HomeMy WebLinkAboutFile Documents.1350 Mountain View Dr.0300.2017 (5).ARBK1350 MntV Dr - Parks Comments 12.28.2017
Page:1
Author:mollys
Date:12/28/2017 11:38:33 AM
File Name: 2017-11-15 LIFT-1350MVD-LCD-PERMIT
SET_update02.pdf
Missing Information:
1. Signed statements for both
landscape and irrigation plan.
See section 5.5.12 and 6.3.1 of
Water Efficiency Standards.
2017-11-15 LIFT-1350MVD-LCD-PERMIT SET_update02.pdf (5)
Page:7
Author:mollys
Date:12/28/2017 11:23:45 AM
File Name: 2017-11-15 LIFT-1350MVD-LCD-PERMIT
SET_update02.pdf
Irrigation map does not have
these existing trees on irrigation
zones. Will these be watered
with the lawn? if so remove from
hydrozone calculation.
Page:7
Author:mollys
Date:12/28/2017 11:20:37 AM
File Name: 2017-11-15 LIFT-1350MVD-LCD-PERMIT
SET_update02.pdf
Irrigation plan shows this in on
zone 6 also.
Page:11
Author:mollys
Date:12/28/2017 11:34:51 AM
File Name: 2017-11-15 LIFT-1350MVD-LCD-PERMIT
SET_update02.pdf
Please sign statement.
Page:12
Author:mollys
Date:12/28/2017 11:25:34 AM
File Name: 2017-11-15 LIFT-1350MVD-LCD-PERMIT
SET_update02.pdf
Will proposed shrubs be on zone
4? Please identify what
hydrozone and irrigation zone
they will be on.
Missing Information:1. Signed statements for both landscape and irrigation plan. See section 5.5.12 and 6.3.1 of Water EfficiencyStandards.
COVERED
Irrigation map does nothave these existing treeson irrigation zones. Willthese be watered with thelawn? if so remove from
hydrozone calculation.
Y (PERMEABLE)
FICE GARDEN
Irrigation plan shows
this in on zone 6 also.
ENTER 1
ALVE 5
4
16
16
17
N. WIDTH 13 - 15 & 18
BLY 13
STUB 14
15
NE 19 & 20
- 1" PVC 20
VE 11
ZEON NO.
D 1 SPARERUCTION NOTES
ϱ͘ DEh>Z/Es>s^Ͳ CONTRACTOR TO INSTALL ONE MANUAL DRAIN VALVE ON PRESSURE SUPPLY LINE DIRECTLY DOWNSTREAM OFBACKFLOW PREVENTER AND AT ALL LOW POINTS AND DEAD ENDS OF PRESSURE SUPPLY PIPING TO ENSURE COMPLETE DRAINAGEOF SYSTEM. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THESE LOCATIONS IN-FIELD AND INSTALLATION LOCATIONSSHALL BE NOTED ON AS-BUILTS.
ϲ͘ WKWͲhW^WZzEK>^Ͳ CONTRACTOR TO INSTALL PLASTIC NOZZLES ON ALL POP-UP SPRAY HEADS. INSTALL 15 SERIES NOZZLES ONALL HEADS SPACED AT 12' TO 14'. INSTALL 12 SERIES NOZZLES ON ALL HEADS SPACED 10' TO 11'. INSTALL 10 SERIES NOZZLES ON ALLHEADS SPACED AT 8' TO 9'. INSTALL 8 SERIES NOZZLES ON ALL HEADS SPACED AT 6' TO 7'. INSTALL 5' NOZZLES ON ALL HEADSSPACED AT 5'. INSTALL SIDE STRIP NOZZLES ON ALL HEADS WITH AN "S" DESIGNATION AND RIGHT AND LEFT CORNER STRIP NOZZLESON ALL HEADS WITH AN "L" OR "R" DESIGNATION. VARIABLE ARC NOZZLES SHOULD BE UTILIZED ADJACENT TO CURVILINEAR SHRUBBEDS OR FOR ANY ANGLES THAT ARE NOT A STANDARD NOZZLE ANGLE. WHERE INDICATED, INSTALL LOW FLOW SQ SERIES SQUARENOZZLES AT SPACING SHOWN.
ϳ͘ Z/W/ZZ/'d/KEͲ REFER TO IRRIGATION DETAIL SHEET FOR DRIP EMITTER QUANTITIES AND PLACEMENT.
ϴ͘ hE>>W/W/E'Ͳ ALL UNLABELED LATERAL PIPING SHALL BE 1" MINIMUM UNLESS OTHERWISE NOTED.
ϵ͘ ^>s/E'Ͳ ALL SLEEVING UNDER PAVED SURFACES SHOWN ON PLANS IS BY CONTRACTOR UNLESS OTHERWISE NOTED. SLEEVINGSHALL BE INSTALLED IN THE SIZES AND QUANTITIES SHOWN ON PLANS OR BASED ON THE SCHEDULE BELOW. WHERE SLEEVES ARESHOWN, BUT NOT LABELED, FOLLOW THE SCHEDULE BELOW. ALL MAINLINE, CONTROL WIRES AND DRIP LINES UNDER PAVEDSURFACES ARE TO BE INSTALLED IN SLEEVING. ALL MAINLINE SLEEVE LOCATIONS TO INCLUDE A SEPARATE WIRE SLEEVE.^>sW/W^/ͬt/ZYhEd/dz ZYh/Z^>s^/Θ;YhEd/dzͿ34" - 114" PIPING 2" PVC (1)112" - 2" PIPING 4" PVC (1)
ϭϬ͘ ^WZKEdZK>t/Z^Ͳ CONTRACTOR SHALL EXTEND THREE SPARE WIRES (ONE COMMON AND 2 CONTROL WIRES) FROM EACHCONTROLLER TO THE END OF THE MAINLINE SERVING THAT CONTROLLER OR AS SHOWN ON THE PLANS. INSTALL SPARE WIRES IN 10"ROUND VALVE BOX WITH QUICK COUPLING VALVE. REFER TO SPECIFICATIONS FOR WIRE COLOR. SEE IRRIGATION SCHEDULE FORADDITIONAL INFORMATION.
ϭϭ͘ :h^dDEdͲ CONTRACTOR SHALL FINE TUNE/ADJUST THE IRRIGATION SYSTEM TO REDUCE/AVOID OVERSPRAY ONTO HARDSURFACES & ARCHITECTURE BY ADJUSTING NOZZLE DIRECTION AND NOZZLE RADIUS.
ϭϮ͘ W>E^E^W/&/d/KE^Ͳ CONTRACTOR RESPONSIBLE TO ENSURE WORK CONFORMS TO PLANS AND SPECIFICATIONS. AT ONSET OFCONSTRUCTION, VERIFY PLANS ARE CURRENT. WHERE REQUIRED BY CITY, CONTRACTOR SHALL CONSTRUCT ONLY OFF CITY STAMPEDPLANS. REVISIONS TO CITY STAMPED PLANS SHALL CONFORM TO CITY FIELD CHANGE PROCEDURES AND DOCUMENTATION.
ϭϯ͘ ^WEtdZ&&//Ed>E^W/E'^/'EZ^ddDEdͲ I HAVE COMPLIED WITH THE CRITERIA OF THE WATER EFFICIENT LANDSCAPINGSTANDARDS AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN.
ϭϰ͘ /ZZ/'d/KEt/d,/EZKtͲ CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ANY IRRIGATION WITHIN THE ROW AREA (BETWEEN STREETAND THE PROPERTY LINE) IS TO BE ON SEPARATE CONTROL VALVES THAN THOSE WITHIN THE PROPERTY LINE.
R
CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOUDIG, GRADE, OR EXCAVATE FOR THE MARKING OFUNDERGROUND MEMBER UTILITIES.
Know what's below. Call before you dig.
Title
Drawing No.
(Reserved: COA Stamp)
Issuance PCheck SetBuilding Per2017-11-032017-11-15
Irrigation Notes &Schedule
Please signstatement.
&^
25
25
17 1"
A3
6 1"
A2
18 1"
A1
dr .75"
A6
4 1"
A7
13 1"
A5 dr .75"
A4
()(1)2''(2)2 ()
(1)2''
ϭΖΖ -ϭ
Easement
Will proposed shrubs
be on zone 4? Please
identify what
hydrozone andirrigation zone theywill be on.
These statements are signed by virtue of thesheets containing the statements being signedand sealed by the appropriate discipline.
The proposed shrubs shown here may beeliminated during the value engineering process,so we have assumed for the purpose ofcompliance that the shrubs, if installed asdesigned, will be dripped separately (low use),but in terms of water use calculations, these areincluded in zone A5 (medium use), since thiswould be more restrictive.
These statements are signed by virtue of thesheets containing the statements being signedand sealed by the appropriate discipline.
The proposed deciduous tree shown here maybe eliminated during the value engineeringprocess, so we have assumed for the purpose ofcompliance that the tree, if installed as designed,will be dripped with the adjacent (low use)perennial bed, but in terms of water usecalculations, it is included in zone A15 (mediumuse),since this would be more restrictive.
The note 'Zone A12' refers to the entire region of sod, not just this tree.The deciduous tree to the NE is well established, and its root systemextends fairly far. Because we intend to use turf seed or sod (asappropriate) up to the trunk, it is treated in the calculations as part of thesod area. The tree marked 'A6' is dripped separately and will have a ringof mulch beneath, since its density will likely make sod establishmentdifficult. L8.10 shows a single drip line connecting this tree with theshrub irrigation adjacent.
02/26/2018
Page:2
Author:mollys
Date:12/28/2017 9:24:27 AM
File Name: Water Efficient Landscape Checklist.1350
Mountain View Drive.2017.11.pdf
Signed checklist required prior to
building permit application
submission. Please make sure
to do this in the future.
Water Efficient Landscape Checklist.1350 Mountain View Drive.2017.11.pdf (2)
Page:2
Author:mollys
Date:12/27/2017 10:18:29 AM
File Name: Water Efficient Landscape Checklist.1350
Mountain View Drive.2017.11.pdf
Please finish filling out this
information.
Page:1
Author:mollys
Date:12/28/2017 11:44:06 AM
File Name: Water Efficient Landscape Worksheet.1350
Mountain View Drive.2017.11.pdf
Adjust Hydrozones to reflect
comments on landscape and
irrigation plans.
Water Efficient Landscape Worksheet.1350 Mountain View Drive.2017.11.pdf (1)
LastReviewed: 9/6/2017 Page 2 of 2
(Due at time of building permit application if landscape compliance is required)
REQUIREMENTS:COMMENTS:SUBMITTALCOMPLIANCE:
Site Plan Identify Disturbance Area ٱYes ٱNo
Landscape Design Plan with SoilInformation Required Components Listed inLandscaping Standards ٱYes ٱNo
Irrigation Design Plan Required Components Listed inLandscaping Standards ٱYes ٱNo
Water Budget Analysis & Calc. Sheet Provided by City Staff and Online ٱYes ٱNo
Pools & Water Features (ponds,fountains, etc.)Is there a pool, spa or water feature?ٱYes ٱNo
Are pool and spa covers installed?ٱYes ٱNo
Do features use a recirculating watersystem and/or recycled water if available?ٱYes ٱNo
APPLICANT ACKNOWLEDGEMENT
I/we agree to comply with the requirements of the City of Aspen Water Efficient Landscaping Standards and submit acomplete Landscape and Irrigation Documentation Package.
Applicant Signature Date
Print Name Contact Phone #
FORINTERNAL USE ONLY:
CHECKLIST ACCEPTED & REVIEW BY: _____________________________ DATE: _____________
CHECKLIST WARRANTS LANDSCAPING ORDINANCE COMPLIANCE:ٱYes ٱNo
X
X
X
X
X
11/22/2017
Nooooo
Signed checklist required priorto building permit applicationsubmission. Please make sureto do this in the future.
Water Efficient LandscapingOrdinanceInformation & Documentation Checklist
Total Landscape Area Sq. Ft.: Total Irrigated Area Sq. Ft.:
Project Applicant Name: Project Applicant Phone #:
Irrigation System Installer Name: Irrigation System Installer Phone #:
Landscape Installer Name: Landscape Installer Phone #:
AUTHORIZEDOWNERINFORMATION
Owner Name: Mailing Address – Street:
Mailing Address – City, State, Zip: City Water Account Number:
Phone: Email:
SUMISSION PACKET CHECKLIST
(Due at time of building permit application if landscape compliance is required)
REQUIREMENTS:COMMENTS:SUBMITTALCOMPLIANCE:
SitePlan Identify Disturbance Area ٱYes ٱNo
Landscape Design Plan with SoilInformation Required Components Listed inLandscaping Standards ٱYes ٱNo
Irrigation Design Plan Required Components Listed inLandscaping Standards ٱYes ٱNo
Water Budget Analysis & Calc. Sheet Provided by City Staff and Online ٱYes ٱNo
Pools & Water Features (ponds,fountains, etc.)
Is there a pool, spa or water feature?ٱYes ٱNo
Are pool and spa covers installed?ٱYes ٱNo
Do features use a recirculating watersystem and/or recycled water if available?ٱYes ٱNo
APPLICANT ACKNOWLEDGEMENT
10,756 SF 10,756 SF
Little Leaf LLC
X
X
X
X
X
11/22/2017
Total LandscapeLandscaptal LandscapeandscandsTotal LandscapeTotal Landscapetal Landscapetal Landscapeal LanTotal LandlTotal LaLandal LandLLotal Landttal Landscaptal LandLandscapeLandal LLtaalLLandscaddal LanTotal Landscapeotal Landscapc AreaAAA
Pj Ali N
Please finish fillingout this information.
1
2
345678910
11121314151617
18192021222324252627
28
293031
32333435
36373839
40414243444546
4748
BCDEFG HIJKLCityofAspenWaterEfficientLandscapingOrdinanceCityofAspenParksandRecreationDept.
PreͲSubmissionPacketCompletenessReview585CemeteryLaneAspen,CO81611WATEREFFICIENTLANDSCAPEWORKSHEETͲͲWATERBUDGETANALYSIS 970Ͳ920Ͳ5582
Address:ContactInfo:
CALCULATINGGALLONSOFWATERNEEDEDBYPLANTCATEGORYANDIRRIGATIONTYPEThespecificirrigationwaterneedsofeachhydrozoneinthedesignshouldbedeterminedusingthefollowingformulaandfactors:
Where:ETo=ReferenceEvapotranspirationininches/season(MayͲSept.)Re=EffectivePrecipitationininches/season(MayͲSept.)27.4inches/yearIrrigatedArea=HydrozoneAreainSquareFeet 17.1gallons/squarefoot
WaterUseCategory PlantFactor Code 6.8inches/yearCoolSeasonTurf 0.90 VH 4.2gallons/squarefootHigh 0.80 HMedium 0.65 MLow 0.40 L IrrigationMethodDefaultEfficiencyVeryLow 0.25 VL Overhead 75%Drip90%
HYDROZONEWATERBUDGETCALCULATION
Completethehydrozonetableforeachhydrozone.Useasmanyrowsasnecessarytoprovidethesquarefootageoflandscapeareperhydrozone.
HydrozoneArea PlantWaterNeed
(Sq.Ft.) (gal/season)A1 Overhead 571 8471
A3,A5 Overhead 1286 11761
A4 Drip 10 29A6Drip706 2033A7,A8 Overhead 1435 13124
A11 Drip 10 29A9,A10,A12,A13 Overhead 4767 70722A14Drip1164 3352A15Overhead 588 5378
A17 Drip 63 779A18Drip156 449
TOTAL 10756 11612710.8
448 Sq.Ft. A2,A16Sq.Ft.
Note:ProjectApplicantmustcompletethisworksheetasitisarequiredelementoftheLandscape&IrrigationDocumentationPackage.
1350MountainViewDrive,Aspen,CO81611 JaneLanter,LiftStudio:970.404.5205
DirectionsforUse
Fillinthesebluesectionsbelow.Somecolumnshavedropdownmenustoassist
youinfillingout.Theformulaswill
calculatethesiteaverageannualwater
use.Oncecompletedyoumayeitherattachthisdocumenttothesubmitalpacketorinsertitintothedesignset.
IrrigationWaterBudget=[(EToxPlantFactor)ͲRe]xIrrigatedArea+IrrigationEfficiencyx0.623
ReferenceEvapotranspiration
HydrozonesEfficiency EffectivePrecipitation
IrrigationEfficiency
HydrozonePlantWaterUseType(s)PlantFactor IrrigationMethod IrrigationEfficiency
VH 0.90 0.75
M 0.65 0.75
L 0.40 0.90
L 0.40 0.90
L 0.40 0.90
M 0.65 0.75
VH 0.90 0.75L 0.40 0.90M 0.65 0.75
TotalareaofirrigatedpublicrightͲofͲway:TotalareaofnonͲirrigatedlandscape:
AVERAGEIRRIGATIONWATERNEEDͲALLZONES*ͲIngallons/sq.ft./season*TheaveragemustbelessthantheMaximumAppliedWaterBudgetof7.5gallons/sq.ft./season.
VH 0.90 0.90L 0.40 0.90
Page1of1
11/22/2017
11612711612116126116111612727111612111612711111161271161161211612711661711611612711610.81100010.8818110.1008110.8100.8
Adjust Hydrozones toreflect comments onlandscape andirrigation plans.
We will do so.
Revised and attached.
This sheet accurately reflects our proposedconditions. In any case where we anticipatepossible impact from value engineering, themore restrictive water use category is assumed.Please see comments above.
02/26/2018