HomeMy WebLinkAboutFile Documents.121 E Hyman Ave.0149.2018 (13).ARBK 1
HealthSafe Inspections Inc
390 Apple Drive
Basalt CO 81621
970-920-2100
Jim Baker
CDPHE Asbestos Building Inspector, Asbestos Air Monitoring Specialist (AMS) &
Project Designer Certification #13437
CDPHE Lead-Based Paint Inspector & Lead Hazard Assessor Certification #23607
ASBESTOS REPORT
DATE
03/22/2018
CLIENT
Clayton
c/o Hansen Construction, Inc.
310 AABC
Aspen CO 81611
PROJECT PROPERTY ADDRESS
121 East Hyman Avenue, Aspen, Colorado 81611
3/30/20185/23/2018
2
For orientation purposes, the front door faces north, the garage faces south.
COLORADO & FEDERAL ASBESTOS REGULATIONS SUMMARY
Regulation No. 8 Part B – Asbestos of the Colorado Department of Public Health and
Environment (CDPHE), Air Quality Control Commission requires a State-certified
Asbestos Building Inspector to inspect and collect bulk samples of all suspect asbestos
containing materials (ACM) or suspect asbestos containing building materials (ACBM)
prior to their disturbance, removal or demolition and disposal. The suspect materials shall
be analyzed by a NVLAP accredited laboratory by polarized light microscopy (PLM)
using EPA 600 analytical method. A material which is estimated to contain more than 1%
asbestos is classified as ACM/ACBM and regulated by the State and Federal
governments. Any friable (able to crush or reduce to powder by finger pressure) asbestos
with trace amounts of asbestos fibers or less than 1% must be point-counted using EPA
400 analytical method to prove that it is indeed less than 1%; if not, it must be classified
as ACM/ACBM and shall be treated as a State and Federal regulated material. Any
friable asbestos containing material (greater than 1% asbestos concentration) or
ACM/ACBM that could be rendered friable during its removal or demolition and disposal
shall require an asbestos abatement by a certified asbestos abatement contractor to
remove and dispose of the material(s).
A Colorado State (CDPHE) issued asbestos abatement permit is required for the
following trigger levels of ACM/ACBM:
1. Residential buildings of four or fewer units--if more than 32 square feet of any
surface coverage (e.g., gypsum wallboard or drywall and associated applied surfacing
materials/textures, acoustic sprays, joint compounds, plaster, etc.), 50 feet of asbestos
covered or asbestos insulated pipe or any material which would fill a 55-gallon drum is
going to be disturbed, removed or disposed of, an asbestos abatement permit is required.
2. Residential complexes with more than four residential units, public access areas to a
residential building, commercial and retail buildings, public and civic buildings,
industrial buildings--if more than 160 square feet of surfacing materials, 260 linear feet
or more than 35 cubic feet (NESHAP) or 55-gallon drum (CDPHE) of suspect
3/30/20185/23/2018
3
ACM/ACBM is going to be disturbed, removed or disposed of, an asbestos abatement
permit is required under NESHAP and by the CDPHE. See note below on OSHA.
The regulations require an absolute minimum of 3 samples (EPA suggests 9) per
homogenous suspect surfacing and TSI materials and an absolute minimum of 2 samples
of homogenous miscellaneous materials or any number of “samples sufficient to
determine whether a material is ACM” (Reg8.IV.D.3). More samples are required based
on surface area or volume. These are minimums; the asbestos building inspector has the
field responsibility to determine homogenous materials and the number of samples to
collect per material; more than the minimum number of samples may be necessary at the
discretion of the inspector. An assessment of friability and functional space conditions of
the materials are also the inspector’s field responsibilities.
OSHA compliance is required for all employers and employees no matter the
quantity of asbestos present with strict regulations regarding 10 sf or more of TSI or
friable surfacing materials, and therefore it does not matter what the quantity or
State trigger levels are: all suspect ACM/ACBM shall be inspected and tested for
asbestos prior to their disturbance, removal and disposal for worker protection and
safety. See EPA 40 CFR 763.121 Worker Protection Rule, OSHA 29 CFR 1910.134
Respirator Protection Standard, OSHA 29 CFR 1910.1001 General Industry Standard and
OSHA 29 CFR 1926.1101 Construction Standard regulations when dealing with asbestos
hazards.
Note: County or City regulations may be more stringent.
CLIENT BACKGROUND
The Client, Clayton, hired Hansen Construction, Inc. (hereinafter, Hansen) to perform an
extensive interior and exterior remodel of the residence, the west side of a duplex
townhome. This remodel will be a gut of the interior as well as demolition and new
construction of both the north and south ends of the house, including the roof. Prior to
submitting for the building permit, Hansen hired HealthSafe Inspections, Inc.
(hereinafter, HealthSafe) to perform the required asbestos building inspection, collect
bulk samples of all suspect materials and write this asbestos report. Architectural plans of
the existing and proposed changes were provided to HealthSafe. The inspection and bulk
sampling considered all aspects of those proposed demolition and construction plans.
This report is not intended for the purpose for estimating purposes. Measurements
provided in this report are for the sole purpose of determining numbers of samples
required per suspect material.
3/30/20185/23/2018
4
VISUAL INSPECTION & LABORATORY FINDINGS
An inspection was conducted by Jim Baker of HealthSafe on March 13, 2018. Suspect
interior and exterior ACM/ACBM were identified and sampled. Those materials are the
following:
1. Roofing Tar Paper: a homogeneous miscellaneous material requiring at least two
samples [samples 1-2: RF-TP-1,2]. Sample 1 was collected from the north deck
roof and sample 2 from near the southeast chimney. The PLM analytical
estimated results: NONE DETECTED.
2. Exterior Synthetic Stucco: a homogeneous surfacing material at 3,500 sf,
requiring at least five samples [samples 3-7: X-STUC-1,2,3,4,5]. The PLM
analytical estimated results: NONE DETECTED.
3. Gypsum Wallboard/Drywall System in Garage & Mechanical Room: a
homogeneous taped and joint compounded drywall system (classified as a
miscellaneous material as a complete integral system) [samples 8-9: ST-C/W-J-
1,2]; these composite layered taped and joint compounded drywall materials are
on ceilings and walls of the garage and mechanical room with a surfacing
material/texture known as “skip-trowel“. The estimated surface area is more than
1,000 sf, but less than 5,000 sf, (1,750 sf), requiring a minimum of at least two
composite core samples of all drywall layers with joint compound (“…number of
samples sufficient to determine” …if asbestos is present or not). The PLM
analytical estimated results: NONE DETECTED.
4. Garage & Mechanical Room Skip-Trowel Surfacing Material/Texture: a
homogeneous trowel-applied surfacing material/texture [samples 10-14: ST-C/W-
T-1,2,3,4,5]. This surfacing material/texture is on ceilings and walls of the garage
and mechanical room. The estimated surface area is more than 1,000 sf, but less
than 5,000 sf (1,750 sf), requiring a minimum of at least five surfacing/texture
material samples. The PLM analytical estimated results: NONE DETECTED.
5. Garage Wallpaper: A homogeneous miscellaneous material on the west garage
wall at approximately 175 sf, requiring at least one sample [sample 15: GWP].
The PLM analytical estimated results: NONE DETECTED.
6. Venetian Plaster Covered Gypsum Wallboard/Drywall System: a homogeneous
taped and joint compounded drywall system (classified as a miscellaneous
material as a complete integral system) [samples 15-18: PL-C/W-J-1,2,3]; these
composite layered taped and joint compounded drywall materials are on ceilings
and walls of the house interior of all floor levels with a surfacing material/texture
known as “plaster“. The estimated surface area is more than 5,000 sf, requiring a
minimum of at least two composite core samples of all drywall layers and joint
compound. Three core samples were collected, one from each floor level
(“…number of samples sufficient to determine” …if asbestos is present or not).
The PLM analytical estimated results: NONE DETECTED.
7. Venetian Plaster Surfacing Material/Texture: a homogeneous trowel-applied
surfacing material/texture [samples 19-25: PL-C/W-T-1,2,3,4,5,6,7]. This
surfacing material/texture is on ceilings and walls of all floor levels of the house
interior. The estimated surface area is more than 5,000 sf, requiring a minimum of
3/30/20185/23/2018
5
at least seven plaster surfacing/texture material samples. The PLM analytical
estimated results: NONE DETECTED.
There were no other additional suspect asbestos building materials to sample which were
slated to be disturbed, removed or disposed of in the slated demolition and
renovation/remodel. A total of 25 suspect homogeneous ACM/ACBM bulk samples were
collected and 25 samples were analyzed. The bulk samples were analyzed by PLM by a
NVLAP accredited laboratory in accordance with Colorado State Regulation 8 for the
presence of asbestos mineral fibers. There is NO asbestos in all 25 samples analyzed.
See supporting Hayes Microbial Consulting, Inc. data report #18007981.
HEALTHSAFE CONCLUSIONS
There is NO asbestos in any of the suspect building materials slated to be impacted by the
planned demolition and remodel/renovation. NO asbestos abatement will be required.
All building materials needing to be removed or disturbed can be dealt with without the
concerns for asbestos fibers. All building waste and debris can be disposed of in any
landfill which accepts normal, non-hazardous building waste.
Sincerely Submitted,
Jim Baker
3/30/20185/23/2018
HMC #18007981
contact@hayesmicrobial.com
http://hayesmicrobial.com/
Analysis Report prepared for
HealthSafe Inspections
390 Apple Drive
Basalt, CO. 81621
Phone: 970-920-2100
Job Name: Clayton C/O Hansen Construction
121 E. Hyman Ave
Aspen CO 81611
Date Sampled: 03-13-2018
Date Analyzed: 03-21-2018
Report Date: 03-21-2018
EPA Laboratory ID# VA01419
NVLAP Lab Code: 500096-0 Asbestos License: 300435 License: #PH-0198
Page 1 of 6
3/30/20185/23/2018
HMC #18007981
HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
March 21, 2018
Client Job Number:
Client Job Name:Clayton C/O Hansen Construction
121 E. Hyman Ave
Aspen CO 81611
Dear HealthSafe Inspections,
We would like to thank you for trusting Hayes Microbial for your analytical needs. On March 14, 2018 we received 25 samples by FedEx for the job
referenced above. 25 samples were received in good condition.
The results in this analysis pertain only to this job, collected on the stated date and should not be used in the interpretation of any other job. This report
may not be duplicated, except in full, without the written consent of Hayes Microbial Consulting, LLC.
This laboratory bears no responsibility for sample collection activities, analytical method limitations, or your use of the test results. Interpretation and
use of test results are your responsibility. Any reference to health effects or interpretation of mold levels is strictly the opinion of Hayes Microbial
Consulting. In no event, shall Hayes Microbial Consulting or any of its employees be liable for lost profits or any special, incidental or consequential
damages arising out of your use of the test results.
Steve Hayes, BSMT(ASCP)
Laboratory Director
Hayes Microbial Consulting, LLC
Page 2 of 6
3/30/20185/23/2018
HMC #18007981
EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
Phone: 970-920-2100
Job Number:
Collected by:
Email:
Jim Baker
healthsafeinspections@gmail.com
Job Name:Clayton C/O Hansen Construction
121 E. Hyman Ave
Aspen CO 81611
Date Collected:
Date Received:
Date Reported:
03/13/2018
03/14/2018
03/21/2018
#Sample Name Description Asbestos Fibers Other Fibers Non- Fibers
1 1 RF TP 1 Fibrous / Brown
(None Detected)
70 % Cellulose fibers
30 %
2 2 RF TP 2 Fibrous / Brown
(None Detected)
70 % Cellulose fibers
30 %
3 3 X STUC 1 Granular / Gray
(None Detected)
(None Detected)
100 %
4 4 X STUC 2 Granular / Gray
(None Detected)
(None Detected)
100 %
5 5 X STUC 3 Brittle / Gray
(None Detected)
(None Detected)
100 %
6 6 X STUC 4 Brittle / Gray
(None Detected)
(None Detected)
100 %
7 7 X STUC 5 Granular / Gray
(None Detected)
(None Detected)
100 %
8 8 ST CW J1 Drywall / White/Brown
(None Detected)
12 % Cellulose fibers
88 %
Layer 2 ST CW J1 Joint Compound / White
(None Detected)
(None Detected)
100 %
9 9 ST CW J2 Drywall / White/Brown
(None Detected)
12 % Cellulose fibers
88 %
Layer 2 ST CW J2 Joint Compound / White
(None Detected)
(None Detected)
100 %
Signature: Date:03/21/2018 Reviewed by: Date:03/21/2018
Page 3 of 6
3/30/20185/23/2018
HMC #18007981
EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
Phone: 970-920-2100
Job Number:
Collected by:
Email:
Jim Baker
healthsafeinspections@gmail.com
Job Name:Clayton C/O Hansen Construction
121 E. Hyman Ave
Aspen CO 81611
Date Collected:
Date Received:
Date Reported:
03/13/2018
03/14/2018
03/21/2018
#Sample Name Description Asbestos Fibers Other Fibers Non- Fibers
10 10 ST CW T1 Texture / White
(None Detected)
(None Detected)
100 %
11 11 ST CW T2 Texture / White
(None Detected)
(None Detected)
100 %
12 12 ST CW T3 Texture / White
(None Detected)
(None Detected)
100 %
13 13 T CW T4 Texture / White
(None Detected)
(None Detected)
100 %
14 14 ST CW T5 Texture / White
(None Detected)
(None Detected)
100 %
15 15 GWP Fibrous / White
(None Detected)
70 % Cellulose fibers
30 %
16 16 PL CW J1 Joint Compound / White
(None Detected)
(None Detected)
100 %
17 17 PL CW J2 Drywall / White/Brown
(None Detected)
12 % Cellulose fibers
88 %
Layer 2 PL CW J2 Joint Compound / White
(None Detected)
(None Detected)
100 %
18 18 PL CW J3 Drywall / White/Brown
(None Detected)
12 % Cellulose fibers
88 %
Layer 2 PL CW J3 Joint Compound / White
(None Detected)
(None Detected)
100 %
Signature: Date:03/21/2018 Reviewed by: Date:03/21/2018
Page 4 of 6
3/30/20185/23/2018
HMC #18007981
EPA 600/R-93, M-4/82-020 (PLM)HealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
Phone: 970-920-2100
Job Number:
Collected by:
Email:
Jim Baker
healthsafeinspections@gmail.com
Job Name:Clayton C/O Hansen Construction
121 E. Hyman Ave
Aspen CO 81611
Date Collected:
Date Received:
Date Reported:
03/13/2018
03/14/2018
03/21/2018
#Sample Name Description Asbestos Fibers Other Fibers Non- Fibers
19 19 PL CW T1 Brittle / White
(None Detected)
(None Detected)
100 %
20 20 PL CW T2 Brittle / White
(None Detected)
(None Detected)
100 %
21 21 PL CW T3 Brittle / White
(None Detected)
(None Detected)
100 %
22 22 PL CW T4 Brittle / White
(None Detected)
(None Detected)
100 %
23 23 PL CW T5 Brittle / White
(None Detected)
(None Detected)
100 %
24 24 PL CW T6 Brittle / White
(None Detected)
(None Detected)
100 %
25 25 PL CW T7 Brittle / White
(None Detected)
(None Detected)
100 %
Signature: Date:03/21/2018 Reviewed by: Date:03/21/2018
Page 5 of 6
3/30/20185/23/2018
HMC #18007981
Asbestos - Additional InformationHealthSafe Inspections
390 Apple Drive
Basalt, CO 81621
Phone: 970-920-2100
All samples were received in acceptable condition unless otherwise noted on the report. The Report must not be used by the client to claim product certification, approval, or
endorsement by: AIHA, NIST, NVLAP NY ELAP, or any agency. The results relate only to the items tested. The results include an inherent uncertainty of measurement associated with
estimating percentages by polarized light microscopy. Measurement uncertainty data can be provided when requested. None detected: Below the detected reporting limit of 1% unless
point counting is performed, then the detected, reporting limit is .25%. Per NY ELAP198.6 (NOB) TEM is the only reliable method to declare an NOB material as Non-Asbestos
Containing. Hayes Microbial Consulting reserves the right to dispose of all samples after a period of 60 days in compliance with state and federal guidelines.
Signature: Date:03/21/2018 Reviewed by: Date:03/21/2018
Page 6 of 6