Loading...
HomeMy WebLinkAboutFile Documents.1250 Snowbunny Ln.0040.2018 (14).ARBK0040-2018-ARBK_BuildingComments_1 Page: 13 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: PlanCheck Author: nickt Color: You have removed the mechanical room. Provide information on all new equipment including: -Description of all equipment, systems and sequence of operation. -Fuel types and combustion air requirements. -Location of all equipment; provide access and service space. -Location of all exterior intakes and exhausts with dimensions to intakes, openings, and property lines. 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf (11) Page: 13 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: Electric Panel Author: nickt Color: Show the location of the electric panel. Adequate working space and equipment space must be provided and it may not be in a closet (2017 NEC 110.26). Page: 13 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: R308.4 Safety Glazing windows Author: nickt Color: On the plans or window schedule, label each individual window that must be safety glazed (R308.4). Page: 14 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: PlanCheck Author: nickt Color: Provide stamped structural plans. If there are any items that require special inspection in accordance with 2015 IBC 1704 provide a statement of special inspections. (2015 IBC 107) BY REVISIONSDATEDrawn: Title: Drawing No.:A.2.043/7/2018Plotted On:PROPOSEDENTRY/BASEMENT/GARAGELEVEL PLAN IF THE ABOVE DIMENSION DOESNOT MEASURE ONE INCH (1")EXACTLY, THIS DRAWING WILL HAVEBEEN ENLARGED OR REDUCED,AFFECTING ALL LABELED SCALES. 1" ACTUAL 8:28 AM1250 SNOWBUNNY LANE, TWO HARES UNIT AASPEN, COLORADOALTFELD RESIDENCEDOUG RAGER - ARCHITECT P.C.1780 Snowmass Creek Rd.Snowmass, Co. 81654(970) 927-1780 TEL/FAXJ.MC4'-6"4' C 4'-6"4'D 3'-6"2'-6"G3'-10"3'G3'-10"3'1028'6'Q1'-6"5'A7'-6"3'-2"1008'4'-6" B 7'-6"7'1117'-7"16'-2" 103 104 106107105 110 109 108 STK'G W/D 3'4'5'2'-6"2'-10"5'-7"1'-1 1/16"1'-9"100'-0" BDRM 99'-1" GARAGE 100'-0" FOYER 96'-0" BASEMENT/BEDROOM 2A.4.01 2A.4.01 1A.4.01 1A.4.01 DWN UP DWN CLST EXT'GCLST Q. STEAMSHWERW/BENCH &SLOT DRAINBELOW MIRRORED DOORS hanging large pivot entrydoor murphybed hidden safein cab. up king queen pony wall top+ 42" aff CONFIRM TOP OFWALL IS HIGHER THEN DOORHEAD FOR PRIVACY bench W/artwall above &storage below OPERABLECASEMENT OPERABLECASEMENT TROUGHSINK UP FULL HEIGHTLINENCLOSET existing hottub on grade existing hottub on grade CLOSE IN SPACEBELOW DECK FORGARDEN STORAGE move stairs unit b, no work proposed existingfireplaceto remain existingarea wellno change existingstairsnochange no changeto existingstairs relocate existinghot water heater togarage new wood stepsdown forsliding doorsto existinggrade3-6" risers &2-12" treads 20 MIN. FIRE RATEDDOOR BETWEENGARAGE ANDDWELLING UNIT bench withshoestoragebelow coathooks overbench Remove existingrailroad tiesand infill withconcrete noproposedexcavation up two risers ENTRY DOOR WITHOPAQUE DOOREXEMPTION PERSECTIONR402.3.4 OF THEIECC GARAGE#003 FOYER#001 MDRM#002 BEDROOM #3#004 BEDROOM #4#007 FAMILY RM#006 BATH #3#005 BATH #4#008 4A.4.014A.4.01 3A.4.013A.4.01 A A 2 2 1 1 3 3 4 4 5 5 7 7 6 6 B B C C D D E E F F E 3'-6"3' F 3'-6"5'1017'6' open risers atentry stairspace of walland runwindow acrosswall SCALE: 1/4" = 1'-0"1 PROPOSED ENTRY/BASEMENT/GARAGE LEVEL PLAN plan north jm permit 1/18/183/6/18permit v2jm You have removed the mechanical room. Provide information on allnew equipment including:-Description of all equipment, systems and sequence of operation.-Fuel types and combustion air requirements.-Location of all equipment; provide access and service space.-Location of all exterior intakes and exhausts with dimensions tointakes, openings, and property lines.Q1'-6" 5'1117'-7" 16'-2" 03 DWN hanging bench W/artwall above &storage below 20 MIN. FIRE RATEDDOOR BETWEENGARAGE ANDDWELLING UNIT bench withshoestoragebelow coathooks overbenchMDRM#002 4A.4.01 C D E Show the location of the electric panel.Adequate working space and equipment spacemust be provided and it may not be in a closet (2017 NEC110.26).ALTFELD RESIDENCE2A.4.01 ge pivot entrydoor existingoad tiesfill withete noposedvation o risers ENTRY DOOR WITHOPAQUE DOOREXEMPTION PERSECTIONR402.3.4 OF THEIECC 3A.4.01 A 7 B On the plans or window schedule, label each individual window that must be safety glazed (R308.4).1250 SNOWBUNNY LANE, ASPEN, COLOALTFELD RESDOUG RAGER - ARCHITECT P.C.1780 Snowmass Creek Rd.Snowmass, Co. 81654(970) 927-1780 TEL/FAX2A.4.01 48'6" 17' 4A.4.01 3A.4.01 STEAMSHOWER OM g en adj. shelvingw/laundry basketbelow iders OPERABLECASEMENT OPERABLECASEMENT OPERABLECASEMENT FIXED UNIT OPERABLECASEMENT bench W/artwall above &torage below BENCH add awningover garagedoors DWN EGRESS EGRESS EGRESS #2 B C D E7'-5 1/2"12'-8"5'-1021'27'2' window acrosswall Nochangetoexistingstairsdown tobasementlevel Provide stamped structural plans. If there are any itemsthat require special inspection in accordance with 2015IBC 1704 provide a statement of special inspections.(2015 IBC 107) see mecanical sheets m.2.01,m.2.02,m.2.03 see mechanical sheet m.2.01 with existing location no change added to the windoow schedule Doug Hayes said you located A.7.01 Page: 14 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: Balanced Whole House Ventilation Author: nickt Color: Provide a balanced whole house mechanical ventilation system complying with Ordinance 40, 2016. Show the location of all equipment and intakes and exhausts. Indicate the rate of air supplied and exhausted. Indicate method of operation and whether it is continuous or periodic. Show your calculations using this equation: Min vent rate = ((0.01 x floor area) + [7.5 x (#bedrooms + 1)]) x 0.75 Page: 14 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: Kitchen Hood Makeup Air Author: nickt Color: Provide interlocked makeup air if the kitchen hood exhaust rate is over 400 CFM. Describe how this will be accomplished and locate exhaust & intake. (2015 IMC 505.2) Page: 14 File Name: 12 - Altfeld Survey Architectural Engineering Revise elevations or window schedule to indicate window operation (fixed vs casement, etc) and to demonstrate compliance with emergency escape and rescue opening requirements of 2015 IRC R310. Page: 14 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: PlanCheck Author: nickt Color: Any operable windows less than 24” above finish floor and more than 72” above exterior grade must have window fall protection devices complying with ASTM F2090. Note this requirement at each location and provide a spec. (2015 IRC R312.2) Page: 15 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: PlanCheck Author: nickt Color: Provide snow stops at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities, emergency escape and rescue opening window wells, or adjacent properties per Ordinance 40, 2016.1250 SNOWBUNNY LANE, TWO HARES UNIT AASPEN, COLORADOALTFELD RESIDENCEAGER - ARCHITECT P.C.ass Creek Rd.Snowmass, Co. 81654(970) 927-1780 TEL/FAXEX'G DRYEREX'G WSHR REFR/FRZ RANGEEX'G DRYER 1A.6.01 2A.4.01 8'-1/2"8' 36'-6"48'1'-6"1'-6" 17'2'-2" UPPER BEDROOMS ING/KITCHEN 4A.4.01 3A.4.01 A DWN STEAMSHOWER DW ADD AC TOBEDROOM den safen cab. rth king queen adj. shelvingw/laundry basketbelow mirrored closet sliders TRA S H COM P A C T O R OPERABLECASEMENT OPERABLECASEMENT OPERABLECASEMENT FIXED UNIT OPERABLECASEMENTPREP SINKbench W/artwall above &storage below BENCH move stairlocation up toliving add awningover garagedoors DWN EGRESS EGRESS EGRESS KITCHEN#102 BEDRM #2#106 BATH #2#107 MSTR. CLST DRY A 4 5 76 B C D E7'-5 1/2"12'-8"5'-10 1/2"1'21'27'2' open risers atentry stairspace of walland runwindow acrosswall top THREErisers closed Nochangetoexistingstairsdown tobasementlevel Provide a balanced whole house mechanical ventilation system complying withOrdinance 40, 2016. Show the location of all equipment and intakes andexhausts. Indicate the rate of air supplied and exhausted. Indicate method ofoperation and whether it is continuous or periodic. Show your calculationsusing this equation:Min vent rate = ((0.01 x floor area) + [7.5 x (#bedrooms + 1)]) x 0.75 1250 SNOWBUNNY LANE, TWO HARESASPEN, COLORADOALTFELD RESIDENCEER - ARCHITECT P.C.reek Rd.Snowmass, Co. 81654(970) 927-1780 TEL/FAX2A.4.01 48'17' 4A.4.01 3A.4.01 adj. shelvingw/laundry basketbelow OPERABLECASEMENT OPERABLECASEMENT OPERABLECASEMENT FIXED UNIT OPERABLECASEMENT t&w add awningover garagedoors A B C D7'-5 1/2"12'-8"5'-10 1/2"1'21'27'2' en risers atntry stairace of walland runndow acrosswall Nochangetoexistingstairsdown tobasementlevel Provide interlocked makeup air if the kitchen hood exhaust rate is over 400 CFM. Describe how thiswill be accomplished and locate exhaust & intake.(2015 IMC 505.2) 1A.4 4A.4.01 TAKECLOSETSTOCEILING OPERABLECASEMENT OPERABLECASEMENT king existing gasfireplaceto remain EGRESS MSTR. BEDRM #103 21 3 E F 21'17' confirm 2x6wall forpocket door convert existingdeck area to 3/12roof metal class Aroof Revise elevations or windowschedule to indicate window operation (fixed vs casement, etc) and to demonstrate compliance with emergencyescape and rescue opening requirements of 2015 IRC R310. 4A.4.01 OPERABLECASEMENT OPERABLECASEMENT exisfirto EGRESS MS 21 E F 21'convert existingdeck area to 3/12roof metal class Aroof Any operable windows lessthan 24” above finish floorand more than 72” above exterior grade must have window fall protectiondevices complying with ASTM F2090. Note this requirement at each locationand provide a spec. (2015IRC R312.2)2.25/12 3/12 CHANGEROOF PITCHTO 1/4" IN12" EXTENDOVERHANG A B C D Provide snow stops at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities, emergency escapeand rescue opening window wells, or adjacent properties per Ordinance 40, 2016. 3-6-18 Drawing Set.pdf Subject: PlanCheck Author: nickt Color: good to go see mechanical sheets see mechanincal sheet noted hood is not to exceed 400cfm revised on elevations and on window schedule noted on window schedule window hardware will limit to max of 4" opening added to roof plan A.7.01 file name: 12 A.2.06 file 12: A.3.01 & A.3.01 & A.7.01 Page: 22 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: Air sealing general note Author: nickt Color: Indicate how you will accomplish the air sealing requirements of 2015 IECC table R402.4.1.1 using notes and details. Indicate the continuity of the air barrier and where it is located throughout the building. Note locations that require caulking, sealing, taping, etc. Note which components are included in the air barrier such as spray foam, gypsum, housewrap, and/or exterior insulation. You may have all of the above but you need to pick one continuous barrier and stick to it. It needs to follow the thermal barrier. The better detail you provide, the easier it will be for the contractor and inspector to be successful. This is a new 2015 code requirement in lieu of a blower door test. Page: 22 File Name: 12 - Altfeld Survey Architectural Engineering 3-6-18 Drawing Set.pdf Subject: Class A Roof Author: nickt Color: Provide documentation that the roof assembly is Class A. This is typically either an ESR or UL report. Revise you roof detail to match the report. An underlayment is often required. (Ordinance 40, 2016) Page: 3 File Name: 15 - Altfeld Special Inspection and Testing Agreement-2018.pdf Subject: PlanCheck Author: nickt Color: Complete all required signatures for the special inspection agreement. 15 - Altfeld Special Inspection and Testing Agreement-2018.pdf (1) HARDY BOARDSIDING COLOR ANDSTYLE TO BESELECTED zip r-sheathingcontinuous r6insulationsysteminstall permanuf. specs THIN STONEVENEER TO BESELECTED TOP OFSTONE VARIESSEE ELEVATIONS EXISTING 1/2"SHEATHING &HOUSEWRAP NO CHANGE TOGRADE EXISTINGFOUNDATION TOREMAIN ADD 1/2"GREENBOARD 6"ABOVE GRADEBEHIND STONE ANDOVER A LAYER OF1 1/2" RIDGED FOAMBURIED TO TOP OFFOOTER 12"1/4" rafters REFER TOSTRUCTURAL DRAWINGSfor sizing WITH 6"closed cellSPRAYFOAM INSULATIONr36 AND R19 BATTStotal r55 new roof assembly @ livingroom existing floor assembly no change existing floorassembly no change existing interior finishes no change flash top of thinstone existing exterior wallno changes exterior window and doorcasing detail zip r-sheathingcontinuous r6insulation systeminstall per manuf.specs existing exterior wallwith 1/2" sheathinginterior details andfinishes to remain new hardy board siding exter SCALE: 1" = 1'-0"2 WALL SECTION & DETAIL 2015 international energy conservation code Indicate how you will accomplish the air sealingrequirements of 2015 IECC table R402.4.1.1 using notesand details. Indicate the continuity of the air barrier and where it is located throughout the building. Note locationsthat require caulking, sealing, taping, etc. Note whichcomponents are included in the air barrier such as sprayfoam, gypsum, housewrap, and/or exterior insulation.You may have all of the above but you need to pick onecontinuous barrier and stick to it. It needs to follow thethermal barrier. The better detail you provide, the easierit will be for the contractor and inspector to be successful.This is a new 2015 code requirement in lieu of a blowerdoor test. SOFFIT.FASCIA TOMATCH EXISTINGDETAILS NEW 2x10RAFTERS REFERTO STRUCTURALDRAWINGS FORSPACING ANDATTACHMENTDETAILSsprayfoamentire cavityr64 NEW CLASS AMETAL ROOF TOBE SELECTEDOVER WR GRACEICE ANDWATERSHEILD existing floor assembly no chan flash connectionpoint metal drip matchexisting Provide documentation that the roof assembly is Class A. This is typically eitheran ESR or UL report. Revise you roofdetail to match the report. An underlayment is often required. (Ordinance 40, 2016) 3 2. Approval of fabricator. Approval shall be based upon review of the fabricator’s writtenprocedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. G. Building Department Responsibilities 1. Approve special-inspection program. The building department shall approve all special inspectors and special-inspection requirements. 2. Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. His\Her approval, in addition to that of the special inspector, must be obtained prior to placement of concrete, covering of structural steel, or other similar materials. 3. Review inspection reports. The building official should review special-inspection progress and final reports. 4. Perform final inspection. The building official should perform the final inspection and approval for a project [IBC Sec. 109.3.1] after the final special-inspection report has been reviewed and approved. Project Address: __________________________________ Permit Number:______________________ ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: __________________________ Owner: __________________________ Engineer/ Architect: __________________________ Contractor: __________________________ Approved Fabricator: __________________________ Inspected Fabricator: __________________________ (circle one) CITY OF ASPEN PITKIN COUNTY: Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Printed Name: __________________________ Printed Name __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Date: __________________________ Date __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Date: __________________________Complete all requiredsignatures for thespecial inspectionagreement. notes added to wall section attached cutsheets and note added to wall section see attached signature block page file name: 15a A.6.01 & file name: 14 file name: 12 A.6.01