HomeMy WebLinkAboutChange Order.128 Maple Ln.0191.2018.ARBK
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
Commerical
DƵůƟͲ&ĂŵŝůLJ
^ŝŶŐůĞ&ĂŵŝůLJ
Use of Building Class of Work
New
ĚĚŝƟŽŶ
ůƚĞƌĂƟŽŶRepair
________
Yes
No
Will there be
ĂŶLJƌŽŽĨͬǁĂůů
ƉĞŶĞƚƌĂƟŽŶƐ͍
NOTICE: This permit becomes null and
ǀŽŝĚŝĨǁŽƌŬŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚ
ŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶϭϴϬĚĂLJƐ͕Žƌ
ŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌ
ĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚ
ĂŶLJƟŵĞĂŌĞƌǁŽƌŬŝƐĐŽŵŵĞŶĐĞĚ͘
__________________
_________________
__________________
____________________
________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
DŝdžĞĚͲhƐĞ
IFFR
Tenant FinishĞŵŽůŝƟŽŶ
Change Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
ŶĞƌŐLJŽĚĞREMP WĞĚ͘ŵĞŶŝƚLJ
CMP (50%)Plan Check
;,ŽƵƌůLJͿ Housing Cash in Lieu
Parks Review Zoning
;,ŽƵƌůLJͿ Stormwater
hƟůŝƚLJZĞǀŝĞǁ Engineering
;,ŽƵƌůLJͿ ŝƚLJhƐĞdĂdž
GIS ŽƵŶƚLJhƐĞdĂdž
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
ͺͺͺͺͺͺͺͺͺĞŶƐƵƐŽĚĞͺͺͺͺͺͺͺͺͺηŽĨǁĞůůŝŶŐƐ ͺͺͺͺͺͺͺͺͺWůĂŶƐ>ŽĐĂƟŽŶ
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
ͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
ͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts
____&ŽƌĐĞĚŝƌͬ'ƌĂǀŝƚLJ^LJƐƚĞŵƐ
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
ďƐŽƌƉƟŽŶhŶŝƚ
____Boilers (includes vent)
____Air Handling Unit
ͺͺͺͺŽŽůŝŶŐ^LJƐƚĞŵƐ
ͺͺͺͺsĞŶƟůĂƟŽŶ&ĂŶƐ
____Range Hood
ͺͺͺͺηŽĨ'ĂƐ^LJƐƚĞŵKƵƚůĞƚƐ
____^ŶŽǁŵĞůƚ^LJƐƚĞŵ^Ƌ&ƚͺͺͺͺͺͺͺͺͺ
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
^ĂŶŝƚĂƟŽŶ
Env. Health
Parks
Landscape
ĸĐŝĞŶĐLJ
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-
viewer
Sign-
Kī
NEW SQ FT
WƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘
^Ƌ&ƚŽĨtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘
hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐ^ƋƵĂƌĞ&ŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘
>Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘
ŝƐƚƵƌďĞĚdžƚĞƌŝŽƌƌĞĂ͗^ƋƵĂƌĞĨŽŽƚĂŐĞŽĨůŽƚĂīĞĐƚĞĚďLJƉĞƌŵŝƚĂƉƉůŝĐĂƟŽŶ͘
EĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐďůĞƐƉĂĐĞ͘
^Ƌ&ƚŽĨZŽŽŵƐǁŝƚŚhƟůŝƚLJtŽƌŬ͗Total square footage, not FAR, of all rooms with plumbing work.
KzKh>/<K'^͍
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReviewDEFINITIONS6/28/2018 0325.2017.ARBK
128 E Main Street 2735-124-38-005
P&S 66 City and Townsite of Aspen
BTR Sardy LLC sardyhouse@gmail.com
Jamie McLeod 970-544-0130 jamie@brewstermcleod.com
Structural repair of historic roof and front porch. Historic roof will remain intact keeping existing framing and skip sheathing, in-fill framing and tube still will be added to support the roof.
New interior columns to the foundation will be added. No exterior changes to the roof. One column at the historic porch will be replaced due to significant rot damage. A new header will be installed as well.
$300,000.00
900 SF
x
MU
07/12/2018
0191.2018.ARBK
25
x jb 7/11
x as 7/11
x
x
x
ms
AS 7/13/18
DAM 7/13/18
DAM 7/13/18
DAM 7/13/18