HomeMy WebLinkAboutFile Documents.1252 Snowbunny Ln.0278.2018 (16).ARBKNarrative of work proposed in change order
We are proposing to remove the existing deck completely along with
the existing hot tub. We would then build a 7’x10’ landing at the
existing French door with stairs down to a on grade patio made out of
permeable pavers as shown. We would replace the existing hot tub
with a new hot tub of similar size that would be recessed in the ground
and the top of the hot tub cover would not exceed 12” from grade.
03/16/2019