Loading...
HomeMy WebLinkAboutFile Documents.121 E Hyman Ave.0149.2018 (13).ARBK 1 HealthSafe Inspections Inc 390 Apple Drive Basalt CO 81621 970-920-2100 Jim Baker CDPHE Asbestos Building Inspector, Asbestos Air Monitoring Specialist (AMS) & Project Designer Certification #13437 CDPHE Lead-Based Paint Inspector & Lead Hazard Assessor Certification #23607 ASBESTOS REPORT DATE 03/22/2018 CLIENT Clayton c/o Hansen Construction, Inc. 310 AABC Aspen CO 81611 PROJECT PROPERTY ADDRESS 121 East Hyman Avenue, Aspen, Colorado 81611 3/30/20185/23/2018 2 For orientation purposes, the front door faces north, the garage faces south. COLORADO & FEDERAL ASBESTOS REGULATIONS SUMMARY Regulation No. 8 Part B – Asbestos of the Colorado Department of Public Health and Environment (CDPHE), Air Quality Control Commission requires a State-certified Asbestos Building Inspector to inspect and collect bulk samples of all suspect asbestos containing materials (ACM) or suspect asbestos containing building materials (ACBM) prior to their disturbance, removal or demolition and disposal. The suspect materials shall be analyzed by a NVLAP accredited laboratory by polarized light microscopy (PLM) using EPA 600 analytical method. A material which is estimated to contain more than 1% asbestos is classified as ACM/ACBM and regulated by the State and Federal governments. Any friable (able to crush or reduce to powder by finger pressure) asbestos with trace amounts of asbestos fibers or less than 1% must be point-counted using EPA 400 analytical method to prove that it is indeed less than 1%; if not, it must be classified as ACM/ACBM and shall be treated as a State and Federal regulated material. Any friable asbestos containing material (greater than 1% asbestos concentration) or ACM/ACBM that could be rendered friable during its removal or demolition and disposal shall require an asbestos abatement by a certified asbestos abatement contractor to remove and dispose of the material(s). A Colorado State (CDPHE) issued asbestos abatement permit is required for the following trigger levels of ACM/ACBM: 1. Residential buildings of four or fewer units--if more than 32 square feet of any surface coverage (e.g., gypsum wallboard or drywall and associated applied surfacing materials/textures, acoustic sprays, joint compounds, plaster, etc.), 50 feet of asbestos covered or asbestos insulated pipe or any material which would fill a 55-gallon drum is going to be disturbed, removed or disposed of, an asbestos abatement permit is required. 2. Residential complexes with more than four residential units, public access areas to a residential building, commercial and retail buildings, public and civic buildings, industrial buildings--if more than 160 square feet of surfacing materials, 260 linear feet or more than 35 cubic feet (NESHAP) or 55-gallon drum (CDPHE) of suspect 3/30/20185/23/2018 3 ACM/ACBM is going to be disturbed, removed or disposed of, an asbestos abatement permit is required under NESHAP and by the CDPHE. See note below on OSHA. The regulations require an absolute minimum of 3 samples (EPA suggests 9) per homogenous suspect surfacing and TSI materials and an absolute minimum of 2 samples of homogenous miscellaneous materials or any number of “samples sufficient to determine whether a material is ACM” (Reg8.IV.D.3). More samples are required based on surface area or volume. These are minimums; the asbestos building inspector has the field responsibility to determine homogenous materials and the number of samples to collect per material; more than the minimum number of samples may be necessary at the discretion of the inspector. An assessment of friability and functional space conditions of the materials are also the inspector’s field responsibilities. OSHA compliance is required for all employers and employees no matter the quantity of asbestos present with strict regulations regarding 10 sf or more of TSI or friable surfacing materials, and therefore it does not matter what the quantity or State trigger levels are: all suspect ACM/ACBM shall be inspected and tested for asbestos prior to their disturbance, removal and disposal for worker protection and safety. See EPA 40 CFR 763.121 Worker Protection Rule, OSHA 29 CFR 1910.134 Respirator Protection Standard, OSHA 29 CFR 1910.1001 General Industry Standard and OSHA 29 CFR 1926.1101 Construction Standard regulations when dealing with asbestos hazards. Note: County or City regulations may be more stringent. CLIENT BACKGROUND The Client, Clayton, hired Hansen Construction, Inc. (hereinafter, Hansen) to perform an extensive interior and exterior remodel of the residence, the west side of a duplex townhome. This remodel will be a gut of the interior as well as demolition and new construction of both the north and south ends of the house, including the roof. Prior to submitting for the building permit, Hansen hired HealthSafe Inspections, Inc. (hereinafter, HealthSafe) to perform the required asbestos building inspection, collect bulk samples of all suspect materials and write this asbestos report. Architectural plans of the existing and proposed changes were provided to HealthSafe. The inspection and bulk sampling considered all aspects of those proposed demolition and construction plans. This report is not intended for the purpose for estimating purposes. Measurements provided in this report are for the sole purpose of determining numbers of samples required per suspect material. 3/30/20185/23/2018 4 VISUAL INSPECTION & LABORATORY FINDINGS An inspection was conducted by Jim Baker of HealthSafe on March 13, 2018. Suspect interior and exterior ACM/ACBM were identified and sampled. Those materials are the following: 1. Roofing Tar Paper: a homogeneous miscellaneous material requiring at least two samples [samples 1-2: RF-TP-1,2]. Sample 1 was collected from the north deck roof and sample 2 from near the southeast chimney. The PLM analytical estimated results: NONE DETECTED. 2. Exterior Synthetic Stucco: a homogeneous surfacing material at 3,500 sf, requiring at least five samples [samples 3-7: X-STUC-1,2,3,4,5]. The PLM analytical estimated results: NONE DETECTED. 3. Gypsum Wallboard/Drywall System in Garage & Mechanical Room: a homogeneous taped and joint compounded drywall system (classified as a miscellaneous material as a complete integral system) [samples 8-9: ST-C/W-J- 1,2]; these composite layered taped and joint compounded drywall materials are on ceilings and walls of the garage and mechanical room with a surfacing material/texture known as “skip-trowel“. The estimated surface area is more than 1,000 sf, but less than 5,000 sf, (1,750 sf), requiring a minimum of at least two composite core samples of all drywall layers with joint compound (“…number of samples sufficient to determine” …if asbestos is present or not). The PLM analytical estimated results: NONE DETECTED. 4. Garage & Mechanical Room Skip-Trowel Surfacing Material/Texture: a homogeneous trowel-applied surfacing material/texture [samples 10-14: ST-C/W- T-1,2,3,4,5]. This surfacing material/texture is on ceilings and walls of the garage and mechanical room. The estimated surface area is more than 1,000 sf, but less than 5,000 sf (1,750 sf), requiring a minimum of at least five surfacing/texture material samples. The PLM analytical estimated results: NONE DETECTED. 5. Garage Wallpaper: A homogeneous miscellaneous material on the west garage wall at approximately 175 sf, requiring at least one sample [sample 15: GWP]. The PLM analytical estimated results: NONE DETECTED. 6. Venetian Plaster Covered Gypsum Wallboard/Drywall System: a homogeneous taped and joint compounded drywall system (classified as a miscellaneous material as a complete integral system) [samples 15-18: PL-C/W-J-1,2,3]; these composite layered taped and joint compounded drywall materials are on ceilings and walls of the house interior of all floor levels with a surfacing material/texture known as “plaster“. The estimated surface area is more than 5,000 sf, requiring a minimum of at least two composite core samples of all drywall layers and joint compound. Three core samples were collected, one from each floor level (“…number of samples sufficient to determine” …if asbestos is present or not). The PLM analytical estimated results: NONE DETECTED. 7. Venetian Plaster Surfacing Material/Texture: a homogeneous trowel-applied surfacing material/texture [samples 19-25: PL-C/W-T-1,2,3,4,5,6,7]. This surfacing material/texture is on ceilings and walls of all floor levels of the house interior. The estimated surface area is more than 5,000 sf, requiring a minimum of 3/30/20185/23/2018 5 at least seven plaster surfacing/texture material samples. The PLM analytical estimated results: NONE DETECTED. There were no other additional suspect asbestos building materials to sample which were slated to be disturbed, removed or disposed of in the slated demolition and renovation/remodel. A total of 25 suspect homogeneous ACM/ACBM bulk samples were collected and 25 samples were analyzed. The bulk samples were analyzed by PLM by a NVLAP accredited laboratory in accordance with Colorado State Regulation 8 for the presence of asbestos mineral fibers. There is NO asbestos in all 25 samples analyzed. See supporting Hayes Microbial Consulting, Inc. data report #18007981. HEALTHSAFE CONCLUSIONS There is NO asbestos in any of the suspect building materials slated to be impacted by the planned demolition and remodel/renovation. NO asbestos abatement will be required. All building materials needing to be removed or disturbed can be dealt with without the concerns for asbestos fibers. All building waste and debris can be disposed of in any landfill which accepts normal, non-hazardous building waste. Sincerely Submitted, Jim Baker 3/30/20185/23/2018 HMC #18007981 contact@hayesmicrobial.com http://hayesmicrobial.com/ Analysis Report prepared for HealthSafe Inspections 390 Apple Drive Basalt, CO. 81621 Phone: 970-920-2100 Job Name: Clayton C/O Hansen Construction 121 E. Hyman Ave Aspen CO 81611 Date Sampled: 03-13-2018 Date Analyzed: 03-21-2018 Report Date: 03-21-2018 EPA Laboratory ID# VA01419 NVLAP Lab Code: 500096-0 Asbestos License: 300435 License: #PH-0198 Page 1 of 6 3/30/20185/23/2018 HMC #18007981 HealthSafe Inspections 390 Apple Drive Basalt, CO 81621 March 21, 2018 Client Job Number: Client Job Name:Clayton C/O Hansen Construction 121 E. Hyman Ave Aspen CO 81611 Dear HealthSafe Inspections, We would like to thank you for trusting Hayes Microbial for your analytical needs. On March 14, 2018 we received 25 samples by FedEx for the job referenced above. 25 samples were received in good condition. The results in this analysis pertain only to this job, collected on the stated date and should not be used in the interpretation of any other job. This report may not be duplicated, except in full, without the written consent of Hayes Microbial Consulting, LLC. This laboratory bears no responsibility for sample collection activities, analytical method limitations, or your use of the test results. Interpretation and use of test results are your responsibility. Any reference to health effects or interpretation of mold levels is strictly the opinion of Hayes Microbial Consulting. In no event, shall Hayes Microbial Consulting or any of its employees be liable for lost profits or any special, incidental or consequential damages arising out of your use of the test results. Steve Hayes, BSMT(ASCP) Laboratory Director Hayes Microbial Consulting, LLC Page 2 of 6 3/30/20185/23/2018 HMC #18007981 EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections 390 Apple Drive Basalt, CO 81621 Phone: 970-920-2100 Job Number: Collected by: Email: Jim Baker healthsafeinspections@gmail.com Job Name:Clayton C/O Hansen Construction 121 E. Hyman Ave Aspen CO 81611 Date Collected: Date Received: Date Reported: 03/13/2018 03/14/2018 03/21/2018 #Sample Name Description Asbestos Fibers Other Fibers Non- Fibers 1 1 RF TP 1 Fibrous / Brown (None Detected) 70 % Cellulose fibers 30 % 2 2 RF TP 2 Fibrous / Brown (None Detected) 70 % Cellulose fibers 30 % 3 3 X STUC 1 Granular / Gray (None Detected) (None Detected) 100 % 4 4 X STUC 2 Granular / Gray (None Detected) (None Detected) 100 % 5 5 X STUC 3 Brittle / Gray (None Detected) (None Detected) 100 % 6 6 X STUC 4 Brittle / Gray (None Detected) (None Detected) 100 % 7 7 X STUC 5 Granular / Gray (None Detected) (None Detected) 100 % 8 8 ST CW J1 Drywall / White/Brown (None Detected) 12 % Cellulose fibers 88 % Layer 2 ST CW J1 Joint Compound / White (None Detected) (None Detected) 100 % 9 9 ST CW J2 Drywall / White/Brown (None Detected) 12 % Cellulose fibers 88 % Layer 2 ST CW J2 Joint Compound / White (None Detected) (None Detected) 100 % Signature: Date:03/21/2018 Reviewed by: Date:03/21/2018 Page 3 of 6 3/30/20185/23/2018 HMC #18007981 EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections 390 Apple Drive Basalt, CO 81621 Phone: 970-920-2100 Job Number: Collected by: Email: Jim Baker healthsafeinspections@gmail.com Job Name:Clayton C/O Hansen Construction 121 E. Hyman Ave Aspen CO 81611 Date Collected: Date Received: Date Reported: 03/13/2018 03/14/2018 03/21/2018 #Sample Name Description Asbestos Fibers Other Fibers Non- Fibers 10 10 ST CW T1 Texture / White (None Detected) (None Detected) 100 % 11 11 ST CW T2 Texture / White (None Detected) (None Detected) 100 % 12 12 ST CW T3 Texture / White (None Detected) (None Detected) 100 % 13 13 T CW T4 Texture / White (None Detected) (None Detected) 100 % 14 14 ST CW T5 Texture / White (None Detected) (None Detected) 100 % 15 15 GWP Fibrous / White (None Detected) 70 % Cellulose fibers 30 % 16 16 PL CW J1 Joint Compound / White (None Detected) (None Detected) 100 % 17 17 PL CW J2 Drywall / White/Brown (None Detected) 12 % Cellulose fibers 88 % Layer 2 PL CW J2 Joint Compound / White (None Detected) (None Detected) 100 % 18 18 PL CW J3 Drywall / White/Brown (None Detected) 12 % Cellulose fibers 88 % Layer 2 PL CW J3 Joint Compound / White (None Detected) (None Detected) 100 % Signature: Date:03/21/2018 Reviewed by: Date:03/21/2018 Page 4 of 6 3/30/20185/23/2018 HMC #18007981 EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections 390 Apple Drive Basalt, CO 81621 Phone: 970-920-2100 Job Number: Collected by: Email: Jim Baker healthsafeinspections@gmail.com Job Name:Clayton C/O Hansen Construction 121 E. Hyman Ave Aspen CO 81611 Date Collected: Date Received: Date Reported: 03/13/2018 03/14/2018 03/21/2018 #Sample Name Description Asbestos Fibers Other Fibers Non- Fibers 19 19 PL CW T1 Brittle / White (None Detected) (None Detected) 100 % 20 20 PL CW T2 Brittle / White (None Detected) (None Detected) 100 % 21 21 PL CW T3 Brittle / White (None Detected) (None Detected) 100 % 22 22 PL CW T4 Brittle / White (None Detected) (None Detected) 100 % 23 23 PL CW T5 Brittle / White (None Detected) (None Detected) 100 % 24 24 PL CW T6 Brittle / White (None Detected) (None Detected) 100 % 25 25 PL CW T7 Brittle / White (None Detected) (None Detected) 100 % Signature: Date:03/21/2018 Reviewed by: Date:03/21/2018 Page 5 of 6 3/30/20185/23/2018 HMC #18007981 Asbestos - Additional InformationHealthSafe Inspections 390 Apple Drive Basalt, CO 81621 Phone: 970-920-2100 All samples were received in acceptable condition unless otherwise noted on the report. The Report must not be used by the client to claim product certification, approval, or endorsement by: AIHA, NIST, NVLAP NY ELAP, or any agency. The results relate only to the items tested. The results include an inherent uncertainty of measurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data can be provided when requested. None detected: Below the detected reporting limit of 1% unless point counting is performed, then the detected, reporting limit is .25%. Per NY ELAP198.6 (NOB) TEM is the only reliable method to declare an NOB material as Non-Asbestos Containing. Hayes Microbial Consulting reserves the right to dispose of all samples after a period of 60 days in compliance with state and federal guidelines. Signature: Date:03/21/2018 Reviewed by: Date:03/21/2018 Page 6 of 6 3/30/20185/23/2018 3/30/20185/23/2018 3/30/20185/23/2018