HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (7).ARBK0025-2017-ARBK_BuildingComments_2 124 W Hallam
Page: 1
File Name: 170627 308 N. First St - Permit Resubmit.pdf
Subject: PlanCheck
Author: nickt
Color:
Please submit the completed
special inspection agreement
form. It does not appear to be in
your latest response.
170627 308 N. First St - Permit Resubmit.pdf (2)
Page: 1
File Name: 170627 308 N. First St - Permit Resubmit.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide stamped design
drawings of the permanent
micropiles. Minimum factor of
safety is 2. Your response says
it will be provided by others.
Please provide it.
Page: 3
File Name: MECHANICAL
DRAWINGS_REVISION1.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
The dryer vents appear to
terminate less than 3' from
window 15 which is operable.
Move the vents to be at least 3'
away. 2009 IMC 501.
MECHANICAL DRAWINGS_REVISION1.2017.06.29.pdf (1)
Page: 1
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Asbestos abatement clearance
letter will be required prior to
sign off.
PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf (11)
Page: 1
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Revise gross floor area plans on
Z-106 to measure areas to the
INSIDE of exterior walls but still
include the exterior usuable
covered areas. Also, get it out of
the Z sheets and put it on an A
sheet.
A SPECIAL INSPECTION
Please submit the completed special
inspection agreement form. It does not
appear to be in your latest response.
INSPECTIONS AND TESTING
Class
Provide stamped design drawings of
the permanent micropiles. Minimum
factor of safety is 2. Your response
says it will be provided by others.
Please provide it.
The dryer vents
appear to terminate
less than 3' from
window 15 which is
operable. Move the
vents to be at least 3'
away. 2009 IMC 501.
Asbestos abatement clearance letter will be
required prior to sign off.
Revise gross floor area plans on Z-106 to measure areas to the
INSIDE of exterior walls but still include the exterior usuable
covered areas. Also, get it out of the Z sheets and put it on an
A sheet.
SIGNED SPECIAL INSPECTION
LETTER INCLUCED IN RESPONSE
DRYER VENTS HAVE BEEN RELOCATED.
NEARBY WINDOW IS FIXED. SEE
MECHANICAL SHEET M-3
ASBESTOS ABATEMENT AND
STATE DEMO PERMIT INCLUDED
SEE REVISED GROSS AREA FLOOR
PLANS. SHEET NAME REVISED TO
A-001.00
FORTHCOMING
09/14/2017
Page: 6
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Note which specific windows
need window fall protection and
provide a spec on a product
complying with ASTM F2090.
Page: 14
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Door 209 appears to have a
step. Provide landing heights on
either side. Door may not swing
over a step (2009 IRC R311.3.1)
Page: 14
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide the finish floor elevation
of the 2nd floor decks. Comply
with 2009 IRC R311.3
Page: 15
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
The provided microinverter cut
sheets do not note which type
you have selected. Provide the
capacity of the inverters. If it is
less than the capacity of the
panels, the lesser wattage will
be used for calculating REMP
credit. Revise REMP worksheet
as necessary.
Page: 15
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide primary and secondary
roof drains to the link roof.
Note which specific
windows need window
fall protection and
provide a spec on a
product complying
with ASTM F2090.
Door 209 appears to
have a step. Provide
landing heights on
either side. Door may
not swing over a step
(2009 IRC R311.3.1)
Provide the finish floor
elevation of the 2ndfloor decks. Comply
with 2009 IRC R311.3
The providedmicroinverter cutsheets do not notewhich type you haveselected. Provide thecapacity of theinverters. If it is less
than the capacity ofthe panels, the lesserwattage will be usedfor calculating REMPcredit. Revise REMPworksheet asnecessary.
Provide primary and
secondary roof drains
to the link roof.
LINKING ELEMENT ROOF TO HAVE PRIMARY ROOF DRAIN
AND SECONDARY DRAINAGE WILL BE HANDLED BY
FLOWING OVER METAL PARAPET (OUTBOARD OF ALL
FACADE MATERIALS, 2" MAX HEIGHT. SEE SHEET A-504.00
FOR MORE INFORMATION
SEE ATTACHED MICROINVERTER CUTSHEET
WITH SELECTION/SPEC. INFO. IN 'ENERGY
DOCUMENTS' FOLDER
FLOOR ELEVATIONS HAVE BEEN
ADDED TO FLOOR PLAN SHEETS
SEE SHEET A-700.00 FOR LANDING
HEIGHTS. DOOR DOES NOT SWING
OVER STEP.
NOTED ON FLOOR PLANS AS WELL AS IN WINDOW SCHEDULE.
OPERABLE WINDOWS PERFORMING AS EGRESS WINDOWS TO BE FITTED WITH
SAFEGARD CASEMENT WINDOW OPENING CONTROL DEVICE - SPEC INLCUDED
09/14/2017
Page: 15
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide sheets A632 and A640.
Page: 15
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide primary and secondary
roof drains to the roof deck and
bottom landing of the roof deck
stairs.
Page: 28
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide the R values of
insulation at the window well and
make it match the REScheck.
Page: 47
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
Subject: PlanCheck
Author: nickt
Color:
Stair riser openings must be
LESS than 4"
Provide sheets A632
and A640.
Provide primary and
secondary roof drains
to the roof deck and
bottom landing of the
roof deck stairs.
Provide the R valuesof insulation at the
window well and makeit match theREScheck.
Stair riser openings
must be LESS than 4"
SHEETS HAVE BEEN INCLUDED
ROOF DECK HAS BEEN REVISED TO INCLUDED PRIMARY-SECONDARY ROOF DRAIN WHERE NOTED.
SECONDARY STAIR DRAIN TO BE SIZED TO ACCOMMODATE ROOF DECK
SEE REVISED NOTE ON SHEET A-720.00,
DETAIL 6
REScheck HAS BEEN REVISED. ALSO
SEE REVISED SHEET A-500.00 FOR
MORE WALL ASSEMBLY INFO.
09/14/2017