HomeMy WebLinkAboutFile Documents.1230 Snowbunny Ln.0116.2019 (5).ARBKEngineering1_0116.2019.ARBK_1230 Snowbunny
Page: C2 SITE PLAN
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
A landscape plan was not
included in the submittal. What is
proposed to be planted in the
rain gardens?
1230 Snowbunny CO Civils.pdf (13)
Page: C2 SITE PLAN
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Is it not recommended to have
the water service line routed
below an infiltration BMP
system.
Page: C2 SITE PLAN
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Is utility work proposed?
If a new water service is
proposed include the following:
- line size and material.
- new tap shall be 18" from
existing/other fittings.
- ensure 10' horizontal
separation from sanitary and 18"
vertical separation in sanitary
crossing.
Page: C2 SITE PLAN
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Maximum driveway width
permitted for a two car garage is
18' and 10' for single car garage.
Revise to meet standards.
Page: C4 GRADING & DRAINAGE
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Has a geotech signed off on this
design? URMP calls out that
there to be a liner for the first 10'
from building foundations.
A landscape plan
was not included in
the submittal. What is
proposed to be
planted in the rain
gardens?
Is it not
recommended to
have the water
service line routed
below an infiltration
BMP system.
Is utility workproposed?
If a new water
service is proposed
include the following: - line size and
material.
- new tap shall be 18"from existing/other
fittings.
- ensure 10'
horizontal separation
from sanitary and 18"vertical separation in
sanitary crossing.
Maximum driveway
width permitted for a
two car garage is 18'
and 10' for single car
garage. Revise to
meet standards.
Has a geotech
signed off on this
design? URMP calls
out that there to be a
liner for the first 10'
from building
foundations.
Page: C4 GRADING & DRAINAGE
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Provide adequate grading
information with spot elevations
or contour lines for construction.
It is not clearly shown on this
plan how drainage is routed to
the BMPs.
Page: C4 GRADING & DRAINAGE
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Show grade of the driveway.
Depending on slopes, a curb
perimeter may be desired to
prevent shifting of the pavers.
Page: C4 GRADING & DRAINAGE
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Show more grading for the berm,
include flow line for clarification.
Page: C4 GRADING & DRAINAGE
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Show riprap at outlet. The rip rap
will prevent erosion, will it
function as a point source
discharge or will it spread out?
Page: C5 DETAIL
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Call out side slopes. Max
allowable is 3:1.
Provide adequate
grading
information with
spot elevations or
contour lines for
construction. It is
not clearly shown
on this plan how
drainage is routed
to the BMPs.
Show grade of thedriveway. Depending
on slopes, a curb
perimeter may be
desired to preventshifting of the pavers.
Show more grading
for the berm, include
flow line for
clarification.
Show riprap at outlet.
The rip rap will
prevent erosion, will it
function as a point
source discharge or
will it spread out?
Call out side slopes.
Max allowable is 3:1.
Page: C5 DETAIL
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Slopes called out for the pipe are
not consistent. Revise for
consistency.
Page: C5 DETAIL
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
URMP approved filter media is
70% sand, 30% combo off
topsoil and largo organic matter.
Page: SURVEY
Author: pjm
File Name: 1230 Snowbunny CO Civils.pdf
Survey must be verified within
last 12 months.
Page: [1] VR-Drainage-Drainage
Author: pjm
File Name: Valentine-Drainage-Report.pdf
If the modified FFA method to
release at histroic rates is
proposed, existing conditions is
not required for the analysis.
Show historic grading and flow
patterns.
Valentine-Drainage-Report.pdf (10)
Page: 6
Author: pjm
File Name: Valentine-Drainage-Report.pdf
APP B shows no infiltration
pavers only per the legend,
clarify where pervious pavers
are used.
Slopes called out forthe pipe are notconsistent. Revise forconsistency.
URMP approved filtermedia is 70% sand,30% combo offtopsoil and largoorganic matter.
Survey must be
verified within last 12
months.
Existing Drainage
Basins
PE:QC:
2018-458
JK
4.10.19
RB
VR-Drainage
AE
APP A Project Mil
If the modified FFA
method to release at
histroic rates is
proposed, existing
conditions is not
required for the
analysis. Show
historic grading and
flow patterns.
Basin A encompasses the south and east side of the site with a portion that touches the
north-east side of the house, generally between the residence and the ditch to the east.
Sub-basins 1, 2, 3 and 4 comprise Basin A. This basin is 9674 square feet of which 2779
square feet is impervious. Tree canopy credit is calculated per section 8.4.1 of the COA
URMP, a detailed calculation is shown in Appendix C. Grass buffers, pervious pavers, and a
rain garden will treat the remaining WQCV. See Appendix B for the proposed location of
BMPs in this basin.
Table 2
Basin A (Sub-basins 1,2,3, & 4)
Basin Area (sf) 9674
% Impervious 29%
Required WQCV (cf) 50.4
Credits
Pervious Paver Area (sf) 90
Grass Buffer Area (sf) 3275
Tree Canopy Credit Area (sf) 215
Rain Garden Volume (cf) 9.0
Results
Effective Impervious Area (sf) -891
Effective % Imperviousness -9.2%
Available WQCV (cf) 80.6
Surplus WQCV (cf) 30.2
Sub-basin 1
Sub-basin 1 is located on the south side of the property and has a total and impervious area
of 2616 and 685 square feet, respectively. This corresponds to 26% impervious area for the
sub-basin. This area is mostly a grassed area containing trees with the south portion of the
roof included. The existing site will be impacted by the addition of a living space over the
garage, a second story deck, and a covered patio. Storm water will be routed from the roof
to grass buffer via roof drainage and gutter downspouts then east and ultimately north by
existing vegetated topography to the proposed detention at the north-east corner of the site.
Grass buffer area is at or above a 1:1 ratio to impervious area, after applying the tree
APP B shows no
infiltration pavers
only per the legend,
clarify where
pervious pavers are
used.
Page: 8
Author: pjm
File Name: Valentine-Drainage-Report.pdf
It is my understanding that no
runoff is being routed to the
pavers for treatment other than
what falls directly on them, is
that correct?
Page: 10
Author: pjm
File Name: Valentine-Drainage-Report.pdf
Runoff shall be released at
historic rate in a historic manner,
revise to not have point
discharge.
Page: 15
Author: pjm
File Name: Valentine-Drainage-Report.pdf
Provide a table with grass buffer
areas to verify 1:1 ratio.
Page: 15
Author: pjm
File Name: Valentine-Drainage-Report.pdf
This information shall be
provided on the civil sheets as
well. This sheet will not be onsite
during construction. Ensure all
pertinent information regarding
construction, grading and
drainage is provided on the civil
sheets.
Page: 18
Author: pjm
File Name: Valentine-Drainage-Report.pdf
Provide peak flow calcs for
historic site in order to use
modified FAA method for
detention per requirements of a
major engineering review
checklist.
way and garage and routed by 4” PVC
ge. All other storm water in sub-basin 6
o pervious pavers and eventually grass
to impervious area, after applying the
asin contains a surplus of 505 square
ted runoff from the driveway that is
tion 3.2.3).
ng the rational method as explained in
as explained in Section 2 of the URMP.
It is my understanding that
no runoff is being routed to
the pavers for treatment
other than what falls directly
on them, is that correct?
1230 Snowbunny Lane, Aspen, Colorado April 17, 2019
Rain gardens were installed in both basins to treat the remaining required WQCV. Locations
and WQCV calculations for the rain gardens can be found in Appendix B and C,
respectively.
6.0 Detention Methodology
The required detention volume was calculated using the Rational Volume Method for
Detention Volume (Watershed <90acres) as outlined in Chapter 5 the URMP. Calculations
of the required detention volume can be seen in Appendix E. After consideration of the site
and the importance of minimizing disturbance to the existing lawn, localized detention is
sized and located based on existing drainage paths. The most effective approach that
remains aesthetically pleasing is to build berms around the downstream discharge points of
each basin. The detention areas will rely on berms and the existing grading to hold the
developed runoff from the site. The detention areas will incorporate an outlet pipe that will
release runoff at, or below, historic rates.
Using positive drainage away from the house and preserving as much healthy vegetation as
possible, the detention areas only needed berms built up on two sides to store runoff.
Utilizing quantities calculated from the Rational Volume Method for Detention Volume, the
berms would only need to be built up 6” from the existing ground. This approach will satisfy
not only the detention requirements but also be minimally invasive to the existing
landscaping.
Outfall discharge of the detention area was calculated using Equation 5-10 of the URMP
and can be seen in Appendix F. The outlet pipe was sized to drain the detention area at the
historic 10-year flow rate, while storing the 100-year storm. This approach was used to avoid
multiple stage discharge, thus eliminating a larger impact to the site.
7.0 Maintenance
Runoff shall be
released at historic
rate in a historic
manner, revise to not
have point discharge.
Provide a table with
grass buffer areas to
verify 1:1 ratio.
3 (A)
4 (A)
Graphic Scale
In Feet: 1" = 6'
0 3 6 12
Line Architectsnowbunny Lane118 West Sixth Street, Suite 200Glenwood Springs, CO 81601970.945.1004 www.sgm-inc.com This information shallbe provided on thecivil sheets as well.This sheet will not beonsite duringconstruction. Ensureall pertinentinformation regardingconstruction, gradingand drainage isprovided on the civilsheets.
1230 Snowbunny Lane, Aspen, Colorado
Peak Flow Calculations for Project Site – Proposed Condit
Historical Flow Calculations Seen in Appendix E with Dete
· Watershed Area, 4)RJ1* )v* = = .
· Percent Imperviousness, B
B =
4wxy4z{z|}× 1
B =
2779 HCM
9674 HCM
= ~.~ %
· Maximum Watershed Length, = 0 ,routing on property from SW
· Watershed Slope, 2o79:CB?> :C E?GCℎ 7>A −
Provide peak flow
calcs for historic site
in order to use
modified FAA method
for detention per
requirements of a
major engineering
review checklist.
Page: 18
Author: pjm
File Name: Valentine-Drainage-Report.pdf
Where is design point 1? Clarify
this is basin A.
Page: 27
Author: pjm
File Name: Valentine-Drainage-Report.pdf
How is the headwater depth
provided? It appears that the
pipe is flush with the ground in
the detail.
Page: 27
Author: pjm
File Name: Valentine-Drainage-Report.pdf
Release rate shall be equal to or
less than 100 year event, not 10
year event.
Where are historic rates
calculated in this report?
April 17, 2019
Appendix D
Conditions Design Point 1
h Detention Calculations
.
xy
{z|}× 100
79 HCM
74 HCM × 100
.~ %
Where is design point
1? Clarify this is basin
A.
C₀g H₀A₀ - DP1 D₀ - DP1 A₀ - DP1 D₀ - DP2 Q - DP1 Q - DP2
-ft/sec²ft ft²in.ft²in.cfs cfs
0.6 32.2 0.33 0.037 2.6 0.018 1.8 0.092 0.039
*** Use Sch
*** Use Sch
Discharge
Coefficient
Headwater
Depth
Gravitational
Constant
Orifice
Area
Orifice
Area
Orifice
Diameter
Orifice
Diameter
Actual
Outflow
Actual
Outflow
How is the headwater
depth provided? It
appears that the pipe
is flush with the
ground in the detail.
Q - DP1 Q - DP2 C₀g H₀A₀ - DP1 D₀ - DP1 A₀ - DP1 D₀ - DP2 Q - DP1 Q - D
cfs cfs -ft/sec²ft ft²in.ft²in.cfs cfs
0.103 0.051 0.6 32.2 0.33 0.037 2.6 0.018 1.8 0.092 0
Historic 10 year Flow
Rate (Q)
Discharge
Coefficient
Headwater
Depth
Gravitational
Constant
Orifice
Area
Orifice
Area
Orifice
Diameter
Orifice
Diameter
Actual
Outflow
Actu
Outfl
Release rate shall be
equal to or less than
100 year event, not
10 year event.
Where are historic
rates calculated in
this report?