HomeMy WebLinkAboutFile Documents.122 W Main St.0032.2018 (17).ACBKEng Comments 122 West Main Rd 2 9-25-18
Page: 4
Author: justinf
File Name: Permit Drawing Set_Civil.122 West
Main.2018.4_Addendum 1.pdf
Please add note: Valley pan to have reinforcement
and be pouring with CDOT Class E (high early) to
restore alley function as quickly as possible.
Contractor should be prepared to replace entire
valley crossing.
Permit Drawing Set_Civil.122 West Main.2018.4_Addendum 1.pdf (4)
Page: 4
Author: justinf
File Name: Permit Drawing Set_Civil.122 West
Main.2018.4_Addendum 1.pdf
Add note that project team, CenturyLink and City
of Aspen must coordinate location of Fiber Optic
line and location prior to 122 West Main project
placing conduit in 2nd Street.
Page: 4
Author: justinf
File Name: Permit Drawing Set_Civil.122 West
Main.2018.4_Addendum 1.pdf
Proper restraint of water service not shown in civil,
plumbing or structural. Please detail proper
restraint following CoA Water Standards.
Page: 4
Author: justinf
File Name: Permit Drawing Set_Civil.122 West
Main.2018.4_Addendum 1.pdf
New Electrical Easement must be provided prior to
approval of permit.
Please add note:Valley pan to have
reinforcement and bepouring with CDOT
Class E (high early)
to restore alleyfunction as quickly as
possible. Contractorshould be prepared to
replace entire valley
crossing.
Add note that project
team, CenturyLinkand City of Aspenmust coordinate
location of Fiber Opticline and location priorto 122 West Main
project placingconduit in 2nd Street.
S S
Proper restraint of
water service notshown in civil,
plumbing orstructural. Please
detail proper restraintfollowing CoA Water
Standards.
New Electrical
Easement must be
provided prior to
approval of permit.
SE: See revised sheet C-4.0 for updated note
SE: See revised sheet C-4.0 for updated note
SE: The update CX reflects the approved electric easement. SE understands the properties have
singed the necessary agreement document and were submitted to Andrea Bryan on 10/19/18. The
draft language was previously reviewed approved by COA Legal on 8/9/18. Upon Andrea's final
review, the Client's attorney will submit a signed and executed agreement for City's recordation
SE: See revised sheet C-4.0 for restraint detail
GSA: THE SIGNED + EXECUTED AGREEMENT IS INCLUDED IN THIS
SUBMITTAL.
11/15/18
12/03/2018