1.1 Our general purpose is to complete an interior remodel at the Searcy
residence, 1449 Crystal Lake Rd. Aspen, CO 81611.
2.0 Location
2.2 We completed Phase 1 of the remodel in July 2018 on the areas that did
not require a permit. In Phase 2 we will complete the interior remodel which
includes the demolition of an existing bathroom and the adding of a new
one.
3.0 Project Documentation
3.4 Contacts
Owner: Conner Searcy, 214.686.0440
Contractor: Trevor Everett, 970.274.6465
Site Supervisor: David Dieter, 970.456.2524
4.0 Project Implementation
4.1 Dates of Construction, August 21, 2018 – December 21, 2018
4.2 Hours of construction shall be 8am to 5pm
4.3 August 2018, demolition begins. September 2018, the rebuild begins.
5.0 Site and Right of Way
5.3 The parking spaces; there are 5 spots at the bottom of the driveway,
with an adjacent lot that can hold 15 to 20 trucks.
5.4 The staging areas shall be; in front of garage, in garage and lower patio.
5.6 The site supervisor’s office will be in the main house garage, along with
job materials and tool storage containers. A portable restroom will be
located at the bottom of the main house driveway. A large dumpster will be
placed in the driveway in front of the garage with a recycle receptacle next
to it.
08/01/2018
Construction Management Plan
6.0 Traffic Control
6.4 Deliveries will be at the top of the driveway entrance and at the garage.
7.0 Pedestrian Protection
N/A
8.0 Sediment and Erosion Control
N/A
9.0 Fugitive Dust Control
N/A
10.0 Emissions
N/A
11.0 Noise Suppression
N/A
12.0 Enforcement
The Site Superintendent David Dieter will be enforcing all city rules and
regulations.