Loading...
HomeMy WebLinkAboutFile Documents.1310 Red Butte Dr.0114.2018 (16).ARBKJune 28, 2018 RESPONSE TO ENGINEERING DEPARTMENT QUESTIONS PERMIT: 0014.2018.ARBK_1310 Red Butte Dr. 1. The steps leading to the bridge are to remain “as is”. 2. There is no change to the abutments or elevation of the bridge, therefore no impact to base flood elevation. See Attached No Rise letter from Roaring Fork Engineering. 3. All repair work to the bridge is “by hand”. All tools involved will be hand tools. All materials will be prefabricated off site and sized such that all pieces can be carried to the bridge by workers. There is no existing access or need for equipment. 4. The bridge area was included in the approved stream margin review for the house. See attached . 07/13/2018