Loading...
HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (21).ARBKSEE NOTES #1 PLANS The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK FIRE SPRINKLERS REQUIRED MANDATORY TESTING REQUIRED This construction project is required to comply with the 2009 International Energy Conservation Code. Residential projects will require a blower door test performed in the manner complying with section 402.4.2.1 of the 2009 IECC.-Structural steel welding: Field & Shop -High strength bolting SPECIAL INSPECTION REQUIRED Special inspection is required per 2009 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 X 0025.2017.ARBK 11/14/19 1755 0 0 3.2 kW nickt M-3, M-4, M-5 IBC Building Description Form New Gdrive/master files/building/apps, forms checklists 8/28/14 MASTER PERMIT#_______________________________ CHANGE ORDER #_______________________________ CHANGE ORDER #_______________________________ CHANGE ORDER #_______________________________ Building Description Form - IBC Property Location: Address: Unit #: Legal Description: (lot, Block) Owner: Owner Address: Parcel ID #: Building Code Information Code Editions: 2009 IBC 2009 IMC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC Fire Sprinkler System Installed: ______ NO _____ YES NFPA _____ Fire Alarm Installed: ______NO _____YES Type of Construction: _____VA _____VB _____IVA _____IIIA _____IIIB _____IIA _____IIB _____IA _____IB Occupancy Group(s) _____A-1 2 3 4 5 _____B _____E _____F-1 2 _____H-1 2 3 4 5 _____I-1 2 3 4 _____M _____R-1 2 3 4 _____S-1 2 _____U _____Separated Occupancies _____Non-Separated Occupancies Occupant Load(s) Required Special Inspections: ____High Strength Bolting ____Epoxy Anchors ____Structural Steel Welding ____Permanent Micropiles _____Other (specify): ______________________ Energy Code Compliance Path: COMMERCIAL: ____Prescriptive Table ____COMCheck U-factor Alternative ____COMCheck UA Alternative ____Total Building Performance RESIDENTIAL: ____Prescriptive Table ____ResCheck Performace ____ResCheck UA Tradeoff External Energy Use Snowmelt ______sq ft Existing ______sq ft New Spa _____ Pool ____ Building Description # Stories Above Grade Plane_______ # Stories Below Grade Plane ________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ Reviewed by Plans Examiner Date 124 W. Hallam Street BLOCK A; LOT 2; PARCEL 2735-124-21-011 308 ASEPN HOLDING COMPANY, LLC 625 E. MAIN STREET, ASPEN, CO 81611 2735-124-21-011 2 1 EXTERIOR RESTORATION OF AN EXISTING HISTORIC VICTORIAN STRUCTURE. PROJECT TO INCLUDE RELOCATION OF STRUCTURE AND INTERIOR RENOVATION. NEW ADDITION NEW ADDITION TO BE CONSTRUCTED AND LINKED TO THE HISTORIC STRUCTURE. 1,796 X *PER STRUCTURAL/CITY REQ'S X X X X X X X FIRE SPRINKLERS TO BE ADDED X R-2 09/14/2017 2017 13D IRC IRC IRC x 7 bedrooms, 4 full baths, 4 3/4 baths, 1 1/2 bath, 2 car garage, kitchen, living, dining, rec room, laundry, mechanical, storage, roof deck, 5 direct vent gas appliance fireplaces, 1 outdoor firepit 1760 NT 10/9/17 0025.2017.ARBK DAM 10/10/17 1755 11/14/2019 nickt 11/18/2019 11/14/2019 nickt 11/18/2019