HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (8).ARBK0025-2017-ARBK_BuildingComments_1 Page: 1 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide floor plans showing "gross floor area" as defined by the 2009 IBC. Include covered usable outdoor spaces. A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf (27) Page: 1 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide an asbestos abatement clearance letter. Page: 6 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Operable windows with sill heights less than 24" above finish floor and more than 72" above exterior grade require window fall protection devices listed to ASTM F2090 per 2009 IRC R612.3 Provide a spec and on the plans note all windows that will require it. Page: 6 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Note all windows that require safety glazing on the plans or window schedule including windows per 2009 IRC R308.4: 7, 12, 13, 14, 15, 16, 23, 24, 25, 26, 30, 32, 33, 34, 35, 36, 37, 38, 39. Page: 6 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Windows 23, 24, 25, and 26 are noted as being existing to remain. You are placing a bathtub next to them, requiring them to be safety glazed per 2009 IRC R308.4. Using a film to provide the safety glazing is an acceptable option; provide a spec. Provide floor plans showing "gross floor area" as defined by the 2009 IBC. Include covered usable outdoor spaces. Provide an asbestos abatement clearance letter. Operable windows with sill heights less than 24" above finish floor and more than 72" above exterior grade require window fall protection devices listed to ASTM F2090 per 2009 IRC R612.3 Provide a spec and on the plans note all windows that will require it. Note all windows that require safety glazing on the plans or window schedule including windows per 2009 IRC R308.4: 7, 12, 13, 14, 15, 16, 23, 24, 25, 26, 30, 32, 33, 34, 35, 36, 37, 38, 39. Windows 23, 24, 25, and 26 are noted asbeing existing toremain. You areplacing a bathtub nextto them, requiring them to be safetyglazed per 2009 IRC R308.4. Using a film toprovide the safety glazing is anacceptable option; provide a spec. SEE NEW SHEET Z-106.00 GROSS FLOOR AREA WITH GROSS FLOOR AREAS CALCULATED. OWNER TO PROVIDE ABATEMENT LETTER. ALL WINDOWS FALLING UNDER THESE CRITERIA TO HAVE LIMITER FALL-PROTECTION DEVICES WITH MAX. OPENING 4". SEE NOTE #12 ON WINDOW SCHEDULE SHEET G-106.00 WINDOWS LISTED TO HAVE TEMPERED SAFETY GLAZING. SEE WINDOW SCHEDULE NOTE #11 FOR MORE INFORMATION. WINDOWS LISTED ARE TO BE REPLACEMENT WINDOWS WITH TEMPERED SAFETY GLAZING OR SAFETY FILM. SEE NOTE #10 ON WINDOW SCHEDULE ON SHEET G-106.00 City of Aspen Received 06/23/17 Building Department Page: 12 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide a fireplace registration form and installation instructions for each fireplace. Page: 13 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide a handrail at the link stairs (greater than 3 risers). Page: 13 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide the installation instructions for the firepit insert. Include requirements for clearances to combustibles including the nearby building and roof overhang. Page: 13 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide the finish elevation of the landings on either side of each exterior door and the height of the threshold. (2009 IRC R311) Page: 15 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide install instructions for the firepits showing required clearances to combustibles, then demonstrate compliance. Provide a fireplaceregistration form andinstallation instructionsfor each fireplace. Provide a handrail at the link stairs (greater than 3 risers). Provide the installation instructions for the firepit insert. Include requirements for clearances to combustibles including the nearby building and roof overhang. Provide the finishelevation of thelandings on either sideof each exterior doorand the height of thethreshold. (2009 IRCR311) Provide install instructions for the firepits showing required clearances to combustibles, then demonstrate compliance. FIREPLACE REGISTRATION FORM PROVIDED HANDRAIL AT LINK STAIR HAS BEEN DRAWN. SEE SHEET A111.00 NEW EXTERIOR FIREPLACE SPEC. HAS BEEN PROVIDED. SEE FINISH ELEVATION TAGS ON SHEET A111.00 FIREPIT ON ROOF DECK HAS BEEN REMOVED. SEE SCHEDULE City of Aspen Received 06/23/17 Building Department Page: 15 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: Snow stops Author: nickt Color: Provide snow stops at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities, or adjacent properties per Ordinance 30, 2011. Page: 15 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: secondary drains Author: nickt Color: Provide primary and secondary drains from all flat roofs, including the green roofs and exterior stair landing. Secondary drainage must be above the primary drain inlet but below window and door thresholds. Show the location of the secondary drain terminations which must be above grade in a location that would be observed by occupants. 2009 IPC 1107 Page: 19 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Is this where door 107 goes? Page: 28 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: The portion of basement wall exposed at the window well needs the R-15 insulation or enter it in REScheck with 0 insulation as you have it currently drawn on 2/A500. Though it really ought to have insulation. Please avoid cold bridges. Page: 29 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: R-46 min at the slab on grade in the basement? You mean R-10? Provide snow stops at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities, or adjacent properties per Ordinance 30, 2011. Provide primary and secondary drains from all flat roofs, including the green roofs and exterior stair landing. Secondary drainage must be above the primary drain inlet but below window and door thresholds. Show the location of the secondary drain terminations which must be above grade in a location that would be observed by occupants. 2009 IPC 1107 Is this where door 107 goes? The portion ofbasement wallexposed at the window well needs the R-15 insulation or enter it in REScheckwith 0 insulation asyou have it currentlydrawn on 2/A500.Though it really ought to have insulation. Please avoid cold bridges. R-46 min at the slab on grade in the basement? You mean R-10? SEE ROOF PLAN SHEET A113.00. SNOW STOPS HAVE BEEN ADDED ABOVE AREAS WHERE SNOW COULD SHED TO WALKWAYS, STAIRS, DECKS ETC SEE NOTES ON ROOF PLAN SHEET A113.00. PRIMARY AND SECONDARY ROOF DRAINS TO BE PROVIDED PER 2009 IRC CODE. SEE CIVIL DRAWINGS SEE DOOR 107 DRAWN ON SHEET A300.00 BASEMENT WALL TO HAVE R-15 INSULATION. SEE SHEET A500.00 NOTE HAS BEEN CHANGED FROM R-46 TO R-10 City of Aspen Received 06/23/17 Building Department Page: 29 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Is the shake roof truly existing to remain? If it is disturbed or replaced, it must be replaced with a Class B roof assembly. (Ord 31, 2011) Page: 29 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: The section of wall shown on 4/A610 has no insulation. Enter it in REScheck as having 0 insulation or revise plans and REScheck to match. Page: 31 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Glass guard must resist 200lb point load and be safety glazed. Page: 32 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: The tops of your basement wall must have insulation matching REScheck or revise REScheck to show 0 insulation for this portion of wall. Page: 37 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Detail 1/A620 is lacking waterproofing and flashing. Revise. Is the shake roof truly existing to remain? If it is disturbed or replaced, it must be replaced with a Class B roof assembly. (Ord 31, 2011) The section of wall shown on 4/A610 has no insulation. Enter it in REScheck as having 0 insulation or revise plans and REScheck to match. Glass guard must resist 200lb point load and be safety glazed. The tops of your basement wall must have insulation matching REScheck or revise REScheck to show 0 insulation for this portion of wall. Detail 1/A620 is lacking waterproofing and flashing. Revise. SEE EXTERIOR DETAIL 6 / A610.00; CEDAR SHAKE SHINGLES TO BE REPLACED WITH CEDAR SHINGLES (CUT) FIRE-TREATED. DEN DECK, 1-HR RATED SHEATHING AND BUILDING PAPER TO BE USED TO ACHIEVE CLASS B ROOF ASSEMBLY. BASEMENT WALL TO HAVE INSULATION VALUES CALCULATED ON RESCHECK. DRAWINGS REVISED AND BUBBLED. GLASS GUARDRAILS TO BE SET IN PROPRIETARY GLASS 'SHOE' PRODUCT AND BE DESIGNED BY STRUCTURAL ENGINEER TO RESIST 200LB POINT LOAD. GLASS TO BE LAMINATED TEMPERED GLASS, 9/16". SEE LETTER FROM STRUCTURAL ENG. BASEMENT WALL TO HAVE INSULATION VALUES CALCULATED ON RESCHECK. DRAWINGS REVISED AND BUBBLED. DETAIL 1/A620.00 REVISED TO HAVE WATERPROOFING AND CUSTOM SILL PAN. SEE SHEET City of Aspen Received 06/23/17 Building Department Page: 37 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: The waterproofing membrane at 7/A620 does not extend high enough to protect the structure from water intrusion. Page: 41 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: One of the handrails must be continuous for the full flight of stairs. Revise 1/A701 Page: 42 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: An elevator permit will be required through NWCOGG. Page: 43 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide a spec on the skylight. Must be laminated with a minimum 0.03" pvb interlayer (2009 IRC R308.6). Page: 46 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: Glass Guards Author: nickt Color: Provide a detail on the glass guard connections. Must support a 200 lb point load. 2009 IRC R309. The waterproofing membrane at 7/A620 does not extend high enough to protect the structure from water intrusion. One of the handrails must be continuous for the full flight of stairs. Revise 1/A701 An elevator permit will be required through NWCOGG. Provide a spec on theskylight. Must belaminated with aminimum 0.03" pvb interlayer (2009 IRC R308.6). Provide a detail on the glass guard connections. Must support a 200 lb point load. 2009 IRC R309. DETAIL HAS BEEN REVISED FOR ADEQUATE WATERPROOFING PROTECTION PERMIT WILL BE REQUIRED. SEE NOTE ON SHEET A705.00 REVISED. SEE SHEET A113.00 GLASS GUARDRAILS TO BE SET IN PROPRIETARY GLASS 'SHOE' PRODUCT AND BE DESIGNED BY STRUCTURAL ENGINEER TO RESIST 200LB POINT LOAD. NO LONGER A WALL-TO-WALL SPAN. GLASS TO BE LAMINATED TEMPERED GLASS, 9/16". SEE LETTER FROM STRUCTURAL ENG. SPEC SHEET INCLUDED FOR FULL SKYLIGHT SPECS. LAMINATED GLASS; TWO LITES INTERLEAVED W/ PVB OF 0.030" -SKYLIGHT SPEC DOCUMENT INCLUDED IN ARCH FOLDER City of Aspen Received 06/23/17 Building Department Page: 46 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Dimension the opening size of the open risers on detail 3/A720. Must be less than 4". Page: 47 File Name: A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide a complete fireplace registration form and installation instructions for all fireplaces. Page: 1 File Name: D. STRUCTURAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Revise the special inspection program to include the permanent micropiles. D. STRUCTURAL DRAWINGS.2017.03.08.pdf (3) Page: 1 File Name: D. STRUCTURAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide a signed special inspection agreement form for the items listed in the special inspection program including the following: -Structural steel welding: Field & Shop -High strength bolting -Permanent micropiles Page: 14 File Name: D. STRUCTURAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide design drawings of the permanent micropiles. Minimum factor of safety should be 2. (2009 IBC 1810.3.3.1.7). Dimension the opening size of the open risers on detail 3/A720. Must be less than 4". Provide a complete fireplace registration form and installation instructions for all fireplaces. 1S101 1S101 S1011 REFERENCEXXX' - YY" 00 YY" CXBPX xxK F?XX'-XX" S S *CIP CONCRETE SHO XX'-YY" RL SIZE e with addition with two levelst of both isolated and stripaming with wood infill, andms are wood shear walls.stem designed by specialty Contractor is responsible for alltions as well as for all material ectural drawings on the project tion of this project withoutcal documents. be deficiencies, omissions,ght to the attention of theshall be issued before affected and explicitly in writing of anyt documents. Contractor shallnts by virtue of the Structuralss the Contractor has clearly andy deviations or substitutions at ered approximate and shall be fieldial.rchitect/Engineer.on or rehabilitation of an existingng existing conditions, the if any existing condition deviates ng materials or proceeding withal Engineer shall be informed instruction.any existing structural elementse the function of an existingmination of its function will be programs and precautions sons and property either on ormage, or loss.al materials are solely the on of construction of the projectntractor is responsible for means,the structure to support loadsporary bracing, shoring, and/or hall be made in any structural he structural drawings. Refer to are not located nor dimensionedte such locations and ings and submit for review.ceptance and shall be specifically ngs, and details with the Wind Loading Basic Wind Speed 115 MPH Exposure Category B GCpi 0.18 Wind Base Shear 7.6 K / 17.3 K Wind Design Pressure Components & Cladding 50sqft East-West North-South Seismic Loading 1.0 Mapped Spectral Response Acceleration Seismic Importance Factor, Ie 0.314Ss 0.082S1 DSite Class Spectral Response Coefficients 0.324Sds 0.131Sd1 BSeismic Design Category Light Frame Wood Shear WallsBasic Seismic Force Resisting System 6.5Response Modification Factor, R 0.050Seismic Response Coefficient, Cs Equivalent Lateral Force AnalysisAnalysis Procedure Used Seismic Base Shear 4.2 K / 5.1 KEast/West North/South Snow Loading 100 PSFGround Snow Load, Pg 70 PSFMinimum Flat Roof Snow Load, Pf 1.0Importance Factor, Is BTerrain Category 1.0Exposure Factor, Ce 1.0Thermal Factor, Ct 1.0 TYP, 0.69 at victorian11:12 pitchSlope Factor, Cs Live Loads and Superimposed Dead Loads Foundations (Note 2) (Notes 3,4,6) (Notes 5,6) Local Jurisdiction: City of Aspen Building Code: 2015 International Building Code Geotechnical Engineer Information: Steven L. Pawlak and PE# 15222 -16.6 PSFInterior Roof Zone (Zone 1) -19.7 PSFRoof End Zone (Zone 2) -19.7 PSFCorner Roof Zone (Zone 3) -18.4 PSFInterior Wall Zone (Zone 4) -21.2 PSFWall End Zone (Zone 5) STRUCTURAL DESIGN CRITERIA Building Category: II 20sqft -17.8 PSF -21.0 PSF -21.0 PSF -19.5 PSF -23.5 PSF 100sqft -16.0 PSF -18.8 PSF -18.8 PSF -17.6 PSF -19.5 PSF (Note 1) Addition / Victorian 12.2 K / 11.5 K Addition / Victorian 4.2 K / 5.1 K SPECIAL INSPECTION1. Special inspection and testing shall be performed as required by the local jurisdiction, thebuilding code and the construction documents. See quality assurance section of the generalnotes.2. Coordinate and schedule inspection and testing prior to the start of work requiringinspection and testing while providing special inspection reasonable notice.3. All deficiencies shall be corrected for acceptance by the testing agency.4. Inspections performed by the local jurisdiction do not replace inspection or testing requiredby the owners testing agency.5. Special inspection and testing is required for the items shown in the special inspections and SPECIAL INSPECTIONS AND TESTING ClassCategory/Material X 54321Component/Work Footing Soil Bearing Material Soils andFoundationsXSlab-on-Grade Subgrade Material XXXCompaction X XX XX XX XX Formwork Installation Reinforcing Placement Steel Embeds Cast Embedded Anchors Concrete Strength, Slump, Temperature, and Air Content X X XX Concrete Placement Concrete Curing Post-Installed AnchorsCast-in-Place ConcreteX XXFabrication Facility XXStructural Steel Erection XXConnection Erection and AssemblyPretensioned and Slip Critical Bolts/Joints Using Turn-of-Nut without Matchmarking or Calibrated WrenchMethods of Installation XXXSingle Pass Fillet Welds 5/16" or Less All Other Welds Including Complete and PartialPenetration Groove Welds XXDeck Placement and Attachment XXX XXX Structural SteelX Steel Decking NOTES:1. Special inspection and testing are to conform to chapter 17 of the IBC and the local buildingdepartment.2. Unless noted as continuous inspection, all inspections are periodic. Periodic inspection is defined aspart-time or intermittent inspection of the work. It is the Special Inspector's responsibility to determineand coordinate the frequency and duration of the inspection relative to the Contractor's schedule andsequencing of the work in order to meet the inspection and reporting requirements.3. Class 1: Inspection verification of size, location, quantity, and tolerance.4. Class 2: Inspection and testing verification of strength, grade, classification, quality, density,proportions, and manufacturers certified test reports.5. Class 3: Continuous inspection and verification of operations and conditions.6. Class 4: Audit and inspection of fabrication facility's quality control program, and collection of facilitiesrecords during the course of fabrication for Class 2 and 3 inspections and testing.7. Class 5: Verification of certifications X XXConnection Erection and Assembly Pretensioned and Slip Critical Bolts/Joints Using Turn-of-Nut without Matchmarking or Calibrated WrenchMethods of Installation XXXSingle Pass Fillet Welds 5/16" or LessAll Other Welds Including Complete and PartialPenetration Groove Welds XXX XXX XFabricationErectionXXVerification of mix design use on site (prior to placement) ABBREVIATIONS L lengthLAT lateralLBS poundsLLH long leg horizontalLLV long leg verticalLONG longitudinalLSL laminated strand lumberLVL laminated veneer lumberLW, LWT lightweight MAS masonryMAX maximumMECH mechanicalMFR manufacturerMIN minimumMTL metal (N) new constructionNo NumberNOM nominalNS near sideNW, NWT normal weight OC on centerOF outside faceOH opposite handOPNG opening PAF powder acutuated fastenerPC precastPERP perpendicularPERT pre-engineered roof trussPJP partial joint penetrationPL, H platePLF pounds per lineal footPSL parallel strand lumberPT post-tensioningPT pressure treated RE: referenceREINF reinforcementREQD requiredRET retaining SC slip criticalSCHED scheduleSCL structural composite lumberSIP structural insulated panelSOG slab on gradeSPA spacingSTFNR stiffenerSTL steelSUBFLR subfloor T/, TOx top of (S=slab, C=conc, etc)THK thicknessTL transfer loadTRAN transverseTYP typical UNO unless noted otherwise VERT verticalVIF verify in field W widthWP work pointWWF welded wire fabric ABBREVIATIONS AB anchor boltADDNL additionalAFF above finish floorALT alternateARCH architectural BLDG buildingBM beamBOT, B/, BOx bottom of (S=slab, C=conc, etc)BRG bearingBS both sidesBTWN between CFS cold-formed steelCIP cast-in-placeCJ construction / control jointCJP complete joint penetrationCLR clearCMU concrete masonry unitCOL columnCONC concreteCONN connectionCONST constructionCONT continuous D depthDIA, K diameterDIM dimensionDK deckDTL detailDWGS drawingsDWL dowel (E) existing constructionEA eachEF each faceEJ expansion jointELEV elevationEOx edge of (S=slab, C=conc, etc)EW each wayEXP expansionEXT exterior FDN foundationFLR floorFOx face of (S=slab, C=conc, etc)FS far sideFTG footing GA gageGB grade beamGC general contractorGEN generalGLB glulam HAS headed anchor studHDG hot dip galvanizeHDR headerHK hookHORIZ horizontal IF inside faceINT interior JST joistJT joint KIP, K 1000 poundsKLF 1000 pounds per lineal foot Revise the specialinspection program toinclude the permanentmicropiles. quired ns and s, etc) via awings mensions nts via UNO unless noted otherwise VERT vertical VIF verify in field W width WP work point WWF welded wire fabric IF inside face INT interior JST joist JT joint KIP, K 1000 pounds KLF 1000 pounds per lineal foot Provide a signed special inspection agreement form for the items listed in the special inspection program including the following: -Structural steel welding: Field & Shop -High strength bolting -Permanent micropiles MICROPILE SHORINGSYSTEM BY OTHERS1 1/2"Provide design drawings of the permanent micropiles. Minimum factor of safety should be 2. (2009 IBC 1810.3.3.1.7). SEE REVISED DETAIL ON SHEET A720.00. OPEN RISER TO BE 4" OR LESS FIREPLACE REGISTRATION FORM WAS PROVIDED AT INITIAL PERMIT SUBMISSION. FORM IS INCLUDED IN RE-SUBMISSION PACKAGE AND INSTALLATION INSTRUCTIONS INCLUDED. INSPECTION OF MICROPILES HAS BEEN ADDED TO SPECIAL INSPECTION SCHEDULE THIS FORM HAS BEEN PROVIDED, SIGNED DESIGN OF MICROPILES IS TO BE PROVIDED BY OTHERS COMMENTS IN BLUE FROM CONSULTANTS (KL&A) City of Aspen Received 06/23/17 Building Department Page: 1 File Name: F. MECHANICAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Underground ductwork must comply with 2009 IMC 603.8, including the following: -Ducts must have a protective coating or be completely encased in 2" of concrete. -Ducts must drain at 1/8" per foot minimum slope to a point provided with access. Show and demonstrate all of this on the plans. F. MECHANICAL DRAWINGS.2017.03.08.pdf (7) Page: 2 File Name: F. MECHANICAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Show dryer duct vent routing and terminations. If there are two dryers as shown on the architecturals, you must provide makeup air per 2009 IMC 504.5. Page: 2 File Name: F. MECHANICAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Show ducting and termination locations for exhaust fans. Page: 2 File Name: F. MECHANICAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide access to exhaust fan 5. Page: 3 File Name: F. MECHANICAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Show location of exhaust fan terminations. Underground ductwork must comply with 2009 IMC 603.8, including the following: -Ducts must have a protective coating or be completely encased in 2" of concrete. -Ducts must drain at 1/8" per foot minimum slope to a point provided with access. Show and demonstrate all of this on the plans. Show dryer duct ventrouting and terminations. If there are two dryers asshown on the architecturals, you must provide makeupair per 2009 IMC504.5. Show ducting andtermination locationsfor exhaust fans. Provide access to exhaust fan 5. Show location ofexhaust fanterminations. COMMENTS IN BLUE FROM CONSULTANTS (BURGGRAAF ASSOCIATES) SEE PERMIT RESPONSE LETTER ATTACHED FOR RESPONSES TO ALL MECHANICAL DRAWINGS COMMENTS City of Aspen Received 06/23/17 Building Department Page: 3 File Name: F. MECHANICAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Show the kitchen hood and the exhaust termination. Page: 7 File Name: F. MECHANICAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide the following: -Equipment schedules. -HVAC equipment selection size. -Cut sheets for all HVAC equipment. -Winter/summer indoor/outdoor design temperatures 1.Winter indoor temp may not be above 72 deg F (2009 IECC 302.1) 2.Winter indoor temp may not be below 68 deg F (2009 IRC R303.8) 3.Summer indoor temp may not be below 75 deg F (2009 IECC 302.1) 4.Summer outdoor design temp: 82 deg F (Ordinance 30, 2011) 5.Winter outdoor design temp: -15 deg F (Ordinance 30, 2011) g.Design air leakage rate in CFM. -Heating and cooling loads. Must be based on insulation values matching the REScheck. Show calculations for all cooling and for all heating including space, DHW, snowmelt, etc; should match equipment selection BTUs unless the equipment is capable of modulating. -Dryer duct length and CFM. Makeup air if combined dryer exhaust is over 200 CFM. -Whole house mechanical ventilation system per Ordinance 31, 2011. -Location of all exterior intakes and exhausts with dimensions to intakes, openings, and property lines. Page: [11] E-0.1 Electrical & Lighting Systems General Notes & Legend File Name: G. ELECTRICAL DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: A minimum of 50% of all lamps installed in permanent light fixtures must be high efficacy. Note this requirement on the plans. (2009 IECC 404.1 & 505.1) G. ELECTRICAL DRAWINGS.2017.03.08.pdf (1) Show the kitchen hood and the exhaust termination. Provide the following: -Equipment schedules. -HVAC equipment selection size. -Cut sheets for all HVAC equipment. -Winter/summer indoor/outdoor design temperatures 1.Winter indoor temp may not be above 72 deg F (2009 IECC 302.1) 2.Winter indoor temp may not be below 68 deg F (2009 IRC R303.8) 3.Summer indoor temp may not be below 75 deg F (2009 IECC 302.1) 4.Summer outdoor design temp: 82 deg F (Ordinance 30, 2011) 5.Winter outdoor design temp: -15 deg F (Ordinance 30, 2011) g.Design air leakage rate in CFM. -Heating and cooling loads. Must be based on insulation values matching the REScheck. Show calculations for all cooling and for all heating including space, DHW, snowmelt, etc; should match equipment selection BTUs unless the equipment is capable of modulating. -Dryer duct length and CFM. Makeup air if combined dryer exhaust is over 200 CFM. -Whole house mechanical ventilation system per Ordinance 31, 2011. -Location of all exterior intakes and exhausts with dimensions to intakes, openings, and property lines.308 N FIRST STElectrica Gene E er neering Partners Planmation Pair ons Bonding Backboneommunicationsons Grounding Busbarons Industry Association ons Main Grounding Busbar Noted ed PairCurrentnt ℄ GENERAL INFO CENTER LINE MODELMANUF LAMP Re 4/12/20 A minimum of 50% ofall lamps installed inpermanent lightfixtures must be highefficacy. Note thisrequirement on theplans. (2009 IECC404.1 & 505.1) City of Aspen Received 06/23/17 Building Department Page: 7 File Name: H. LANDSCAPE DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide a 2009 REMP worksheet for the snowmelt and solar. Provide specs on the PV system including panel wattage, orientation, tilt, and inverter wattage. H. LANDSCAPE DRAWINGS.2017.03.08.pdf (2) Page: 7 File Name: H. LANDSCAPE DRAWINGS.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Revise the landscape snowmelt totals and areas to match the mechanicals. Or, delete the snowmelt sheet from the landscapes and only use the mechanicals. Page: 1 File Name: IBC BLDG DESCRIPTION FORM.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: Provide an IRC building description form IBC BLDG DESCRIPTION FORM.2017.03.08.pdf (1) Page: 5 File Name: REScheck-SIGNED.2017.03.08.pdf Subject: PlanCheck Author: nickt Color: The basement walls should be entered as basements in rescheck (choose basement instead of wall). REScheck-SIGNED.2017.03.08.pdf (1) Provide a 2009 REMP worksheet for the snowmelt and solar. Provide specs on the PV system including panel wattage, orientation, tilt, and inverter wattage. Revise the landscape snowmelt totals and areas to match the mechanicals. Or, delete the snowmelt sheet from the landscapes and only use the mechanicals. MAST CHAN CHAN CHAN Description Form - IBC cation: Provide an IRC building description form The basement wallsshould be entered asbasements inrescheck (choosebasement instead ofwall). FORM WAS PROVIDED AT INTIAL PERMIT SUBMISSION. FORM IS INCLUDED IN RE-SUBMISSION PACKAGE City of Aspen Received 06/23/17 Building Department