HomeMy WebLinkAboutFile Documents.1300 Red Butte Dr.0272.2018 (7).ARBKEngineering Markup Summary 11-21-2018
Page: [6] C.1.05 SUB-BASIN DRAINAGE
Author: mikeh
Date: 11/21/2018 10:35:07 AM
File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf
Drainage from vehicle parking
areas requires pre-treatment
before entering drywell. Please
include pre-treatment for basin
1.8.
Civil - Permit 1300 Red Butte 10.30.2018.pdf (8)
Page: [7] C.1.06 GRADING AND DRAINAGE
Author: mikeh
Date: 11/21/2018 10:28:57 AM
File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf
More spot elevations are
required to ensure runoff
reaches inlet.
Page: [7] C.1.06 GRADING AND DRAINAGE
Author: mikeh
Date: 11/21/2018 10:27:06 AM
File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf
Please provide elevations of all
existing downspouts to ensure
conveyance to all inlets.
Page: [9] C.1.08 STORM SYSTEM P&P
Author: mikeh
Date: 11/21/2018 10:42:01 AM
File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf
Please include sanitary service
location on profile to ensure no
conflicts exist.
Page: [9] C.1.08 STORM SYSTEM P&P
Author: mikeh
Date: 11/21/2018 10:39:07 AM
File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf
Please include excavation plan
for drywells. 13' deep excavation
must minimize impacts to trees.
Drainage from vehicle parking areas
requires pre-treatment before entering
drywell. Please include pre-treatment for
basin 1.8.
More spot elevations
are required to ensure
runoff reaches inlet.
Please provide elevations of all
existing downspouts to ensure
conveyance to all inlets.
Please include sanitary
service location on
profile to ensure no
conflicts exist.
Please include excavation plan for
drywells. 13' deep excavation must
minimize impacts to trees.
02/14/2019
Page: [9] C.1.08 STORM SYSTEM P&P
Author: mikeh
Date: 11/21/2018 10:41:18 AM
File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf
Please obtain approval from
sanitary district for separation
requirements from drywell.
Page: [9] C.1.08 STORM SYSTEM P&P
Author: mikeh
Date: 11/21/2018 10:43:53 AM
File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf
Do we have any information on
where these downspouts are
piped?
Page: [9] C.1.08 STORM SYSTEM P&P
Author: mikeh
Date: 11/21/2018 10:37:45 AM
File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf
Pipe connecting drywells
requires approximately 4' of
excavation within the drip line of
existing trees. Please obtain
Parks Department permission for
excavation or re-align
connection pipe.
Please obtain approval
from sanitary district
for separation
requirements from
drywell.
Do we have any information on where
these downspouts are piped?
Pipe connecting drywells requires
approximately 4' of excavation within the
drip line of existing trees. Please obtain
Parks Department permission for
excavation or re-align connection pipe.
02/14/2019