HomeMy WebLinkAboutFile Documents.122 W Main St.0013.2019 (6).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 046 Timberline Bank Renovation - Aspen FCI Constructors, Inc. - GJProject # 10-18-006 122 West Main Street, Aspen, CO 81611 Tel: tbd Fax: 970-434-7583 RFI #: 046 Date Created: 1/16/2019 Author Company Authored ByAnswer Company Answered By GSA Gilbert Sanchez FCI Constructors, Inc. - GJ Trevor Courkamp 300 South Spring Street #202 Aspen, CO 81611 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category Request for InformationArchitecturalD1 Window Sizing at Dormer Company Name Contact Name Copies NotesCc: Question Date Required: 1/23/2019 Please reference sheet A3.0 and A5.1 The D1 windows that are to be installed in the dormer area are too tall to work with the existing roofline. There is not enough room between the D1 window and the roof line for a header to be installed. This clearance issue affects two D1 windows in the dormer area. Please note that FCI is proceeding with exterior framing of the dormer without a window until a alternate window is selected. Suggestion Answer Date Answered: Prolog Manager Printed on: 1/16/2019 FCI_Integration Page 1 PER FCI + GSA REVIEW IN THE FIELD, D1 WINDOWS SHALL BE ACCOMMODATED BY THE FOLLOWING FRAMING MODIFICATIONS AS APPROVED BY JIM ROMEO: 1. INSTALL 3-1/2" LVL HEADERS 2. CUT THE LOWEST 2X PLATE IN ADDITION, THE D1 DORMER WINDOWS (DOUBLE-HUNG) AND THE STORAGE AREA WINDOWS (CASEMENTS) SHALL BE SWAPPED. THE D1 DOUBLE-HUNGS TO BE RELOCATED TO THE STORAGE AREA WILL REQUIRE GOVERNORS TO RESTRICT THE OPENING. PROVIDE HEAT TAPE ON EXISTING ROOF BELOW THE NEW D1 DORMER WINDOW ON TEH WEST SIDE ONLY. GSA 1/29/19 REVISED 1/31/19 RESPONSE REVISED 1/31/19