Loading...
HomeMy WebLinkAboutFile Documents.1252 Snowbunny Ln.0278.2018 (16).ARBKNarrative of work proposed in change order We are proposing to remove the existing deck completely along with the existing hot tub. We would then build a 7’x10’ landing at the existing French door with stairs down to a on grade patio made out of permeable pavers as shown. We would replace the existing hot tub with a new hot tub of similar size that would be recessed in the ground and the top of the hot tub cover would not exceed 12” from grade. 03/16/2019