Loading...
HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (7).ARBK0025-2017-ARBK_BuildingComments_2 124 W Hallam Page: 1 File Name: 170627 308 N. First St - Permit Resubmit.pdf Subject: PlanCheck Author: nickt Color: Please submit the completed special inspection agreement form. It does not appear to be in your latest response. 170627 308 N. First St - Permit Resubmit.pdf (2) Page: 1 File Name: 170627 308 N. First St - Permit Resubmit.pdf Subject: PlanCheck Author: nickt Color: Provide stamped design drawings of the permanent micropiles. Minimum factor of safety is 2. Your response says it will be provided by others. Please provide it. Page: 3 File Name: MECHANICAL DRAWINGS_REVISION1.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: The dryer vents appear to terminate less than 3' from window 15 which is operable. Move the vents to be at least 3' away. 2009 IMC 501. MECHANICAL DRAWINGS_REVISION1.2017.06.29.pdf (1) Page: 1 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Asbestos abatement clearance letter will be required prior to sign off. PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf (11) Page: 1 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Revise gross floor area plans on Z-106 to measure areas to the INSIDE of exterior walls but still include the exterior usuable covered areas. Also, get it out of the Z sheets and put it on an A sheet. A SPECIAL INSPECTION Please submit the completed special inspection agreement form. It does not appear to be in your latest response. INSPECTIONS AND TESTING Class Provide stamped design drawings of the permanent micropiles. Minimum factor of safety is 2. Your response says it will be provided by others. Please provide it. The dryer vents appear to terminate less than 3' from window 15 which is operable. Move the vents to be at least 3' away. 2009 IMC 501. Asbestos abatement clearance letter will be required prior to sign off. Revise gross floor area plans on Z-106 to measure areas to the INSIDE of exterior walls but still include the exterior usuable covered areas. Also, get it out of the Z sheets and put it on an A sheet. SIGNED SPECIAL INSPECTION LETTER INCLUCED IN RESPONSE DRYER VENTS HAVE BEEN RELOCATED. NEARBY WINDOW IS FIXED. SEE MECHANICAL SHEET M-3 ASBESTOS ABATEMENT AND STATE DEMO PERMIT INCLUDED SEE REVISED GROSS AREA FLOOR PLANS. SHEET NAME REVISED TO A-001.00 FORTHCOMING 09/14/2017 Page: 6 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Note which specific windows need window fall protection and provide a spec on a product complying with ASTM F2090. Page: 14 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Door 209 appears to have a step. Provide landing heights on either side. Door may not swing over a step (2009 IRC R311.3.1) Page: 14 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Provide the finish floor elevation of the 2nd floor decks. Comply with 2009 IRC R311.3 Page: 15 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: The provided microinverter cut sheets do not note which type you have selected. Provide the capacity of the inverters. If it is less than the capacity of the panels, the lesser wattage will be used for calculating REMP credit. Revise REMP worksheet as necessary. Page: 15 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Provide primary and secondary roof drains to the link roof. Note which specific windows need window fall protection and provide a spec on a product complying with ASTM F2090. Door 209 appears to have a step. Provide landing heights on either side. Door may not swing over a step (2009 IRC R311.3.1) Provide the finish floor elevation of the 2ndfloor decks. Comply with 2009 IRC R311.3 The providedmicroinverter cutsheets do not notewhich type you haveselected. Provide thecapacity of theinverters. If it is less than the capacity ofthe panels, the lesserwattage will be usedfor calculating REMPcredit. Revise REMPworksheet asnecessary. Provide primary and secondary roof drains to the link roof. LINKING ELEMENT ROOF TO HAVE PRIMARY ROOF DRAIN AND SECONDARY DRAINAGE WILL BE HANDLED BY FLOWING OVER METAL PARAPET (OUTBOARD OF ALL FACADE MATERIALS, 2" MAX HEIGHT. SEE SHEET A-504.00 FOR MORE INFORMATION SEE ATTACHED MICROINVERTER CUTSHEET WITH SELECTION/SPEC. INFO. IN 'ENERGY DOCUMENTS' FOLDER FLOOR ELEVATIONS HAVE BEEN ADDED TO FLOOR PLAN SHEETS SEE SHEET A-700.00 FOR LANDING HEIGHTS. DOOR DOES NOT SWING OVER STEP. NOTED ON FLOOR PLANS AS WELL AS IN WINDOW SCHEDULE. OPERABLE WINDOWS PERFORMING AS EGRESS WINDOWS TO BE FITTED WITH SAFEGARD CASEMENT WINDOW OPENING CONTROL DEVICE - SPEC INLCUDED 09/14/2017 Page: 15 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Provide sheets A632 and A640. Page: 15 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Provide primary and secondary roof drains to the roof deck and bottom landing of the roof deck stairs. Page: 28 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Provide the R values of insulation at the window well and make it match the REScheck. Page: 47 File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf Subject: PlanCheck Author: nickt Color: Stair riser openings must be LESS than 4" Provide sheets A632 and A640. Provide primary and secondary roof drains to the roof deck and bottom landing of the roof deck stairs. Provide the R valuesof insulation at the window well and makeit match theREScheck. Stair riser openings must be LESS than 4" SHEETS HAVE BEEN INCLUDED ROOF DECK HAS BEEN REVISED TO INCLUDED PRIMARY-SECONDARY ROOF DRAIN WHERE NOTED. SECONDARY STAIR DRAIN TO BE SIZED TO ACCOMMODATE ROOF DECK SEE REVISED NOTE ON SHEET A-720.00, DETAIL 6 REScheck HAS BEEN REVISED. ALSO SEE REVISED SHEET A-500.00 FOR MORE WALL ASSEMBLY INFO. 09/14/2017