Loading...
HomeMy WebLinkAboutFile Documents.131 W Bleeker St.0007.2017 (6).ARBU The permit processing time is stopped on this review and will not begin again until all of the issues are addressed and the corrections are submitted. The review will queue with other permits being processed beginning at the date of resubmission. Date: 3/3/17 To: Ryan Doremus Email: ryan@thunderbowlarchitects.com Phone: 970-274-1421 From: Justin Hahn, Plans Examiner, City of Aspen Phone 970/429-2784, Fax 970/920-5440, Justin.Hahn@cityofaspen.com Permit Coordinator: Ben Chase 970-429-2763 ben.chase@cityofaspen.com Project Name: Address:118 N First St Permit Number: 0007.2017.ARBU Owner’s Name: 118 N First LLC Code Edition: 2009 IRC Occupancy Group: IRC Type of Construction: VB Number of Stories: 2 These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen. State and Federal regulations are administered where applicable. All referenced code sections are from the 2009 IRC unless noted otherwise. You can find a copy of all adopted codes, ordinances, and policies on our website. The date on this letter may be earlier than the time you receive it. This is because comment letters from review agencies are held until all agencies have finished their letters or signed off. The attached corrections are required to be addressed. Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list. Indicate which detail or specification page shows the required information. Provide both a physical copy and a digital Word doc. Plan corrections cannot be made on the blueprints (e.g., red-lined). All changes must be made to the originals prior to making prints. Responses such as “will comply with code” are not adequate. Revised drawings must clearly show code compliance. If you have any questions specifically regarding the comments below, please feel free to contact me directly. If you have questions regarding the status of your permit in the queue or general permitting questions, please contact your Permit Coordinator. When all items from all agencies have been addressed regarding the comments below, call 970-920-5090 to schedule a required appointment for re-submittal with The permit processing time is stopped on this review and will not begin again until all of the issues are addressed and the corrections are submitted. The review will queue with other permits being processed beginning at the date of resubmission. your Permit Coordinator. You will be required to bring a copy of this letter with ALL responses and required documentation. If all items listed have not been addressed, the resubmittal will be deemed incomplete, and will not be accepted. Building plan check is only one part of the often complex process by which projects are reviewed for approval. These parts are interrelated and are sometimes conflicting. It is ultimately the applicant’s responsibility to coordinate these requirements. Please provide the following information to enable completion of this plan review: 1. Asbestos testing is required to be submitted before plan check can sign off. 2. Structural plans have multiple call outs containing question marks, are these questions? Was this the finalized structural plan? Please call to discuss. 3. This appears to be a duplex on my GIS mapping, is this the case? If so, please identify all demising walls and either note that the demising wall will not be disturbed on your plans or provide a compliant wall assembly.