Loading...
HomeMy WebLinkAboutFile Documents.1310 Red Butte Dr.0114.2018 (7).ARBK1310 Red Butte Bridge - Construction Proposal Date:2.26.17 Item # Description Bid/Allow Qty Unit Unit Price Total 10010 Contingency Allow 0.1 LS -$ 10020 Insurance Allow 0.015 LS -$ -$ 10050 Plans and Permit -Plan Development, Specs, CMP, Permit Package Allow 1 LS 20,000.00$ 20,000.00$ 13105 Project Management Construction - Field Superintendent Allow 2 Month 7,310.00$ 14,620.00$ Construction - Project Manager Allow 2 Month 7,740.00$ 15,480.00$ 14339 Mockups Allow 1 LS 500.00$ 500.00$ 15110 Temp Utilities Temp Power Allow 2 Month 250.00$ 500.00$ Temp Heat Allow 0 Month 2,500.00$ -$ 15210 Field Office - 8'x28' Mobilization/Demobilization Allow 2 EA 850.00$ 1,700.00$ Monthly Fees Allow 2 Month 254.14$ 508.28$ Office Phone/Internet Allow 2 Month 120.00$ 240.00$ 15220 Sanitary Facilities Allow 2 Month 175.00$ 350.00$ 15450 Material and Equipment Allow 2 Month 450.00$ 900.00$ 15455 Equipment Rental Miscellaneous Allow 1 LS 1,500.00$ 1,500.00$ 15619 Site Sound Mitigation Allow 1 LS 10,000.00$ 10,000.00$ 15620 Temp Fencing Allow 1 LS 3,000.00$ 3,000.00$ 16510 Postage and Freight Allow 1 LS 100.00$ 100.00$ 17410 Waste Management & Disposal 30 Yard Construction Waste Container Allow 1 EA 625.00$ 625.00$ Concrete Wash Allow 1 EA 551.00$ 551.00$ 17420 Site Maintenance/Common Labor Allow 80 HR 25.00$ 2,000.00$ Sub-Total 72,574.28$ 22100 Survey Abutment Layout Allow 1 LS 1,700.00$ 1,700.00$ Corners Prior to Excavation Allow 1 LS 500.00$ 500.00$ Foundation Corners Allow 1 LS 500.00$ 500.00$ ILC Survey Allow 1 LS 1,200.00$ 1,200.00$ City Of Aspen Survey Allow 1 LS 2,500.00$ 2,500.00$ Sub-Total 6,400.00$ 33100 Structural Concrete Concrete General Conditions Allow 1 LS 2,500.00$ 2,500.00$ Concrete Abutments - Board Formed Allow 7 CY 1,500.00$ 10,500.00$ Sub-Total 13,000.00$ Documents: REG Bridge Rehabilitation 5.16.16 Division 3 - Concrete Division 2 - Existing Conditions Division 1 - General Requirements 04/24/2018 51000 Structural Steel Crane Allow 3 LS 850.00$ 2,550.00$ Steel Channel Beams Allow 1 LS 5,700.00$ 5,700.00$ Steel Decking Allow 1 LS 2,400.00$ 2,400.00$ Steel Railing Allow 1 LS 5,820.00$ 5,820.00$ Sub-Total 16,470.00$ 99100 Painting Exterior - Tenemic, Epoxy Paint Allow 1 LS 5,000.00$ 5,000.00$ Sub-Total 5,000.00$ 312300 Excavation Mobilization Allow 1 LS 2,000.00$ 2,000.00$ Silt Fencing, Erosion Control BMP's Allow 1 LS 3,000.00$ 3,000.00$ Excavation Allow 1 LS 11,000.00$ 11,000.00$ Export Allow 1 LS 1,700.00$ 1,700.00$ Top Spoil Import and Final Grade Allow 1 LS 3,500.00$ 3,500.00$ Sub-Total 21,200.00$ 329000 Plantings and Landscape Reveg and restoration Allow 1 LS 9,500.00$ 9,500.00$ Sub-Total 9,500.00$ Sub-Total 144,144.28$ Contingency (10%) 14,414.43$ Liability Insurance (1.5%) 2,378.38$ Fee 24,140.56$ Total Contract 185,077.65$ Division 32 - Exterior Improvements Division 31 - Earthwork Division 9 - Finishes Division 5 - Steel And Metals 04/24/2018