Loading...
HomeMy WebLinkAboutFile Documents.1250 Snowbunny Ln.0040.2018 (16).ARBKKnow what'sbelow.before you dig.CallRBNot to ScaleAProperty Line WATER SERVICE CONNECTIONWATER SERVICE PROFILEABSnowbunny Ln.EPETNOTES:1. WATER SERVICE LINE TO BE CONSTRUCTED PER SPECIFICATIONS OF CITY OF ASPEN.2. CONTRACTOR RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS AND/ORAPPROVALS PRIOR TO BEGINNING CONSTRUCTION.3. TRAFFIC CONTROL TO BE PER MUTCD AND APPLICABLE SPECIFICATIONS.4. EXISTING UTILITY LOCATIONS ARE ESTIMATED. CONTRACTOR RESPONSIBLE TOCOORDINATE LOCATING ALL UTILITIES, POTHOLING IF NECESSARY. CONTRACTORRESPONSIBLE FOR ANY AND ALL DAMAGE TO UTILITY LINES.5. CONTRACTOR TO COORDINATE WITH GEOTECHNICAL ENGINEER FORRECOMMENDATIONS CONCERNING TRENCH STABILITY, SAFETY, AND SHORING.6. MAINTAIN 18" SEPARATION BETWEEN ANY UTILITIES THAT MAY NEED TO BECROSSED. IF 18" CAN NOT BE MAINTAINED NOTIFY ENGINEER FOR ALTERNATIVES.ΔΔΔSnowbunny Ln.ph 970.945.5544 fx 970.945.5558 www.mountaincross-eng.com826 1/2 Grand Avenue Glenwood Springs, CO 81601ENGINEERING, INC.Civil and Environmental Consulting and DesignMOUNTAIN CROSSC11250 Snowbunny LaneWater ServiceHayes ConstructionABAReviewed by Engineering10/09/2018 9:21:25 AM"It should be known that this review shall notrelieve the applicant of their responsibility tocomply with the requirements of the City ofAspen. The review and approval by the City isoffered only to assist the applicant'sunderstanding of the applicable Engineeringrequirements." The issuance of a permit basedon construction documents and other data shallnot prevent the City of Aspen from requiring thecorrection of errors in the constructiondocuments and other data.