Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.1310 Red Butte Dr.0114.2018 (8).ARBK
1310 Red Butte Bridge - Repair Estimate Estimate Date:2.26.17 Item # Description Bid/Allow Qty Unit Unit Price Total Construction - Field Superintendent Allow 0.35 Month 7,310.00$ 2,558.50$ Miscellaneous Allow 1 LS 350.00$ 350.00$ 17420 Site Maintenance/Common Labor Allow 20 HR 25.00$ 500.00$ Sub-Total 3,408.50$ 51000 Structural Steel Crane Allow 1 LS 850.00$ 850.00$ Steel Channel Beams Allow 1 LS 5,700.00$ 5,700.00$ Steel Railing Allow 1 LS 5,820.00$ 5,820.00$ Sub-Total 12,370.00$ 312300 Excavation Silt Fencing, Erosion Control BMP's Allow 1 LS 450.00$ 450.00$ Sub-Total 450.00$ 329000 Plantings and Landscape Reveg and restoration Allow 1 LS 500.00$ 500.00$ Sub-Total 500.00$ Sub-Total 16,728.50$ Contingency (0%) -$ Liability Insurance (1.5%) 250.93$ Fee 1,358.35$ Total Contract 18,337.78$ Division 32 - Exterior Improvements Division 31 - Earthwork Documents: REG Bridge Rehabilitation 5.16.16 Division 5 - Steel And Metals Division 1 - General Requirements 04/24/2018