Loading...
HomeMy WebLinkAboutFile Documents.131 W Bleeker St.0007.2017 (11).ARBU2. Approrval of fabricator. Approval shall be based upon rerview of the fabricator's written procedural and quality control manuals and periodic auditing offabrication practices by an apprcr'r'ai special inspection agency. 3. Completion of fabrication. Upon completion of fabrication, tlhe approved fabricator shall sutrmit certificate of compliance to the building official stating that the work was perforrned in accordance with the approved construction documents. G. Building Department Responsibilities 1. Approrv,e special-inspection program. The building department shall approve all special inspectors and special-inspection requirements. 2, Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. Llis\Her approval, in addition to that of the special inspector, must be obtained prior to placement of concrete, coverinp; of structural steel, or other similar materials. 3. Review inspection reports. The building official should revie.w special-inspection progress and final repofts. 4. Perforrn final inspection. The building official should perform the final inspection and approval for a project IIBC Sec. 109.3.1] after the final special-inspection report has been reviewed and approved. Printed Name:Date: tf Project Addressr +<9 V permit Number: ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency:Signature: Owner: Sisnature:Printed Name Date Ensineer/ Architeot:Signature:Printed Name:Date: Contractor:Signature: afL Approved Fabricator:Signature:Printed Name: 4ry,u UeZup lnsnected Fabricator:Signature:Printed Name:Date: (circle one) CITY OF ASPEN PITKIN COUNTY: Signature:Printed Name:Date: Silver Town Structures Hein L Brutsaert 6/13/17 City of Aspen Received 6/12/17 Building Department