The plan for the structural
repairs should be stamped by
your structural engineer.
06_1310 RB Bridge_Rehab drawings.pdf (4)
Subject: PlanCheck
Page Label: S16 BRIDGE REHABILITATION
Author: justinh
File Name: 06_1310 RB Bridge_Rehab drawings.pdf
Openings in the guard are
required to be less than 4" to
restrict the passage of a 4"
sphere (including the gap
between the bottom rail and the
decking) - IRC 312.1.3, and is
required to be 36" tall per IRC
312.1.2. Dimension both these
items to show code compliance.
Subject: PlanCheck
Page Label: S16 BRIDGE REHABILITATION
Author: justinh
File Name: 06_1310 RB Bridge_Rehab drawings.pdf
It the connection between the
L2x2x1/4 and the new channel
a welded connection? If so, a
signed special inspection
agreement is required
(attached). If this is a welded
connection show it as such on
this plan.
Subject: PlanCheck
Page Label: S16 BRIDGE REHABILITATION
Author: justinh
File Name: 06_1310 RB Bridge_Rehab drawings.pdf
Provide a plan for the connection
to the existing foundation.
Clearly show how the structure
will be anchored to the existing
foundation to resist flotation,
collapse or permanent lateral
movement due to structural
loads and stresses from flooding
- IRC 322.1.2. Provide
calculations or a letter stamped
by a professional engineer that
shows how you've calculated
these flood event forces and
showing that the new structural
connections will withstand these
forces.
Eng'
Proje x Foundation
Rvd'
The plan for the structural
repairs should be stamped
by your structural engineer.
Eng'd By
Project Nu
Grinsp
Foley
1310 Red
Aspen, Co
please
m
4x4 posts,
Ex Foundationam beyond
d to ex. beam
Rvd'd By
Openings in the guard are
required to be less than 4" to
restrict the passage of a 4"
sphere (including the gap
between the bottom rail and the
decking) - IRC 312.1.3, and is
required to be 36" tall per IRC
312.1.2. Dimension both these
items to show code compliance.
Bridge Overview
Scale: 1/4" = 1'-0"
1
S16
Elevation View
Ex grade
Channel Conn
Scale: 1/2" = 1'-
2
S16
2
New Channel
3/4"ø bolts @ ~24" oc
Handrails per arch
L2x2x1/4 to support decking
Wood blocking @ bolt
It the connection
between the L2x2x1/4
and the new channel
a welded connection?
If so, a signed special
inspection agreement
is required (attached).
If this is a welded
connection show it as
such on this plan.
Ex Foundation
New
New
Plan View
Connection to ex foundtion, TBD-typ
Elevation Vi
Ex Foundation
Provide a plan for the
connection to the existing
foundation. Clearly show how
the structure will be anchored to
the existing foundation to resist
flotation, collapse or permanent
lateral movement due to
structural loads and stresses
from flooding - IRC 322.1.2.
Provide calculations or a letter
stamped by a professional
engineer that shows how
you've calculated these flood
event forces and showing that
the new structural connections
will withstand these forces.
See attached plan from
REG dated 6.14.18. MS
See attached plan
from REG dated
6.14.18. This plan
is more consistent
with the existing
railing. MS
See attached plan
from REG dated
6.14.18 which
details this
connection to
existing abutments.
MS
See attached plan
from REG dated
6.14.18. See
attached Special
Inspection sheet.
MS