Thanks Mike,
That plan meets with our requirements. You should coordinate with the Permit Coordinator on
resubmitting plans.
Cheers,
Jim Pomeroy
Zoning Enforcement Officer
130 S. Galena St.
Aspen, CO 81611
p 970.429.2745
c 970.618.3790
www.cityofaspen.com
www.aspencommunityvoice.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations
that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any
claim of detrimental reliance.
From: Mike Simpson <mikesimpson@korultd.com>
Sent: Friday, September 28, 2018 10:39 AM
To: Jim Pomeroy <jim.pomeroy@cityofaspen.com>; 'Stephen Ellsperman'
<sellsperman@dhmdesign.com>
Cc: Jennifer Phelan <jennifer.phelan@cityofaspen.com>; Justin Hahn
<Justin.Hahn@cityofaspen.com>; PJ Murray <pj.murray@cityofaspen.com>
Subject: RE: 1310 Red Butte bridge repair
Jim,
We have modified our approach and plan per your directive. I have attached the revised plan. What
10/01/2018
is the best path to formally resubmitting this document? Thank you for your time and input.
Best regards,
Mike
Mike Simpson
Cell: 970.379.5580
Email: mikesimpson@korultd.com
Phone: 970.963.0577
Fax: 970.963.9389
KORU LIMITED
2551 Delores Way
Carbondale • Colorado 81623 • US
http://www.korultd.com
Redefining the building experience
From: Jim Pomeroy [mailto:jim.pomeroy@cityofaspen.com]
Sent: Monday, September 10, 2018 10:11 AM
To: 'Stephen Ellsperman' <sellsperman@dhmdesign.com>; Mike Simpson
<mikesimpson@korultd.com>
Cc: Jennifer Phelan <jennifer.phelan@cityofaspen.com>; Justin Hahn
<Justin.Hahn@cityofaspen.com>; PJ Murray <pj.murray@cityofaspen.com>
Subject: 1310 Red Butte bridge repair
HI Stephen and Mike,
Thank you for being patient with us while we got our ducks in a row internally. After discussing this
matter with both the building dept and the engineering dept., we feel that we have a unified answer
and can give you clear direction on a bridge plan that will meet each department’s needs. Both
engineering and building agree that they do not want the major structure holding up the bridge to
fail, and they do not want It to become a life safety issue or a river hazard. However, neither
department requires the railing to be upgraded at this point. Therefore, you are clear to upgrade
the beam and replace the decking boards, as the current plans show, but you will need to figure out
a way to maintain the railings that are in place now. If you have questions on this direction, please
feel free to contact me.
Cheers,
Jim Pomeroy
Zoning Enforcement Officer
10/01/2018
130 S. Galena St.
Aspen, CO 81611
p 970.429.2745
c 970.618.3790
www.cityofaspen.com
www.aspencommunityvoice.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations
that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any
claim of detrimental reliance.
10/01/2018