HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (21).ARBKSEE NOTES #1 PLANS
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
FIRE
SPRINKLERS
REQUIRED
MANDATORY TESTING
REQUIRED
This construction project is required to
comply with the 2009 International
Energy Conservation Code. Residential
projects will require a blower door test
performed in the manner complying with
section 402.4.2.1 of the 2009 IECC.-Structural steel welding: Field & Shop
-High strength bolting
SPECIAL INSPECTION REQUIRED
Special inspection is required per 2009 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
X
0025.2017.ARBK 11/14/19
1755
0
0
3.2 kW
nickt
M-3, M-4, M-5
IBC Building Description Form New Gdrive/master files/building/apps, forms checklists 8/28/14
MASTER PERMIT#_______________________________
CHANGE ORDER #_______________________________
CHANGE ORDER #_______________________________
CHANGE ORDER #_______________________________
Building Description Form - IBC
Property Location:
Address: Unit #:
Legal Description: (lot, Block)
Owner:
Owner Address:
Parcel ID #:
Building Code Information
Code Editions: 2009 IBC 2009 IMC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC
Fire Sprinkler System Installed: ______ NO _____ YES
NFPA _____ Fire Alarm Installed: ______NO _____YES
Type of Construction: _____VA _____VB _____IVA _____IIIA _____IIIB _____IIA _____IIB _____IA
_____IB
Occupancy Group(s) _____A-1 2 3 4 5 _____B _____E _____F-1 2
_____H-1 2 3 4 5 _____I-1 2 3 4 _____M _____R-1 2 3 4
_____S-1 2 _____U
_____Separated Occupancies _____Non-Separated Occupancies
Occupant Load(s)
Required Special Inspections: ____High Strength Bolting ____Epoxy Anchors ____Structural Steel Welding
____Permanent Micropiles _____Other (specify): ______________________
Energy Code Compliance Path: COMMERCIAL:
____Prescriptive Table ____COMCheck U-factor Alternative
____COMCheck UA Alternative ____Total Building Performance
RESIDENTIAL:
____Prescriptive Table ____ResCheck Performace ____ResCheck UA Tradeoff
External Energy Use Snowmelt ______sq ft Existing ______sq ft New Spa _____ Pool ____
Building Description
# Stories Above Grade Plane_______ # Stories Below Grade Plane ________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
Reviewed by
Plans Examiner Date
124 W. Hallam Street
BLOCK A; LOT 2; PARCEL 2735-124-21-011
308 ASEPN HOLDING COMPANY, LLC
625 E. MAIN STREET, ASPEN, CO 81611
2735-124-21-011
2 1
EXTERIOR RESTORATION OF AN EXISTING HISTORIC VICTORIAN STRUCTURE. PROJECT
TO INCLUDE RELOCATION OF STRUCTURE AND INTERIOR RENOVATION. NEW ADDITION
NEW ADDITION TO BE CONSTRUCTED AND LINKED TO THE HISTORIC STRUCTURE.
1,796
X
*PER STRUCTURAL/CITY REQ'S
X
X
X
X
X
X X
FIRE SPRINKLERS TO BE ADDED
X
R-2
09/14/2017
2017
13D
IRC
IRC
IRC
x
7 bedrooms, 4 full baths, 4 3/4 baths, 1 1/2 bath, 2 car garage, kitchen, living, dining, rec room,
laundry, mechanical, storage, roof deck, 5 direct vent gas appliance fireplaces, 1 outdoor firepit
1760
NT 10/9/17
0025.2017.ARBK
DAM 10/10/17
1755
11/14/2019
nickt
11/18/2019
11/14/2019
nickt
11/18/2019