Loading...
HomeMy WebLinkAboutFile Documents.122 W Main St.0013.2019 (3).ACBKgilbert sanchez architect / 300 south spring street #202 / aspen, co / 81611 / 970.948.0597 / grsanchezaia@gmail.com 122 west main / memo Date: February 27, 2019 Revised: To: City of Aspen Bldg. Dpt. From: Gilbert Sanchez, GSA items Change Order #1 for 122 West Main, Permit #0032.2018 ACBK, includes the following: ARCHITECTURAL DRAWINGS- A2.0 dated 2/8/19  Walls + glazing have been eliminated between Office 012, Office 013 + Corridor 005.  Plan Revisions at Teller Area  HVAC Condensing Unit located in Trash Enclosure A2.1 dated 2/8/19  Substitute a “G” window for a “D1” window in Bath 304  Add wall at duct chase from Attic Mechanical to Loft A3.0 dated 2/8/19  South Elevation is revised to reflect HPC approved revision to sliding glass door 202/A.  West Elevation is revised to reflect HPC approved window revisions at the Teller Area on the Main Floor.  East Elevation is revised to reflect HPC approved substitution of a “G” window for a “D1” window at Bath 304. A4.0 dated 2/8/19  Revisions to extent of fire rated floor/ceiling assembly between Second Floor + Loft Level as approved by the City of Aspen Building Department are indicated in Section 4.  Modifications to the existing elevator shaft assembly at floor joint spaces as approved by the City of  Aspen Building Department are noted in Section 4. A4.1 dated 2/8/18  Drawing 1/A4.1 has been revised to reflect the actual exterior wall assembly as discovered post demolition. ELECTRICAL DRAWINGS- E-002 dated 2/15/19  Revised Schedules to reflect electrical + lighting changes shown on sheets E-100, E-101, E-200 + E-201. E-003 dated 2/15/19  Revised Schedules to reflect electrical + lighting changes shown on sheets E-100, E-101, E-200 + E-201. E-100 dated 2/15/19  Electrical changes to accommodate revisions at Office 12, Office 13 and Corridor 005. E-101 dated 2/15/19  Electrical changes to accommodate revisions at Tellers Area. E-200 dated 2/15/19  Lighting changes to accommodate revisions at Office 12, Office 13 and Corridor 005. E-201 dated 2/15/19  Lighting changes to accommodate revisions at Tellers Area and Porch 112. 03/05/2019 No lighting increase to E100, E101, E200 or E201 (TF) 03/22/2019 tonyf gilbert sanchez / architect / 300 south spring street #202 / aspen, co / 81611 / 970.948.0597 / grsanchezaia@gmail.com MECHANICAL DRAWINGS- M-100 dated 2/8/19  Revised mechanical layout to accommodate plan revisions at Office 012, Office 013 and Corridor 013.  Revised heater in Toilet 004. M-101 dated 2/8/19  Added auxiliary heater in Offices 109 and 110.  Revised heater in Toilet 105.  Revised heaters in Tellers 106. M-300 dated 2/8/19  Revisions to notes regarding auxiliary heaters. 03/05/2019 03/22/2019 tonyf