Loading...
HomeMy WebLinkAboutFile Documents.1230 Snowbunny Ln.0116.2019 (8).ARBKEngineering3_0166.2018.ARBK_1230 Snowbunny Page: [5] C2 Site Plan Author: pjm File Name: 2019-08-13-Valentine Residence.pdf Call out vertical distance at this crossing. Verify the sanitary service will remain as a new location is not shown on this plan. 2019-08-13-Valentine Residence.pdf (3) Page: [7] C4 Grading & Drainage Author: pjm File Name: 2019-08-13-Valentine Residence.pdf Drywells introduce an air source below the typical freeze depth in the soils. It is not recommended to have the water service line within 7' horizontally of the drywell to prevent freezing of the line. Call out water service line to be located 7' from drywell location or propose new alignment. Page: [7] C4 Grading & Drainage Author: pjm File Name: 2019-08-13-Valentine Residence.pdf Per section 6.0 of the drainage report, this rain garden does not have an overflow path other than infiltration therefore full detention will be required for this basin. Releasing at historic rates requires an outlet from the system, infiltration only systems require full detention. The sizing calculation for full detention can be found in the drywell sizing section of the URMP. Call out vertical distance at this crossing. Verify the sanitary service will remain as a new location is not shown on this plan. Drywells introduce an air source below the typical freeze depth in the soils. It is not recommended to have the water service line within 7' horizontally of the drywell to prevent freezing of the line. Call out water service line to be located 7' from drywell location or propose new alignment. Per section 6.0 of the drainage report, this rain garden does not have an overflow path other than infiltration therefore full detention will be required for this basin. Releasing at historic rates requires an outlet from the system, infiltration only systems require full detention. The sizing calculation for full detention can be found in the drywell sizing section of the URMP. Vertical separation requirement has been listed on site plan - note at top of page reiterates not only the vertical but also the horizontal distance as well. Sanitary service to remain Water line moved to north of the existing line and is more than 7' horizontally from the drywell Drainage report updated to explain the detention overflow path with calculation in appendix