122 west main / memo
Date: February 27, 2019
Revised:
To: City of Aspen Bldg. Dpt.
From: Gilbert Sanchez, GSA
items
Change Order #1 for 122 West Main, Permit #0032.2018 ACBK, includes the following:
ARCHITECTURAL DRAWINGS-
A2.0 dated 2/8/19
Walls + glazing have been eliminated between Office 012, Office 013 + Corridor 005.
Plan Revisions at Teller Area
HVAC Condensing Unit located in Trash Enclosure
A2.1 dated 2/8/19
Substitute a “G” window for a “D1” window in Bath 304
Add wall at duct chase from Attic Mechanical to Loft
A3.0 dated 2/8/19
South Elevation is revised to reflect HPC approved revision to sliding glass door 202/A.
West Elevation is revised to reflect HPC approved window revisions at the Teller Area on the Main Floor.
East Elevation is revised to reflect HPC approved substitution of a “G” window for a “D1” window at Bath
304.
A4.0 dated 2/8/19
Revisions to extent of fire rated floor/ceiling assembly between Second Floor + Loft Level as approved by
the City of Aspen Building Department are indicated in Section 4.
Modifications to the existing elevator shaft assembly at floor joint spaces as approved by the City of
Aspen Building Department are noted in Section 4.
A4.1 dated 2/8/18
Drawing 1/A4.1 has been revised to reflect the actual exterior wall assembly as discovered post
demolition.
ELECTRICAL DRAWINGS-
E-002 dated 2/15/19
Revised Schedules to reflect electrical + lighting changes shown on sheets E-100, E-101, E-200 + E-201.
E-003 dated 2/15/19
Revised Schedules to reflect electrical + lighting changes shown on sheets E-100, E-101, E-200 + E-201.
E-100 dated 2/15/19
Electrical changes to accommodate revisions at Office 12, Office 13 and Corridor 005.
E-101 dated 2/15/19
Electrical changes to accommodate revisions at Tellers Area.
E-200 dated 2/15/19
Lighting changes to accommodate revisions at Office 12, Office 13 and Corridor 005.
E-201 dated 2/15/19
Lighting changes to accommodate revisions at Tellers Area and Porch 112.
03/05/2019
No lighting increase to E100, E101, E200 or E201 (TF)
03/22/2019
tonyf
gilbert sanchez / architect / 300 south spring street #202 / aspen, co / 81611 / 970.948.0597 / grsanchezaia@gmail.com
MECHANICAL DRAWINGS-
M-100 dated 2/8/19
Revised mechanical layout to accommodate plan revisions at Office 012, Office 013 and Corridor 013.
Revised heater in Toilet 004.
M-101 dated 2/8/19
Added auxiliary heater in Offices 109 and 110.
Revised heater in Toilet 105.
Revised heaters in Tellers 106.
M-300 dated 2/8/19
Revisions to notes regarding auxiliary heaters.