Loading...
HomeMy WebLinkAboutFile Documents.128 Maple Ln.0191.2018 (2).ARBK John, Thank you for your follow-up, here is BMA’s answers to your questions: 1. We are in the process of getting the Special Inspection form signed by all parties 2. Existing roof assembly is non-vented, we plan to keep it a non-vented roof a. Exterior to Interior – Non vented roof assembly i. Fire rated shake roof ii. Cedar Breather drainage mat iii. Roofing Felt Underlayment – 72lb cap sheet iv. Ice & Water shield – CCW WIP 300HT v. 5/8" CDX Plywood vi. Existing skip sheathing to remain vii. Existing 2x6 framing to remain viii. New Framing members to be in line with existing 2x6 framing (top of existing 2x6 = top of new framing) ix. New Steel or wood framing supports (see structural drawings) under existing framing w/ shimming as needed x. Insulation between existing & new framing members: Spray foam or batt insulation to meet City of Aspen Energy Code xi. 1/2" plywood sheeting to plain our inside framing (as needed) xii. Vapor retarder (if needed, used with batt insulation) xiii. 5/8” drywall 3. Here is our logistic plan for the roof: a. Existing 2x6 framing will “gently & slowly” be pushed back into place, as much as possible b. Once framing is as flush as possible new structural members will be installed under the existing framing to support the roof in the new location i. Please note we will be losing interior ceiling height space by 2-3” c. Shimming will be needed between the bottom of the existing framing and the new structural members d. New framing will be placed between existing framing or sistered on to the sides of existing framing for support e. New roof sheathing will be placed over the existing skip sheathing for support and to flush out the exterior of the roof for a flush plywood deck Please let me know if you have any further questions, we will submit the Special Inspection form ASAP. Sincerely, Jamie Jamie L. Brewster McLeod, AIA President LEED Accredited Professional Brewster McLeod Architects, Inc. 112 South Mill St. #B-Top Floor P.O. Box 697, Aspen, CO 81611 T 970/544.0130, F 970/544.9201 www.brewstermcleod.com 07/12/2018 From: John Barker <john.barker@cityofaspen.com> Sent: Monday, July 2, 2018 4:23:31 PM To: Teraissa McGovern; Jamie Brewster McLeod Cc: Denis Murray Subject: 128 E Main Repair Jamie, Good afternoon. Please address the following in advance of permit submittal: • Signed Special Inspection form • Roof Assembly Showing Ventilation and/or Insulation • Will you be replacing the roof sheathing as well? If not, how do you plan to address the bent nature of the sheathing combined with the square beams? Thanks, John John Barker Permit Coordinator Commnunity Development 07/12/2018