Loading...
HomeMy WebLinkAboutFile Documents.1300 Red Butte Dr.0272.2018 (7).ARBKEngineering Markup Summary 11-21-2018 Page: [6] C.1.05 SUB-BASIN DRAINAGE Author: mikeh Date: 11/21/2018 10:35:07 AM File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf Drainage from vehicle parking areas requires pre-treatment before entering drywell. Please include pre-treatment for basin 1.8. Civil - Permit 1300 Red Butte 10.30.2018.pdf (8) Page: [7] C.1.06 GRADING AND DRAINAGE Author: mikeh Date: 11/21/2018 10:28:57 AM File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf More spot elevations are required to ensure runoff reaches inlet. Page: [7] C.1.06 GRADING AND DRAINAGE Author: mikeh Date: 11/21/2018 10:27:06 AM File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf Please provide elevations of all existing downspouts to ensure conveyance to all inlets. Page: [9] C.1.08 STORM SYSTEM P&P Author: mikeh Date: 11/21/2018 10:42:01 AM File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf Please include sanitary service location on profile to ensure no conflicts exist. Page: [9] C.1.08 STORM SYSTEM P&P Author: mikeh Date: 11/21/2018 10:39:07 AM File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf Please include excavation plan for drywells. 13' deep excavation must minimize impacts to trees. Drainage from vehicle parking areas requires pre-treatment before entering drywell. Please include pre-treatment for basin 1.8. More spot elevations are required to ensure runoff reaches inlet. Please provide elevations of all existing downspouts to ensure conveyance to all inlets. Please include sanitary service location on profile to ensure no conflicts exist. Please include excavation plan for drywells. 13' deep excavation must minimize impacts to trees. 02/14/2019 Page: [9] C.1.08 STORM SYSTEM P&P Author: mikeh Date: 11/21/2018 10:41:18 AM File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf Please obtain approval from sanitary district for separation requirements from drywell. Page: [9] C.1.08 STORM SYSTEM P&P Author: mikeh Date: 11/21/2018 10:43:53 AM File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf Do we have any information on where these downspouts are piped? Page: [9] C.1.08 STORM SYSTEM P&P Author: mikeh Date: 11/21/2018 10:37:45 AM File Name: Civil - Permit 1300 Red Butte 10.30.2018.pdf Pipe connecting drywells requires approximately 4' of excavation within the drip line of existing trees. Please obtain Parks Department permission for excavation or re-align connection pipe. Please obtain approval from sanitary district for separation requirements from drywell. Do we have any information on where these downspouts are piped? Pipe connecting drywells requires approximately 4' of excavation within the drip line of existing trees. Please obtain Parks Department permission for excavation or re-align connection pipe. 02/14/2019