HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0009.2017 (11).ARBKStaff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 1 of 11
MEMORANDUM
TO: Planning and Zoning Commission
FROM: Hillary Seminick, Planner
THRU: Jessica Garrow, Community Development Director
MEETING DATE: February 7, 2017
RE: 1419 Crystal Lake Dr. – Special Review and Stream Margin
Review, Resolution No.__, Series 2017
APPLICANT /OWNER:
Big Dog Family, LLC
911 Ponte Vedra Blvd.
Ponte Vedra, FL
904.472.8707
REPRESENTATIVE:
Mitch Haas, Haas Land Planning
420 E. Main St., Suite 10-B
Aspen, CO 81611
LOCATION:
1419 Crystal Lake Road, Parcel ID
No. 2737-181-32-017
CURRENT ZONING & USE
This property is located in the
Moderate-Density Residential (R-15)
zone district in the Callahan
Subdivision and Planned
Development. The property is
developed with an existing single
family home.
PROPOSED LAND USE:
The Applicant is proposing to remodel
the interior and exterior of the existing
single family home.
STAFF RECOMMENDATION:
Staff recommends that the Planning
and Zoning Commission approve the
Figure B: Subject property
Figure A: Project location
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 2 of 11
LAND USE REQUEST AND REVIEW PROCEDURES:
The Applicant is requesting the following land use approvals from the Planning and Zoning
Commission:
Special Review (Pursuant to Lane Use Code Section 26.435.040.E) for a new Top of
Slope determination.
Stream Margin Review (Section 26.435.040) for improvements within the Stream Margin
Review Area
Pursuant to 26.435.040.E, Special Review, an application seeking an appeal of the Stream
Margin Map’s Top of Slope designation shall be processed as a Special Review. The criteria for
Special Review states the Applicant will demonstrate how the proposed development meets the
request outlined in Resolution No. __,
Series 2017.
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 3 of 11
Stream Margin Review standards. Stream Margin Review applies to areas located within one
hundred (100) feet, measured horizontally, from the high water line of the Roaring Fork River
and its tributary streams or within the one-hundred-year floodplain where it extends one hundred
(100) feet from the high water line of the Roaring Fork River and its tributary streams or within a
Flood Hazard Area. Development in these areas shall be subject to heightened review so as to
reduce and prevent property loss by flood while ensuring the natural and unimpeded flow of
watercourses. Review shall encourage development and land uses that preserve and protect
existing watercourses as important natural features.
The Planning and Zoning Commission will determine if the proposal meets the criteria for a
Special Review and Stream Margin Review. The Commission is the final review authority.
SUMMARY OF PROJECT:
EXISTING CONDITIONS:
Located on the east side of town outside the Aspen Infill Area, the subject property, 1419 Crystal
Lake Road is zoned Moderate-Density Residential (R-15) and is Lot 14-E of the Callahan
Subdivision and Planned Development. A 6,374 sq. ft. single family home was constructed on
the property in 1990, shown in Figures C and D. The lot is just over one acre at 45,188 sq. ft. and
is located on the banks of the Roaring Fork River. A portion of the property is located within the
applicable Stream Margin Review Area, indicated in Figure E.
Figure C. Front of existing residence Figure D. Rear (riverside) of existing residence
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 4 of 11
Figure E. Existing conditions site map
The existing property has the following non-conformities with regards to Stream Margin
Review: The following figures refer to the proposed Top of Slope designation, further described
in the Proposal section of this memo.
A portion of the existing home projects into the 45° progressive height limit, as measured
from the proposed Top of Slope designation, shown in Figures F and G; and,
A putting green and stair case, as shown in Figures F and H; and,
Non-native vegetation below the proposed Top of Slope and within 15’ of the proposed
Top of Slope, shown in Figure F.
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 5 of 11
Figure F. Existing riverside conditions with approximate location of the proposed Top of
Slope Designation
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 6 of 11
PROPOSAL:
The Applicant proposes the following improvements to the existing single family residence:
Relocation of existing deck area; and,
Replace and change location of existing fenestration; and,
Replace existing exterior materials; and,
Remove putting green and stairs located within 15’ of the Top of Slope; and,
Revegetate areas within 15’ of the Top of Slope with native vegetation; and,
Add new stormwater improvements; and,
Add new patio area and spa.
Figure I. Proposed riverside rendering
Figure G. Existing second story projecting
into the 45° Progressive Height Limit Figure H. Nonconforming staircase location
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 7 of 11
Figure J. Existing riverside elevation
Figure K. Proposed riverside elevation
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 8 of 11
Figure L. Site plan with proposed exterior improvements
Additionally, the Applicant proposes a new Top of Slope determination, as shown in Figure M. below.
Figure M. Site Map with proposed Top of Slope determination and improvements
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 9 of 11
STAFF COMMENT:
There are eleven (11) review criteria associated with Stream Margin Review, and two (2)
associated with Section 26.435.040.E. Staff findings for the aforementioned review criteria are
summarized below and full responses are in Exhibit A. Additionally, the application was referred
to both the Engineering and Parks Departments for review and comment that can be found in
Exhibit B. All conditions required by the referral departments have been incorporated in the
approval resolution.
The nature of the changes proposed by the remodel raises four primary questions regarding the
Stream Margin Review and Special Review criteria:
1) Does the City of Aspen’s Engineering Department support the proposed Top of Slope
determination?
The proposed Top of Slope determination was confirmed onsite by the Engineering
Department in the fall of 2016. The Top of Slope provides the basis of the Stream Margin
Review; therefore, Staff reviewed the proposed development based on the new Top of Slope
determination.
2) Do any of the proposed additions to the rear of the property extend into the Top of Slope
setback?
The putting green and staircase located below the Top of Slope setback are proposed for
removal. The new patio, relocation of deck area, and changes to the rear façade of the
building are all located beyond 15’ of the Top of Slope as shown in Figures L and M,
above.
3) Do any of the proposed changes infringe on the 45° progressive height plane from the Top
of Slope?
As noted in the Existing Conditions section of this memo, the existing home projects into
the 45° Progressive Height Limit. Criteria 9 does not allow for development outside the 15’
setback from the top of slope to exceed a height delineated from a line drawn at 45°, also
known as the Progressive Height Limit. The home currently projects into this plane shown
in Figure M. The projection into the plane will not increase as a result of the proposed
improvements as shown in Figures N and O. Figures P and Q provide a footprint of the
proposed and existing eves, and demonstrate the improvements will not increase this non-
conforming aspect of the home.
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 10 of 11
Figure P. Existing roof eve projecting into 45° Progressive Height Limit
Figure Q. Proposed roof eve projecting into 45° Progressive Height Limit
Figure N. Existing second story projecting
into the 45° Progressive Height Limit
Figure O. Proposed second story projecting
into the 45° Progressive Height Limit
Received
2/22/17
Staff Memo
1419 Crystal Lake Road
Stream Margin and Special Review
Page 11 of 11
4) How will the proposed changes to the rear of the property affect riparian vegetation and
features?
In addition to removing the putting green and staircase that are below the Top of Slope, the
Applicant proposes to further improve areas below the 15’ Top of Slope setback and Top of
Slope by revegetating with native plant species as approved by the Parks Department. The
Parks and Engineering Departments have concerns with the potential impacts of excavation
and reconstruction in the proximity to the root structures of trees. The referral comments
from both departments indicate that careful treatment during excavation and final design can
mitigate these potential impacts. These conditions have been included in the approval
resolution.
SUMMARY:
The Top of Slope determination is supported by the Engineering Department, and both Parks and
Engineering support the removal of the putting green, the stair case, and the revegetation of the
“no development” area. The proposed project meets all of the standards in 26.435.040.C., Stream
Margin Review and 26.435.040.E, Special Review.
RECOMMENDATION: Community Development Department staff recommends that the
Planning and Zoning Commission approve the request for Stream Margin Review and Special
Review, with conditions.
RECOMMENDED MOTION: If the Planning and Zoning Commission chooses to recommend
approval for the request, they may use this motion “I move to make a recommendation to approve
the requests for Stream Margin Review and Special Review at 1419 Crystal Lake Road.”
ATTACHMENTS:
Exhibit A – Stream Margin – Review Criteria
Exhibit B – Referral Agency Comments
Exhibit D – Application
Exhibit E – Public Notice
Received
2/22/17