HomeMy WebLinkAboutFile Documents.1310 Red Butte Dr.0114.2018 (14).ARBK0114.2018.ARBK_1310 Red Butte Dr
Page: S16 BRIDGE REHABILITATION
Author: pjm
File Name: 06_1310 RB Bridge_Rehab drawings.pdf
1. Clarify if there is proposed
work to the stairs leading to the
bridge.
2. So that the improvements to
the bridge do not impact the
base flood elevation of the river
per a registered PE's analysis.
3. Provide documentation on
means and methods for the
repair to the bridge. Since this
work is in the top of slope area
call out that this work shall be
done using hand tools and no
heavy machinery.
4. Clarify if this bridge repair has
gone through stream margin
review and if so provide the
documentation. It appears that
the stream margin approvals
were only provided for the
redevelopment of the residence.
06_1310 RB Bridge_Rehab drawings.pdf (1)
Ex. 2x laminated beam
New C15x33.9, bolted to ex. beam
New C15x33.9, bolted to ex. beam
Plan View
Connection to ex foundtion, TBD-typ
Handrail: 2x6 grab bar, 4x4 post
4x4 WWF
1. Clarify if there is proposed work to the stairs leading to the
bridge.
2. So that the improvements to the bridge do not impact the
base flood elevation of the river per a registered PE's analysis.
3. Provide documentation on means and methods for the repair
to the bridge. Since this work is in the top of slope area call out
that this work shall be done using hand tools and no heavy
machinery.
4. Clarify if this bridge repair has gone through stream margin
review and if so provide the documentation. It appears that the
stream margin approvals were only provided for the
redevelopment of the residence.
07/13/2018