HomeMy WebLinkAboutFile Documents.1310 Red Butte Dr.0114.2018 (20).ARBKFrom:Jim Pomeroy
To:Karla Henrichon
Subject:FW: Bridge repair for 1310 Red Butte
Date:Monday, July 9, 2018 10:51:17 AM
Attachments:image009.png
image001.png
image006.png
Here is what I sent to the design team along with their response.
Cheers,
Jim Pomeroy
Zoning Enforcement Officer
130 S. Galena St.
Aspen, CO 81611
p 970.429.2745
c 970.618.3790
www.cityofaspen.com
www.aspencommunityvoice.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations
that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any
claim of detrimental reliance.
From: Jim Pomeroy
Sent: Tuesday, June 19, 2018 2:08 PM
To: 'Jen Dicuollo' <jdicuollo@dhmdesign.com>; Stephen Ellsperman
<sellsperman@dhmdesign.com>
Cc: PJ Murray <pj.murray@cityofaspen.com>
Subject: RE: Bridge repair for 1310 Red Butte
Great. Please feel free to send me PDF of any design ideas that you might want feedback on before
final submission.
Cheers,
07/13/2018
Jim Pomeroy
Zoning Enforcement Officer
130 S. Galena St.
Aspen, CO 81611
p 970.429.2745
c 970.618.3790
www.cityofaspen.com
www.aspencommunityvoice.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations
that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any
claim of detrimental reliance.
From: Jen Dicuollo [mailto:jdicuollo@dhmdesign.com]
Sent: Tuesday, June 19, 2018 1:28 PM
To: Jim Pomeroy <jim.pomeroy@cityofaspen.com>; Stephen Ellsperman
<sellsperman@dhmdesign.com>
Cc: PJ Murray <pj.murray@cityofaspen.com>
Subject: RE: Bridge repair for 1310 Red Butte
Jim,
Thank you for your review and feedback on the design direction for the bridge maintenance work.
We are in the process of addressing your comments in addition to comments we have received
from the building and engineering departments. We have been working with our structural engineer
and will be submitting an updated plan that takes all of the feedback we have received into
consideration with a revised design.
Best,
Jennifer DiCuollo
Senior Associate | PLA
DHM DESIGN
Landscape Architecture | Land Planning | Ecological Planning | Urban Design
311 Main Street, Suite 102 | Carbondale, CO 81623
O: 970.963.6520
07/13/2018
Website · Blog · Facebook · LinkedIn
From: Jim Pomeroy [mailto:jim.pomeroy@cityofaspen.com]
Sent: Thursday, June 14, 2018 11:19 AM
To: Stephen Ellsperman <sellsperman@dhmdesign.com>; Jen Dicuollo <jdicuollo@dhmdesign.com>
Cc: PJ Murray <pj.murray@cityofaspen.com>
Subject: Bridge repair for 1310 Red Butte
Hi Folks,
I discuss with our staff the bridge design ideas that you all had sent me ,and I received clear direction
on what is going to be permissible. As you all know, this non-conforming bridge lies below the top of
bank and therefore outside of the building envelope established during the stream margin approval.
As such, the code clearly states that it can be maintained, but not rebuilt. Therefore, repairs that are
more in keeping with maintenance is the objective. The lower half of the bridge, sistering steel to
the original beams and replacing the wooden walkway with new wooden boards is acceptable.
Please note, it is imperative that the original beams are kept in place and sistered behind with the
steel. If those beams “disappear” in the process, there is a very real chance that this bridge will not
come back.
As to the railing, simply ripping out the wooden railing and replacing it with a metal railing would not
be considered maintenance. Ideally we would want to see the existing wooden railing kept in place
and augmented to make it structurally sound – much like what is being done on the lower portion.
Please work with your engineering and design team to formulate a plan that stresses maintenance
over replacement and send us a new design. If you have questions please contact me.
Cheers,
Jim Pomeroy
Zoning Enforcement Officer
130 S. Galena St.
Aspen, CO 81611
p 970.429.2745
c 970.618.3790
www.cityofaspen.com
www.aspencommunityvoice.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
07/13/2018
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations
that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any
claim of detrimental reliance.
07/13/2018