HomeMy WebLinkAboutFile Documents.38 Trainors Landing.0016.2019 (2).ARBK
January 18, 2019
Nikolai Valdmanis
Confluent Homes
(970) 401-1385
nikolai.valdmanis@gmail.com
RE: Proposed Bath Remodel
38 Trainors Landing
Aspen, Colorado
Nikolai,
As requested, we have reviewed the potential structural impact of the proposed interior bath remodel at the
location noted above. Our review is based upon proposed floor plans provided by Kevin C. Heath, dated January
14, 2019, and our site observation visit made on January 18, 2019.
The current proposed scope of work includes interior modifications to the master and family bathrooms. No
framed walls or structure are altered in the master bath. At the family room bath remodel, the south wall is
moving out approximately three feet to allow for a shower addition. We were able to verify on site that pre-
engineered 2x roof trusses span parallel above this wall, indicating that the wall is non-bearing. Therefore, we
find the change acceptable without further modification to the structure.
Should you have any further questions or findings regarding this matter, please feel free to contact our office.
Sincerely,
Evolve Structural Design LLC
Sara Mickus, P.E.
01/23/2019
02/05/2019
justinh