Loading...
HomeMy WebLinkAboutFile Documents.1310 Red Butte Dr.0114.2018 (17).ARBKFrom:Jim Pomeroy To:Mike Simpson; "Stephen Ellsperman" Cc:Jennifer Phelan; Justin Hahn; PJ Murray; John Barker; Sophie Varga Subject:RE: 1310 Red Butte bridge repair Date:Friday, September 28, 2018 11:26:12 AM Attachments:image005.png image006.png image010.png Thanks Mike, That plan meets with our requirements. You should coordinate with the Permit Coordinator on resubmitting plans. Cheers,   Jim Pomeroy Zoning Enforcement Officer 130 S. Galena St. Aspen, CO 81611 p 970.429.2745 c 970.618.3790 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. From: Mike Simpson <mikesimpson@korultd.com> Sent: Friday, September 28, 2018 10:39 AM To: Jim Pomeroy <jim.pomeroy@cityofaspen.com>; 'Stephen Ellsperman' <sellsperman@dhmdesign.com> Cc: Jennifer Phelan <jennifer.phelan@cityofaspen.com>; Justin Hahn <Justin.Hahn@cityofaspen.com>; PJ Murray <pj.murray@cityofaspen.com> Subject: RE: 1310 Red Butte bridge repair Jim, We have modified our approach and plan per your directive. I have attached the revised plan. What 10/01/2018 is the best path to formally resubmitting this document? Thank you for your time and input. Best regards, Mike Mike Simpson Cell: 970.379.5580 Email: mikesimpson@korultd.com Phone: 970.963.0577 Fax: 970.963.9389 KORU LIMITED 2551 Delores Way Carbondale • Colorado 81623 • US http://www.korultd.com Redefining the building experience From: Jim Pomeroy [mailto:jim.pomeroy@cityofaspen.com] Sent: Monday, September 10, 2018 10:11 AM To: 'Stephen Ellsperman' <sellsperman@dhmdesign.com>; Mike Simpson <mikesimpson@korultd.com> Cc: Jennifer Phelan <jennifer.phelan@cityofaspen.com>; Justin Hahn <Justin.Hahn@cityofaspen.com>; PJ Murray <pj.murray@cityofaspen.com> Subject: 1310 Red Butte bridge repair HI Stephen and Mike, Thank you for being patient with us while we got our ducks in a row internally. After discussing this matter with both the building dept and the engineering dept., we feel that we have a unified answer and can give you clear direction on a bridge plan that will meet each department’s needs. Both engineering and building agree that they do not want the major structure holding up the bridge to fail, and they do not want It to become a life safety issue or a river hazard. However, neither department requires the railing to be upgraded at this point. Therefore, you are clear to upgrade the beam and replace the decking boards, as the current plans show, but you will need to figure out a way to maintain the railings that are in place now. If you have questions on this direction, please feel free to contact me. Cheers,   Jim Pomeroy Zoning Enforcement Officer 10/01/2018 130 S. Galena St. Aspen, CO 81611 p 970.429.2745 c 970.618.3790 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. 10/01/2018