Loading...
HomeMy WebLinkAboutFile Documents.1310 Red Butte Dr.0114.2018 (8).ARBK1310 Red Butte Bridge - Repair Estimate Estimate Date:2.26.17 Item # Description Bid/Allow Qty Unit Unit Price Total Construction - Field Superintendent Allow 0.35 Month 7,310.00$ 2,558.50$ Miscellaneous Allow 1 LS 350.00$ 350.00$ 17420 Site Maintenance/Common Labor Allow 20 HR 25.00$ 500.00$ Sub-Total 3,408.50$ 51000 Structural Steel Crane Allow 1 LS 850.00$ 850.00$ Steel Channel Beams Allow 1 LS 5,700.00$ 5,700.00$ Steel Railing Allow 1 LS 5,820.00$ 5,820.00$ Sub-Total 12,370.00$ 312300 Excavation Silt Fencing, Erosion Control BMP's Allow 1 LS 450.00$ 450.00$ Sub-Total 450.00$ 329000 Plantings and Landscape Reveg and restoration Allow 1 LS 500.00$ 500.00$ Sub-Total 500.00$ Sub-Total 16,728.50$ Contingency (0%) -$ Liability Insurance (1.5%) 250.93$ Fee 1,358.35$ Total Contract 18,337.78$ Division 32 - Exterior Improvements Division 31 - Earthwork Documents: REG Bridge Rehabilitation 5.16.16 Division 5 - Steel And Metals Division 1 - General Requirements 04/24/2018