Loading...
HomeMy WebLinkAboutFile Documents.1250 Snowbunny Ln.0040.2018 (8).ARBKCITY OF ASPEN WATER UTILITY DEVELOPMENT REVIEW FEE ECU CALCULATION WORKSHEET FOR REMODEL DATE:PERMIT # NAME:ACCT. # ADDRESS: FIXTURE (A)(B)(C)(D) BEDROOM 0.10 0 0 0 tub/ shwr, toilet, lav =1st Bath 0.36 0 0 0 tub/ shwr, toilet, lav =2nd Bath 0.24 0 0 0 TOILETS / URINALS / BIDETS 0.05 4 0.2 4 0.2 LAV 0.02 5 0.1 5 0.1 TUB / SHOWER 0.05 3 0.15 3 0.15 TUB ONLY 0.05 0 0 0 TUB OVERSIZED 0.02 0 0 0 WHIRLPOOL UPGRADE 0.05 0 0 0 SHOWER STALL 0.05 1 0.05 1 2 0.1 STEAM ROOM / SHOWER 0.08 0 0 0 STEAM SHOWER UPGRADE 0.03 0 1 1 0.03 KITCHEN 0.25 0 0 0 DISHWASHER 0.10 1 0.1 1 0.1 DISPOSAL 0.05 1 0.05 1 0.05 ADD KITCHEN SINK / POT FILLER 0.05 0 0 0 KITCHEN / EFF.0.15 0 0 0 BAR / HAND SINK 0.05 1 0.05 1 0.05 ICE MACHINE 0.05 1 0.05 1 0.05 WASHER 0.10 1 0.1 1 2 0.2 LNDRY /UTIL. SINK / DOG WASH 0.05 0 0 0 1st HOSE BIB 0.20 1 0.2 1 0.2 2nd HOSE BIB 0.10 1 0.1 1 0.1 ADD HOSE BIB 0.05 0 0 0 HOT TUB / @100 GAL 0.02 1 0.02 1 0.02 ADD LANDSCAPE / 100 SQ FT 0.01 5 0.05 5 0.05 POOL / 1000 GAL / YEAR ROUND 0.02 0 0 0 TOTAL ECU COUNT 1.22 1.4 0.18 TOTAL DEVELOPMENT REVIEW FEE $212.72 ECU RATE NUMBER OF EXISTING FIXTURES* EXISTING ECU COUNT NUMBER OF FIXTURES TO BE REMOVED NUMBER OF NEW FIXTURES TOTAL NUMBER OF WATER FIXTURES PROPOSED ECU COUNT FOR REMODEL INCREASE IN ECU COUNT DUE TO REMODEL *Note: If the number of existing fixtures that you provide in column A differs from the number in the Utilities Department's records, the Department will revise those numbers during its review of your permit. As a result these fees may change. 03/07/2018