HomeMy WebLinkAboutMaster Permit.121 E Hyman Ave.0149.2018.ARBKBUILDING PERMIT FEE ESTIMATE
Project Address: 121 E Hyman
Permit Number: TBD
Fee Description
Submittal Fees
Issuance Fees
Total Fees Due
Building Plan Review
$
41,876.25
2,800.00
CMP Area (ft2)
$
41,876.25
Engineering Plan Review
$
5,555.21
Added Commerical Net Leasable
0.00
$
5,555.21
Parks Plan Review
$
91.80
$
91.80
Zoning Plan Review
$
3,202.30
$
3,202.30
$
6,404.60
Construction Mitigation Plan Review
$
2,210.62
$
2,210.62
$
4,421.24
Utility Plan Review
$
500.00
$
500.00
Aspen Energy Code Payment
$
9,663.75
$
9,663.75
City Use Tax Deposit
$
42,336.00
$
42,336.00
County Use Tax Deposit
$
10,330.00
$
10,330.00
Building Permit Fee
$
64,425.00
$
64,425.00
GIS Fee
PATO BE VERIFIED
School Lands Dedication Fee
BY
COA
$
-
$
-
Housing Fee -in -Lieu
$
-
$
-
Parks Impact
$
-
$
-
TDM
$
-
$
-
Parking
To Be Determined
Pedestrian Amenity
To Be Determined
TOTAL PERMIT FEE
$
63,099.93
$
122,503.92
$
185,603.85
Pay ONLY submittal fees at time of permit submission.
Fee estimate does not include Water or Sanitation tap fees or REMP payments due.
The fees calculated here are estimates only and may not be the final fees charged.
Your final fees due will be determined at the issuance of permit.
PROJECT DETAILS
Valuation
$ 4,132,000.00
Project Gross Area (ft2)
4,132.00
Affected Area (Exterior) (ft2)
2,800.00
CMP Area (ft2)
4,132.00
Zoning Review Type
Major Residential
Added Residential Floor Area
0.00
Added Commerical Net Leasable
0.00
Housing FTEs Generated (No more than .1
FTE may be offset with a fee -in -lieu
payment)
0
Andrea & Barry Cayton
2379 Earls Court, Los Angeles, CA 90077
Mr. Justin Barker
Community Development Department
City of Aspen
130 S. Galena Street
Aspen, CO 81611
Re: 121 E. Hyman Avenue
Dear Mr. Barker,
This letter serves to authorize our architect, Mr. Luis Menendez, to act on our behalf for
the purpose of securing all necessary entitlements for the remodel of our duplex unit at
121 E. Hyman Avenue. Please contact me with any questions.
Sincerely,
41 --'-
Brea Layton
Andrea Cayton Trust
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
Commerical
Multi-Family
Single Family
Use of Building Class of Work
New
Addition
AlterationRepair
________
YesNo
Will there be
any roof/wall
penetrations?
NOTICE: This permit becomes null and
void if work or construction authorized
is not commenced within 180 days, or
if construction or work is suspended or
abandoned for a period of 180 days at
any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub
____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher
____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____Ventilation Fans____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-
Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Disturbed Exterior Area: Square footage of lot affected by permit application.
New Sq Ft: Total added square footage for additions to net livable or net leasble space.
Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReviewDEFINITIONS05-18-18
121 E. Hyman Avenue 2735-124-71-002
E & F 69 Ute West Townhomes Lot: A
Andrea Cayton Trust andrea@cayton5.com
Luis Menendez 970-948-8347 LAM@MenendezArchitects.com
Exterior and interior remodel resulting in 5 bedrooms, 5 baths, 1 powder room, storage, laundry, mechanical,
family room, garage, kitchen, living/dining, outdoor deck. Replace all finishes, insulation and windows.
X Duplex
X
X
X
6
1
9
4
1
1
2
2
0
2
0
1 1
2
6,000/3,060
$4,132,000
4,132
3,060/6,000
0
RMF
718
4,132
2,800
2
3
4
8
10
1 1,280
TF
TF
8/16/18
8/16/18
ADDRESS: 121 E. Hyman Avenue PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
Name
Name Tim O'Connell
Phone 970-544-4851 E -mag LAM&MenendezArchitects.com
Phone 970-618-9482 E-mail toconnell(a)hansenhomecare.com
Name Andrea Cavton Trust Phone cell
ddress 2379 Earls Court
city. Los Angeles State CA zIP 90077
Al allress_ andrealc cayton5.com
Atld
AUTHORIZED
Name Luis Menendez Phone 970-544-4851 cell Phone 970-948-8347
715 W. Main Street, Suite 104
LAM@MenendezArchitects.com
Name
Aspen
Cell
CO __ 81611
Ma ling
Ad
�ress city. State ZIP.
Name Luis Menendez Phone 970-544-4851 Cell Phone 970-948-8347
AdaleB 715 W. Main Street, Suite 104 city. Aspen state CO ZIP 81611
AA ress 0805 Buck Point Road city. Carbondale state CO zip 81623
Name Ernest Kollar Engineers Phone 970-963-3223 Cell Phone
Address 320 Main Street, Suite 203 city, Carbondale State CO zip 81623
Name Hansen Construction Phone 970-920-1558 cell
Andress 310 Aspen Business Center city. Aspen State CO zip 81611
Address toconnell a().hansenhomecare.com
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances. governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or ro ct' tin cc liance with all applicable codes.
Slgnaturer _—I __ `Tp"di en�rlf-� fjbA6f.*..3 C1XV.riate 05-18-18
n Check if you area tested o single-family homes on ). You must take a test n complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by: Date: Affidavit on file
CITY OF ASPENAugust2017 130 S. GALENA ST I ASPEN CO 81611
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
If you check any of the boxes below, please consult with the Planner of the Day (plannerofthedayΛgmail.com) before submiƫng your
permit application.
Does your permit involve any of the following?
LAND USE QUESTIONS
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
Part of an approved COA Land Use Review
Work affects net leasable, net livable, or
non-unit space
Work involves lot spliƫng or combining a lot
Work involves exterior of structure
Changing the number of residential units
Changes to number or location of
onsite parking
Work involves Landmark Parcel or Historic District
Located in 100-year Ňood plain or within 100͛ of high
water mark
Work involves changes in occupancy to structure
Changes to elevator or stair configuration
Changes to the use of existing structure or space
Does your permit involve any of the following?
ADDITIONAL SCOPE OF WORK QUESTIONS
Exterior lighting added or changed
Work involves roof penetrations
Work adds, removes, or changes
plumbing fixtures
Disturbs 1,000 sq ft or more of soil within
1Ϯ months
Work occurs in public right of way
Work affects trees or occurs within the
dripline of a tree
Work involves exterior wall penetrations
Work involves digging or excavation
Work involves restaurant or food service
Affects parking spaces/meters, loading zones, or alleys
Adding structures or systems over utility lines
Work within City Mall boundaries
August 2017
121 E. Hyman Avenue
n
n
n
n
n
n
n
n
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUEITY DEVELOPMEET DEPARTMEET
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEE 1ϯ0 S. GALEEA ST ͮ ASPEE, CO 81ϲ11
BUILDING CODE INFORMATION
Ϯ01ϱ IRC
Existing?EFPA 1ϯ EFPA 1ϯ R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# ϯ/ϰ Baths ______ # 1/Ϯ Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
EFPA 1ϯ D
RESCheck UA Alternative
Yes Eo
One Family Two Family
Townhouse
Reviewed By͗ _____________________Date͗__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
Ϯnd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
ϯrd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU?
# Living Rooms_____
# Kitchens _____
# Full Baths _____
# ϯ/ϰ Baths _____
# 1/Ϯ Baths _____
# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
Yes
Eo
PERMIT EUMBER͗ _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing н Eew)
A__B
B (A фϱ0)
F__
H__
I __
E R__
S__
U
M
I
R
C
I
B
C
Ϯ01ϱ IBC
(As Adopted and Amended)
Yes
Eo Required?Yes
Eo Type
January 2018
Ϯ01ϱ IEBC
(As Adopted
and Amended)
Other _____________
Gross Area of Building͗ __________ Gross Area of Unit͗ __________
Occupant Load͗ ___________
n
n n
n n
n n
n
4,236
22
n
2 1
2
5 1
4 1
1
2
4 bedrooms & baths, family room, laundry room, mechanical room, storage room & stair.
Bedroom and bath, entry, garage and stair.
Kitchen, living room, dining room, powder room, pantry, stair and outdoor deck
n
ADDRESS: 121 E. Hyman Avenue PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT �
HOMEOWNER ASSOCIATION COMPLIANCE FORM Im
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS 121 E. Hyman Avenue UNIT# PARCEL ID # 2735-124-71-002
I, the property owner, certify as follows: (pick one)
❑ This property is not subject to a homeowners association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
eThis property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature
Owner Printed Name rea Cayton Trust
MW
Owner's Attorney Signature
Owner's Attorney Printed Name
Date 05-18-18
Date
CITY OF ASPENJanuary2018 130 S. GALENA ST I ASPEN CO 81611
ADDRESS: 121 E. Hyman Avenue PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST „IE CnT.OFAs,
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989 "ban" on asbestos -containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule" and remanded it to the EPA. Thus, much of the original 1989 EPA ban
on the U.S, manufacturing, importation, processing, or distribution in commerce of many asbestos -containing product categories was
set aside and DID NOT TAKE EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
es0No
Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55 -gallon drum of any material besides concrete, wood, bricks, or steel — examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑YesONo
Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55 -gallon drum of any material besides concrete, wood, bricks, or steel — examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
1 hereby certify that the above information is true and complete.
Owner Andrea Cayton Trust Phone #
Applicant (print name) Andrea Cayton Phone #
Applicant Signatu a Date 05-18-18
Please call the City spen Environmental Health Department at 920-5039 at any time if you have questions
about asbestos, interpre#ng your test results, or other matters.
CITY OF ASPENAugust2017 130 S. GALENA ST I ASPEN CO 81611
ADDRESS: 121 E. Hyman Avenue PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT
THL GTi' OF A�,Pt. S
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: Date:
Owner Printed Name:
or,
Authorized Agent Signature: Luis Menende Date: 05-18-18
VC,
Authorized Agent Printed Name:
CITY OF ASPENAugust2017 130 S. GALENA ST
I ASPEN CO 81611
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Applicability: All development projects must comply with the City͛s zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City͛s oning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the oning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The oning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the oning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City͛s oning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information͗
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
Ϯ-For location verification͗ A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
ϯ-For height verification͗ Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
ADDRESS͗ ____________________________PERMIT EUMBER͗ _______________________________
August 2017
121 East Hyman Avenue
PERMIT NUMBER: ADDRESS: 111 F. Hyman Avenue
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY THeC"OFAg�
4 -Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
S -The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6 -All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7 -The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I (contractor name) Tim O'Connell understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans.. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitations.
Contractor Signature:
Date:
05-18-18
CITY OF ASPENAugu:t2017 130 S. GALENA ST I ASPEN CO 81611