Loading...
HomeMy WebLinkAboutChange Order.128 Maple Ln.0191.2018.ARBK COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ Commerical DƵůƟͲ&ĂŵŝůLJ ^ŝŶŐůĞ&ĂŵŝůLJ Use of Building Class of Work New ĚĚŝƟŽŶ ůƚĞƌĂƟŽŶRepair ________ Yes No Will there be ĂŶLJƌŽŽĨͬǁĂůů ƉĞŶĞƚƌĂƟŽŶƐ͍ NOTICE: This permit becomes null and ǀŽŝĚŝĨǁŽƌŬŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚ ŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶϭϴϬĚĂLJƐ͕Žƌ ŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌ ĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚ ĂŶLJƟŵĞĂŌĞƌǁŽƌŬŝƐĐŽŵŵĞŶĐĞĚ͘ __________________ _________________ __________________ ____________________ ________________ _________________ __________ ______________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT DISTURBEDEXTERIOR AREA SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS DŝdžĞĚͲhƐĞ IFFR Tenant FinishĞŵŽůŝƟŽŶ Change Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Engineering Zoning (50%)School Ded. Zoning (50%)CMP (50%)TDM Impact ŶĞƌŐLJŽĚĞREMP WĞĚ͘ŵĞŶŝƚLJ CMP (50%)Plan Check ;,ŽƵƌůLJͿ Housing Cash in Lieu Parks Review Zoning ;,ŽƵƌůLJͿ Stormwater hƟůŝƚLJZĞǀŝĞǁ Engineering ;,ŽƵƌůLJͿ ŝƚLJhƐĞdĂdž GIS ŽƵŶƚLJhƐĞdĂdž SUBMITTAL FEES ISSUANCE FEES _________Lot Area _________Deed Restricted ͺͺͺͺͺͺͺͺͺĞŶƐƵƐŽĚĞͺͺͺͺͺͺͺͺͺηŽĨǁĞůůŝŶŐƐ ͺͺͺͺͺͺͺͺͺWůĂŶƐ>ŽĐĂƟŽŶ APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ ____Shower ____Kitchen Sink (+Disposal) ____Dishwasher ͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ ____Clothes Washer ____Floor Sink ____Floor Drain ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts ____&ŽƌĐĞĚŝƌͬ'ƌĂǀŝƚLJ^LJƐƚĞŵƐ ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew ____Appliance Vents ____Heat, Refrig, Cooling, or ďƐŽƌƉƟŽŶhŶŝƚ ____Boilers (includes vent) ____Air Handling Unit ͺͺͺͺŽŽůŝŶŐ^LJƐƚĞŵƐ ͺͺͺͺsĞŶƟůĂƟŽŶ&ĂŶƐ ____Range Hood ͺͺͺͺηŽĨ'ĂƐ^LJƐƚĞŵKƵƚůĞƚƐ ____^ŶŽǁŵĞůƚ^LJƐƚĞŵ^Ƌ&ƚͺͺͺͺͺͺͺͺͺ Equipment Checklist PC Zoning HPC Building Fire Engineering CMP Water Stormwater ^ĂŶŝƚĂƟŽŶ Env. Health Parks Landscape ĸĐŝĞŶĐLJ Approved To Issue Issuance Date ApprovedReviewingDepartment Re- viewer Sign- Kī NEW SQ FT WƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘ ^Ƌ&ƚŽĨtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘ hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐ^ƋƵĂƌĞ&ŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘ >Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘ ŝƐƚƵƌďĞĚdžƚĞƌŝŽƌƌĞĂ͗^ƋƵĂƌĞĨŽŽƚĂŐĞŽĨůŽƚĂīĞĐƚĞĚďLJƉĞƌŵŝƚĂƉƉůŝĐĂƟŽŶ͘ EĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐďůĞƐƉĂĐĞ͘ ^Ƌ&ƚŽĨZŽŽŵƐǁŝƚŚhƟůŝƚLJtŽƌŬ͗Total square footage, not FAR, of all rooms with plumbing work. KzKh>/<K'^͍ December 2017 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ ZONE DISTRICT NeedsReviewDEFINITIONS6/28/2018 0325.2017.ARBK 128 E Main Street 2735-124-38-005 P&S 66 City and Townsite of Aspen BTR Sardy LLC sardyhouse@gmail.com Jamie McLeod 970-544-0130 jamie@brewstermcleod.com Structural repair of historic roof and front porch. Historic roof will remain intact keeping existing framing and skip sheathing, in-fill framing and tube still will be added to support the roof. New interior columns to the foundation will be added. No exterior changes to the roof. One column at the historic porch will be replaced due to significant rot damage. A new header will be installed as well. $300,000.00 900 SF x MU 07/12/2018 0191.2018.ARBK 25 x jb 7/11 x as 7/11 x x x ms AS 7/13/18 DAM 7/13/18 DAM 7/13/18 DAM 7/13/18