Loading...
HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0009.2017 (17).ARBK aec Architectural Engineering Consultants, Inc. Mechanical, Electrical, & Lighting Design Services An Office with LEEDTTMM Accredited Professionals 40801 US Hwy 6 & 24,Suite 214,Eagle-Vail, CO 81620 Post Office Box 8489,Avon, CO 81620 phone: 970-748-8520 email: stan@aec-vail.com:www.aec-vail.com December 9, 2016 Matthew Smith Thunderbowl Architects 300 Spring St. Suite 20 Aspen, CO 81611 Re: 1419 Crystal Lake Rd. Dear Matthew, This document is intended to show compliance of the remodeled residence located at 1419 Crystal Lake Rd. in Aspen, CO with the 2009 International Energy Conservation Code (2009 IECC). We propose to use a prescriptive approach per sections 402.1-402.3 and 403.2.1 of the 2009 IECC. Project The project is a remodel with a total floor area of 8,500 sf. For RREMP fees, and heat load calculations, please refer to the following pages of this document. The heat load calculations are performed using the Carrier Hourly Analysis Program and provides a more detailed and accurate load than Manual J. A dewpoint calculation is not included in these permit documents, as the roof assembly meets the requirements of section R806.5 of the 2015 IRC. Building Envelope The following table lists the mandatory minimum insulation and fenestration requirements for the project in climate zone (7). Any assemblies not being altered during the remodel will remain as is, and all new assemblies will meet the following requirements. Fenestration U-factor Skylight U-factor Ceiling R-value Wood frame wall R-value Floor R-value Basement wall R-value Slab R-value Crawl Wall R-value Code Minimums 0.35 (1) 0.60 49 21 38 (2) 15/19 (3) 10 (4) 10/13 (5) Notes: 1) Fenestration SHGC requirements do not apply in climate zone (7) 2) Or insulation sufficient to fill the framing cavity, R-19 minimum 3) R-15 continuous insulation on the interior or exterior or R-19 cavity insulation on the interior of the basement wall. Can be satisfied with R-13 cavity plus R-5 continuous. 4) 4 ft deep and R-15 edge insulation for heated slabs 5) R-10 continuous insulation or R-13 cavity insulation. Sincerely, Bryan Webster Received 2/22/17 Zone Sizing Summary for hlhg Project Name: 16077 - 1419 Crystal Lake 12/09/2016 Prepared by: AEC 02:39PM Air System Information Air System Name hlhg Equipment Class UNDEF Air System Type SZCAV Number of zones 1 Floor Area 8225.0 ft² Location Aspen, Colorado Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM Individual peak space loads Calculation Months Jan to Dec Sizing Data Calculated Zone Sizing Data Maximum Design Minimum Time Maximum Zone Cooling Air Air of Heating Floor Sensible Flow Flow Peak Load Area Zone Zone Name (MBH)(CFM)(CFM)Load (MBH)(ft²)CFM/ft² Zone 1 154.1 10901 10901 Aug 1500 150.9 8225.0 1.33 Zone Terminal Sizing Data No Zone Terminal Sizing Data required for this system. Space Loads and Airflows Cooling Time Air Heating Floor Zone Name /Sensible of Flow Load Area Space Space Name Mult.(MBH)Load (CFM)(MBH)(ft²)CFM/ft² Zone 1 001 Laundry 1 0.8 Jul 1500 50 0.8 100.0 0.50 005 Media Room 1 11.0 Jul 1500 687 4.6 640.0 1.07 006 Bathroom 1 1 1.3 Jul 1600 83 0.7 105.0 0.79 007 Bedroom 1 1 5.1 Sep 1400 316 4.4 290.0 1.09 008 Flex Room 1 9.4 Oct 1400 584 4.9 365.0 1.60 009 Bedroom 2 1 3.8 Oct 1400 235 3.6 220.0 1.07 011 Bathroom 2 1 1.6 Jul 1500 97 1.1 130.0 0.75 015 Bathroom 3 1 0.8 Jul 1500 52 0.7 70.0 0.74 016 Game Room 1 12.3 Jul 1500 769 4.9 800.0 0.96 101 Entry 1 7.8 Jul 1700 486 8.5 395.0 1.23 102 Powder 1 1.4 Jul 1700 85 1.4 75.0 1.13 104 Living Room 1 15.2 Jul 1500 945 18.9 500.0 1.89 105 Dining Room 1 8.7 Nov 1400 544 8.2 380.0 1.43 107 Family Room 1 15.7 Aug 1600 976 14.3 395.0 2.47 108 Kitchen 1 14.9 Jul 1700 930 4.5 425.0 2.19 110 Mud Room 1 1.8 Jul 1100 110 1.7 200.0 0.55 112 Garage 1 3.6 Aug 1600 874 17.5 765.0 1.14 113 Diesels Room 1 0.7 Jul 1500 101 2.0 55.0 1.84 201 Her Closet 1 3.5 Jul 1500 286 5.7 190.0 1.51 202 His Closet 1 1.8 Jul 1500 132 2.6 130.0 1.01 204 Master Bath 1 8.8 Oct 1400 550 6.9 370.0 1.49 206 Master Bedroom 1 7.9 Sep 1400 492 8.6 455.0 1.08 207 Bedroom 3 1 7.0 Aug 1600 438 8.4 300.0 1.46 208 Bathroom 3 1 0.9 Jul 1700 58 0.5 60.0 0.96 209 Office 1 3.3 Jul 1700 207 1.6 135.0 1.53 211 Stairs 1 4.9 Jul 1700 308 4.4 225.0 1.37 212 Bathroom 4 1 2.1 Aug 1700 132 1.6 115.0 1.15 213 Bedroom 4 1 5.7 Jul 1600 376 7.6 335.0 1.12 Hourly Analysis Program v4.50 Page 1 of 1Received 2/22/17 Provide a cutsheet on the boiler that corresponds with this and the efficiency noted on the REMP worksheet.