HomeMy WebLinkAboutFile Documents.1350 Mountain View Dr.0300.2017 (6).ARBKZONING REVIEW CHECK LIST
Date:
Address:
Parcel ID# :
Scone of work:
Permit #
Legal:
Zone District: K 7,y_
0 -New Construction ❑ Remodel/ Addition J�7.`Demolition/ Relocation JDlSingle Family
❑ Duplex ❑ Accessory Structure ❑ Commercial ❑ Lodging ❑ Mixed -Use
❑ Multi — Family Number of Units ❑ Employee Housing Number of Units
Approvals Attached? V11- QkL Variances?
Approvals
Resolution
Ordinance
Reception number, book and page, etc.
Aspen City Council
30%+
i
HPC
Property Lines
P&Z/
Administrative
Fences
Variances
Other
Approval Drawings Attached?
Notes:
SURVEY:
SURVEY HAS: i'
/F
HOA Form? Zoning Compliance Form
Steep Slopes
20-30%
"✓
30%+
i
Easements
Property Lines
f
Fences
Topographic lines
Page 2 of 7
Lot Size Reductions:
20-30%
TOTAL REDUCTIONS
X 50%
_
30%
X 100%
_
Easementr
l
X 100%
_
# of spaces
TOTAL
=
G(}ROSS LOT SIZE
TOTAL REDUCTIONS
NET LOT AREA
Combined Side
SITE:
Setbacks? V
Zoning Rules:
Building Envelope? ',/
Setbacks from approvals?
Front
S
Side
Combined Side
Rear
rii M �
Garage
Fences
Distance Between Buildings
U
Minimum size
Site plan?
SITE PLAN HAS:
Property Lines
Setbacks
Building Envelope
Fences
Parking
# of spaces
AC units
Patios
Window Wells in the setbacks? I I Size Site walls
Site Covera e Re aired? % Re aired %Pro osed
Micro ile or Ground nails? Shown as within roe lines?
Notes:
Page 3 of 7
J
FLOOR AREA:
Net Lot Area 16, �P-o
Garage 250 = < 250 then /2 = Add toA
> 250 then 125 = Add to
Allowed FA
Existing FA
Proposed FA
New Additional FA
597,
trs7
Proposed FA:
Allowed Deck
Proposed Deck
Deck being added to FA
4,9 9. S -
7 0 /
x, (ts
DUPLEX:
Unit A:
Pro osed FA:
Credit:
Unit B:
Proposed FA:
Credit:
Notes:
SD(),o
HEIGHT Arch 100
Hei ht over Tooa h sheet? Sheet 4
Maximum allowable Height Per Zonir
Proposed Height: I I Roof Pitch
Elevations:
Max Heig
Notes:
t�
5 V
Line Shown?
(0f 5 Y
10�
= Site I e 30. 3
I Per
Measure to:
Natural Grade shown and labeled?
Finished Grade shown and labeled?
Page 4 of 7
LIGHTING
Exterior Li ht Plan? Pictures of Li hts
Notes:
RDS
Signed Checklist?
Notes:
Impact Fees: /
Fees Waived? N Per School land TDM Parks
;4,`P 7 3�i9�i �_
Existing SF ,21 4 3 /1,000 x .16 = > FTE's (First 4,500SF)
.32 = FTE's (Greater than 4,500SF)
Total Existing FTE's
Proposed SF y SoU /1,000 x 16— --7:2 FTE's (First 4,500SF)
q , 5 / 00 u r .01 1532 = < j? 5 FTE's (Greater than 4,500SF)
Total Proposed FTE's
Amount of FTE's applicant must mitigate for o 3 If < or = J than use A below
If >.1 than use B below
A) FTE's: x $320,186 =
B) Can use all credits or a combination of .1 cash plus credits
Notes:
Page 5 of 7
COMMENTS:
1. Site Plan:
2. FA:
Page 6 of 7
3. Height:
4. Lighting:
5. RDS:
6. Fees:
`Page 7 of 7
7. Other