HomeMy WebLinkAboutFile Documents.1252 Snowbunny Ln.0278.2018 (7).ARBKMarkup Summary
Page: 6
Author: jackd
File Name: Deck change submittal.pdf
Permeable paver spec needs to
conform to COA detail provided
on page 8-55 of URMP.
6 (4)
Page: 6
Author: jackd
File Name: Deck change submittal.pdf
Washed AASHTO #57 or #67
aggregate needs to be used for
reservoir.
Page: 6
Author: jackd
File Name: Deck change submittal.pdf
Concrete perimeter barrier
recommended to prevent settling
of pavers. This is not required.
Page: 6
Author: jackd
File Name: Deck change submittal.pdf
Typ. No. 8 Aggregate in
openings.
Permeable paver
spec needs to
conform to COA
detail provided on
page 8-55 of URMP.Hayes Con Inc 970-61 nny Lane eWashed AASHTO
#57 or #67 aggregate
needs to be used for
reservoir.
Concrete perimeter
barrier recommended
to prevent settling of
pavers. This is notrequired.
Typ. No. 8 Aggregate
in openings.
Permeable Paver detail has been revised to conform to the detail on
page 8-55 of the URMP.
The detail has been revised to specify AASHTO #57 or #67 aggregate
in the reservoir portion.
A concrete perimeter barrier has been added to the detail.
The detail has been revised to include No. 8 aggregate in the
in-fill and leveling course.
03/16/2019