HomeMy WebLinkAboutFile Documents.1350 Mountain View Dr.0300.2017 (10).ARBKAir Pollution Control Division – Indoor Environment Program – Asbestos/IAQ Air Unit
4300 Cherry Creek Drive South, APCD-IE-B1
Denver, Colorado 80246-1530
Phone: 303-692-3100 – Fax: 303-782-0278
E-mail: asbestos@state.co.us
Colorado Department of Public Health and Environment
Approval issued on: 5/7/2018
Record number: 137275 $65.00
Check number: 009356Notice Number: 18PI2772D
For the location specified below:
House
1350 Mountainview Dr.
Aspen
Pitkin County
This notice has been issued to:
Kaegebein Fine Homebuilding, Inc.
Issued by: SK
Asbestos Building Inspector:
Inspection Date:04/26/2018
Fee Paid:
P.O. Box 1570
Carbondale, CO 81623
DEMOLITION APPROVAL NOTICE
This approval notice is granted subject to Colorado Air Quality Control Commission Regulation
No. 8, Part B, adopted December 21, 2007, and effective January 30, 2008 and the Colorado Air
Pollution Prevention and Control Act C.R.S. (25-7-101 and 25-7-501 et seq). This notice signifies
that the structure was inspected for asbestos, luminous exit signs (containing radioactive material),
and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the
Colorado Department of Public Health and Environment pursuant to Regulation No. 8, Part B.
THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES.
Immediately notify the Asbestos/IAQ Unit of project modifications by fax (number above) or e-mail
(address above) and the appropriate county health department by fax. Project modifications include
changes in the scope of work or the scheduled work dates, etc.
This demolition approval notice is valid beginning 5/3/2018.
The actual scheduled work dates are from 5/3/2018 through 6/3/2018.
Please note that certain asbestos-containing materials (ACM) may remain in the structure
during demolition. Therefore, any demolition debris left behind after the completion of post-
demolition site cleanup may constitute a "reason to know of asbestos-contaminated soil" at
the site, subject to the requirements of Section 5.5 of the Solid Waste Regulations (6 CCR
1007-2, Part 1).
As a contractor, you may be subject to other demolition licenses and permits, depending on the
requirements of the county and municipality in which the work is being performed. The Colorado
Department of Public Health and Environment, Air Pollution Control Division, strongly suggests
that you check with county and municipal authorities in order to determine any other local
building/permitting requirements that must be met.
Douglas A. Close
2930Cerification No.: