Loading...
HomeMy WebLinkAboutFile Documents.1310 Red Butte Dr.0114.2018 (14).ARBK0114.2018.ARBK_1310 Red Butte Dr Page: S16 BRIDGE REHABILITATION Author: pjm File Name: 06_1310 RB Bridge_Rehab drawings.pdf 1. Clarify if there is proposed work to the stairs leading to the bridge. 2. So that the improvements to the bridge do not impact the base flood elevation of the river per a registered PE's analysis. 3. Provide documentation on means and methods for the repair to the bridge. Since this work is in the top of slope area call out that this work shall be done using hand tools and no heavy machinery. 4. Clarify if this bridge repair has gone through stream margin review and if so provide the documentation. It appears that the stream margin approvals were only provided for the redevelopment of the residence. 06_1310 RB Bridge_Rehab drawings.pdf (1) Ex. 2x laminated beam New C15x33.9, bolted to ex. beam New C15x33.9, bolted to ex. beam Plan View Connection to ex foundtion, TBD-typ Handrail: 2x6 grab bar, 4x4 post 4x4 WWF 1. Clarify if there is proposed work to the stairs leading to the bridge. 2. So that the improvements to the bridge do not impact the base flood elevation of the river per a registered PE's analysis. 3. Provide documentation on means and methods for the repair to the bridge. Since this work is in the top of slope area call out that this work shall be done using hand tools and no heavy machinery. 4. Clarify if this bridge repair has gone through stream margin review and if so provide the documentation. It appears that the stream margin approvals were only provided for the redevelopment of the residence. 07/13/2018