Loading...
HomeMy WebLinkAboutFile Documents.122 W Main St.0032.2018 (17).ACBKEng Comments 122 West Main Rd 2 9-25-18 Page: 4 Author: justinf File Name: Permit Drawing Set_Civil.122 West Main.2018.4_Addendum 1.pdf Please add note: Valley pan to have reinforcement and be pouring with CDOT Class E (high early) to restore alley function as quickly as possible. Contractor should be prepared to replace entire valley crossing. Permit Drawing Set_Civil.122 West Main.2018.4_Addendum 1.pdf (4) Page: 4 Author: justinf File Name: Permit Drawing Set_Civil.122 West Main.2018.4_Addendum 1.pdf Add note that project team, CenturyLink and City of Aspen must coordinate location of Fiber Optic line and location prior to 122 West Main project placing conduit in 2nd Street. Page: 4 Author: justinf File Name: Permit Drawing Set_Civil.122 West Main.2018.4_Addendum 1.pdf Proper restraint of water service not shown in civil, plumbing or structural. Please detail proper restraint following CoA Water Standards. Page: 4 Author: justinf File Name: Permit Drawing Set_Civil.122 West Main.2018.4_Addendum 1.pdf New Electrical Easement must be provided prior to approval of permit. Please add note:Valley pan to have reinforcement and bepouring with CDOT Class E (high early) to restore alleyfunction as quickly as possible. Contractorshould be prepared to replace entire valley crossing. Add note that project team, CenturyLinkand City of Aspenmust coordinate location of Fiber Opticline and location priorto 122 West Main project placingconduit in 2nd Street. S S Proper restraint of water service notshown in civil, plumbing orstructural. Please detail proper restraintfollowing CoA Water Standards. New Electrical Easement must be provided prior to approval of permit. SE: See revised sheet C-4.0 for updated note SE: See revised sheet C-4.0 for updated note SE: The update CX reflects the approved electric easement. SE understands the properties have singed the necessary agreement document and were submitted to Andrea Bryan on 10/19/18. The draft language was previously reviewed approved by COA Legal on 8/9/18. Upon Andrea's final review, the Client's attorney will submit a signed and executed agreement for City's recordation SE: See revised sheet C-4.0 for restraint detail GSA: THE SIGNED + EXECUTED AGREEMENT IS INCLUDED IN THIS SUBMITTAL. 11/15/18 12/03/2018