturbance area shall be 800; the project is mostly an interior remodel with the addition of an outdoor staircase to be done in Spring' 2.2 Proiectvicinity map is located on architectural cover. 2.3 Home was built in 2004, The lot square footage is 20410 and the home square footage is 4717. The proposed remodel shall include: replacing 2 windows, replacing plumbing fixtures and some lighting. Replar:ing tile and flooring in bathrooms, and adding an outdoor grill with a patio, No sewer or storm water shall be affected. No city water shall be affected' 3.0 Project Documentation 3,L No current permits for this property exist. Rothberg Development shall maintain insurance and proper licensure throughout the project 3.2 A project sign including a date table notifying neighbors as to construction progress shall be maintained on site 3.3 Sign shall be Posted on site 3.4 Contact list: Owner: Community Holdings Aspen, LLC lcy David Gitlitz. Adam Rothberg is authorized rep. Contractor: Rothberg Development, Adam Rothberg 948-0480 Site Supervisor: Adam Rothberg 948-0480 Safety Officer: Adam Rothberg Traffic Officer: no traffic officer shall be required Erosion Control Rep' Project is interior remodel 4.0 Project lmPlementation 4.L Dates of Construction: Project shall begin upon permitting and shall take approximately 2 months 4.2 Hours of construction: 8 am to 5 pm [r/onday thru Friday and 9 am to 5 pm on Saturday. 4.3 project shall commence with removal of: kitchen fixtures, bathroom tile floors, and bathroom fixtures, some cabinetry and some lighting fixtures. Upon completion of demo, all items listed above shall be replaced with new items. Windows shall be removed once new windows are on site and rearjy to be installed' 4.4 property is not fenced, no additional 'construction fencing shall be necessary for an interior remodel and the only outdoor work will be only a few feet from house 4.5 No fencing. 4.6 No trees shall be removed or affected. 4.7 No permit shall be required from Parlks Dept' 5.0 Site Management: 03/04/2019 Staircase to be done in a change order CMP approved, but may require additional fencing / sound mitigation if any outdoor work or worstations used. 5.1 Right of way Management plan: no traffic impediment or parking shall be necessary' 5.2 Emergency access shall not be impeded in any way' 5.3Thisprojectsha||beunderthecategoryofMinorimpact.RothbergDeve|opmentutilizes it owns crew that carpools from Glenwclod and arrives in two crew cab trucks that carry equipment and workers. In addition, a clump trailer shall be used to remove cabinets and fixtures from the site 5.4. No office trailer shall be utilized on site. Materials shall be stored in garage' A dump trailer shall be used only when necessary and will not remain onsite' Waste management: All materials removed from site shall be separated into wood, plastic, stone, and re-usable piles. Any items that are reusable shall be loaded into a trailer and stored for future use off-site. Any items that may be r;old shall be sold' lf items cannot be sold then they will be recycled accordingly, Rothberg Development shall utilize a trailer for recycling separately from garbage and non-recyclables' 6.0 Tr,affic Control: Roaring Fork Drive to Westview. Large parking area on site' 6.2 Trucks and trailers, and material clelivery trucks such as Probuild flat bed trucks will be the largest trucks that will arrive onsiter. Probuild's largest truck would be the largest truck onsite at 2g feet and i.g,0o0 lbs clry weight. Maximum 33,000 lbs fully loaded' 6.3 SPecified above 6.4 No more than 1 delivery per day shall occur and most days there shall be no deliveries' Deliveries shall only occur during working hours. No semi-trucks shall be required, only f|atbeds.Node|iverytrucksha||id|eformorethan5minutes' 6.5 Site is not in the central core and remodel shall require only minimal parking and deliveries' No traffic shall be impeded 7.0 Pedestrian traffic shall not be impeded in any wa'y g.0 Sediment and Erosion control - Not applicable to interior remodel and exterior material replacement. g.0 Fugitive Dust control. No site work shall be done, No fugitive dust emissions will occur' 10.0 Emissions: All vehicles will maintain proper emission control as per state and city requirements 1L.0 contractor has signed construction Noise Suppression Plan simultaneous with permit submission and will adhere to it' 03/04/2019