Loading...
HomeMy WebLinkAboutMaster Permit.121 E Hyman Ave.0149.2018.ARBKBUILDING PERMIT FEE ESTIMATE Project Address: 121 E Hyman Permit Number: TBD Fee Description Submittal Fees Issuance Fees Total Fees Due Building Plan Review $ 41,876.25 2,800.00 CMP Area (ft2) $ 41,876.25 Engineering Plan Review $ 5,555.21 Added Commerical Net Leasable 0.00 $ 5,555.21 Parks Plan Review $ 91.80 $ 91.80 Zoning Plan Review $ 3,202.30 $ 3,202.30 $ 6,404.60 Construction Mitigation Plan Review $ 2,210.62 $ 2,210.62 $ 4,421.24 Utility Plan Review $ 500.00 $ 500.00 Aspen Energy Code Payment $ 9,663.75 $ 9,663.75 City Use Tax Deposit $ 42,336.00 $ 42,336.00 County Use Tax Deposit $ 10,330.00 $ 10,330.00 Building Permit Fee $ 64,425.00 $ 64,425.00 GIS Fee PATO BE VERIFIED School Lands Dedication Fee BY COA $ - $ - Housing Fee -in -Lieu $ - $ - Parks Impact $ - $ - TDM $ - $ - Parking To Be Determined Pedestrian Amenity To Be Determined TOTAL PERMIT FEE $ 63,099.93 $ 122,503.92 $ 185,603.85 Pay ONLY submittal fees at time of permit submission. Fee estimate does not include Water or Sanitation tap fees or REMP payments due. The fees calculated here are estimates only and may not be the final fees charged. Your final fees due will be determined at the issuance of permit. PROJECT DETAILS Valuation $ 4,132,000.00 Project Gross Area (ft2) 4,132.00 Affected Area (Exterior) (ft2) 2,800.00 CMP Area (ft2) 4,132.00 Zoning Review Type Major Residential Added Residential Floor Area 0.00 Added Commerical Net Leasable 0.00 Housing FTEs Generated (No more than .1 FTE may be offset with a fee -in -lieu payment) 0 Andrea & Barry Cayton 2379 Earls Court, Los Angeles, CA 90077 Mr. Justin Barker Community Development Department City of Aspen 130 S. Galena Street Aspen, CO 81611 Re: 121 E. Hyman Avenue Dear Mr. Barker, This letter serves to authorize our architect, Mr. Luis Menendez, to act on our behalf for the purpose of securing all necessary entitlements for the remodel of our duplex unit at 121 E. Hyman Avenue. Please contact me with any questions. Sincerely, 41 --'- Brea Layton Andrea Cayton Trust COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ Commerical Multi-Family Single Family Use of Building Class of Work New Addition AlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ ______________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT DISTURBEDEXTERIOR AREA SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Engineering Zoning (50%)School Ded. Zoning (50%)CMP (50%)TDM Impact Energy Code REMP Ped. Amenity CMP (50%)Plan Check (Hourly)Housing Cash in Lieu Parks Review Zoning (Hourly)Stormwater Utility Review Engineering (Hourly)City Use Tax GIS County Use Tax SUBMITTAL FEES ISSUANCE FEES _________Lot Area _________Deed Restricted _________Census Code _________# of Dwellings _________Plans Location APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher ____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts ____Forced Air/Gravity Systems ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or Absorption Unit ____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems ____Ventilation Fans____Range Hood ____# of Gas System Outlets ____Snowmelt System Sq Ft_________ Equipment Checklist PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartment Re-viewerSign- Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit. Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration. Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit. Lot Size: Total surveyed square footage of property. Disturbed Exterior Area: Square footage of lot affected by permit application. New Sq Ft: Total added square footage for additions to net livable or net leasble space. Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work. DO YOU LIKE DOGS? December 2017 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ ZONE DISTRICT NeedsReviewDEFINITIONS05-18-18 121 E. Hyman Avenue 2735-124-71-002 E & F 69 Ute West Townhomes Lot: A Andrea Cayton Trust andrea@cayton5.com Luis Menendez 970-948-8347 LAM@MenendezArchitects.com Exterior and interior remodel resulting in 5 bedrooms, 5 baths, 1 powder room, storage, laundry, mechanical, family room, garage, kitchen, living/dining, outdoor deck. Replace all finishes, insulation and windows. X Duplex X X X 6 1 9 4 1 1 2 2 0 2 0 1 1 2 6,000/3,060 $4,132,000 4,132 3,060/6,000 0 RMF 718 4,132 2,800 2 3 4 8 10 1 1,280 TF TF 8/16/18 8/16/18 ADDRESS: 121 E. Hyman Avenue PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET Name Name Tim O'Connell Phone 970-544-4851 E -mag LAM&MenendezArchitects.com Phone 970-618-9482 E-mail toconnell(a)hansenhomecare.com Name Andrea Cavton Trust Phone cell ddress 2379 Earls Court city. Los Angeles State CA zIP 90077 Al allress_ andrealc cayton5.com Atld AUTHORIZED Name Luis Menendez Phone 970-544-4851 cell Phone 970-948-8347 715 W. Main Street, Suite 104 LAM@MenendezArchitects.com Name Aspen Cell CO __ 81611 Ma ling Ad �ress city. State ZIP. Name Luis Menendez Phone 970-544-4851 Cell Phone 970-948-8347 AdaleB 715 W. Main Street, Suite 104 city. Aspen state CO ZIP 81611 AA ress 0805 Buck Point Road city. Carbondale state CO zip 81623 Name Ernest Kollar Engineers Phone 970-963-3223 Cell Phone Address 320 Main Street, Suite 203 city, Carbondale State CO zip 81623 Name Hansen Construction Phone 970-920-1558 cell Andress 310 Aspen Business Center city. Aspen State CO zip 81611 Address toconnell a().hansenhomecare.com INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances. governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or ro ct' tin cc liance with all applicable codes. Slgnaturer _—I __ `Tp"di en�rlf-� fjbA6f.*..3 C1XV.riate 05-18-18 n Check if you area tested o single-family homes on ). You must take a test n complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by: Date: Affidavit on file CITY OF ASPENAugust2017 130 S. GALENA ST I ASPEN CO 81611 COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 If you check any of the boxes below, please consult with the Planner of the Day (plannerofthedayΛgmail.com) before submiƫng your permit application. Does your permit involve any of the following? LAND USE QUESTIONS ADDRESS: ____________________________PERMIT NUMBER: _______________________________ Part of an approved COA Land Use Review Work affects net leasable, net livable, or non-unit space Work involves lot spliƫng or combining a lot Work involves exterior of structure Changing the number of residential units Changes to number or location of onsite parking Work involves Landmark Parcel or Historic District Located in 100-year Ňood plain or within 100͛ of high water mark Work involves changes in occupancy to structure Changes to elevator or stair configuration Changes to the use of existing structure or space Does your permit involve any of the following? ADDITIONAL SCOPE OF WORK QUESTIONS Exterior lighting added or changed Work involves roof penetrations Work adds, removes, or changes plumbing fixtures Disturbs 1,000 sq ft or more of soil within 1Ϯ months Work occurs in public right of way Work affects trees or occurs within the dripline of a tree Work involves exterior wall penetrations Work involves digging or excavation Work involves restaurant or food service Affects parking spaces/meters, loading zones, or alleys Adding structures or systems over utility lines Work within City Mall boundaries August 2017 121 E. Hyman Avenue n n n n n n n n Code Editions Fire Sprinkler System Type Of Construction Fire Alarms Installed Required Special Inspections Energy Code Compliance Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________ Building Type/Occupancy Group COMMUEITY DEVELOPMEET DEPARTMEET BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEE 1ϯ0 S. GALEEA ST ͮ ASPEE, CO 81ϲ11 BUILDING CODE INFORMATION Ϯ01ϱ IRC Existing?EFPA 1ϯ EFPA 1ϯ R High-Strength Bolting Epoxy Anchors Structual Steel Welding Permanent Micropiles Other _____________ Prescriptive Table UNIT DESCRIPTION AS PROPOSED # Stories Above Grade ______ # Stories Below Grade _______ Parking Spaces ______ Parking Spaces ______ Parking Spaces ______ # Bedrooms ______ # Full Baths ______ Deck Area ______ # ϯ/ϰ Baths ______ # 1/Ϯ Baths ______ # Kitchens ______ # Wood Fireplaces ______ # Gas Appliances ______ # Gas Logs______ EFPA 1ϯ D RESCheck UA Alternative Yes Eo One Family Two Family Townhouse Reviewed By͗ _____________________Date͗__________ BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement ___________________________________________________________________________________ ___________________________________________________________________________________________ Main Level __________________________________________________________________________________ ____________________________________________________________________________________________ Ϯnd Floor ___________________________________________________________________________________ __________________________________________________________________________________________ ϯrd Floor ___________________________________________________________________________________ ___________________________________________________________________________________________ Additional ___________________________________________________________________________________ ___________________________________________________________________________________________ Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____ # Kitchens _____ # Full Baths _____ # ϯ/ϰ Baths _____ # 1/Ϯ Baths _____ # Bedrooms _____ # Other Rooms (List)____________ ADU BUILDING DESCRIPTION Yes Eo PERMIT EUMBER͗ _______________________________ (As Adopted and Amended) Other (Please Explain) _________________ _________________ VA VB IV IIIA IIIB IIA IIB IA IB Sprayed Fire-Resistants COMCheck UA Alternative (Existing н Eew) A__B B (A фϱ0) F__ H__ I __ E R__ S__ U M I R C I B C Ϯ01ϱ IBC (As Adopted and Amended) Yes Eo Required?Yes Eo Type January 2018 Ϯ01ϱ IEBC (As Adopted and Amended) Other _____________ Gross Area of Building͗ __________ Gross Area of Unit͗ __________ Occupant Load͗ ___________ n n n n n n n n 4,236 22 n 2 1 2 5 1 4 1 1 2 4 bedrooms & baths, family room, laundry room, mechanical room, storage room & stair. Bedroom and bath, entry, garage and stair. Kitchen, living room, dining room, powder room, pantry, stair and outdoor deck n ADDRESS: 121 E. Hyman Avenue PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT � HOMEOWNER ASSOCIATION COMPLIANCE FORM Im All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS 121 E. Hyman Avenue UNIT# PARCEL ID # 2735-124-71-002 I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. eThis property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature Owner Printed Name rea Cayton Trust MW Owner's Attorney Signature Owner's Attorney Printed Name Date 05-18-18 Date CITY OF ASPENJanuary2018 130 S. GALENA ST I ASPEN CO 81611 ADDRESS: 121 E. Hyman Avenue PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST „IE CnT.OFAs, ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days, weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989 "ban" on asbestos -containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule" and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S, manufacturing, importation, processing, or distribution in commerce of many asbestos -containing product categories was set aside and DID NOT TAKE EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST es0No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55 -gallon drum of any material besides concrete, wood, bricks, or steel — examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑YesONo Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55 -gallon drum of any material besides concrete, wood, bricks, or steel — examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. 1 hereby certify that the above information is true and complete. Owner Andrea Cayton Trust Phone # Applicant (print name) Andrea Cayton Phone # Applicant Signatu a Date 05-18-18 Please call the City spen Environmental Health Department at 920-5039 at any time if you have questions about asbestos, interpre#ng your test results, or other matters. CITY OF ASPENAugust2017 130 S. GALENA ST I ASPEN CO 81611 ADDRESS: 121 E. Hyman Avenue PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFADAVIT THL GTi' OF A�,Pt. S AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: Date: Owner Printed Name: or, Authorized Agent Signature: Luis Menende Date: 05-18-18 VC, Authorized Agent Printed Name: CITY OF ASPENAugust2017 130 S. GALENA ST I ASPEN CO 81611 COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 Applicability: All development projects must comply with the City͛s zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City͛s oning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the oning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The oning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the oning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City͛s oning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information͗ 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. Ϯ-For location verification͗ A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. ϯ-For height verification͗ Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed measurement. Additional roof plans showing location of measurements may be necessary. ADDRESS͗ ____________________________PERMIT EUMBER͗ _______________________________ August 2017 121 East Hyman Avenue PERMIT NUMBER: ADDRESS: 111 F. Hyman Avenue COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THeC"OFAg� 4 -Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. S -The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6 -All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7 -The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) Tim O'Connell understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans.. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: Date: 05-18-18 CITY OF ASPENAugu:t2017 130 S. GALENA ST I ASPEN CO 81611