HomeMy WebLinkAboutFile Documents.201 N Mill St.0019.2019 (2).ACBKSilver Town Structures 307N AABC Aspen, CO 81611
Mar 13, 2019
City of Aspen Building Department
Aspen, CO 81611
RE:
City of Aspen
Parking Department buildout
355 N Mill St
Aspen, CO 81611
To Whom it may concern:
Thank you for choosing Brutsaert Engineering. I am writing this letter to confirm my
involvement with this project as a structural engineer. I reviewed the proposed remodel drawings
by bgDesign dated 3/8/19. I also inspected a small portion of the lower level with Evan Pletcher
from The City of Aspen.
The structure is a four story multi use building in a finished condition. The building was
first constructed in 2015. The structure I was able to observe showed a steel structure with steel
pans and slabs on the floor. The proposed floor plan change will occur entire at the lowest
building level where a slab on grade condition exists. The proposed remodel includes removal of
a section of partition wall at the lowest level office suite. There will also be new partition walls
added in this space. The construction of additional partition walls is consistent with the type of
loading expected in this structure and does not need any structural modifications.
I did not perform any calculations nor did I observe any actual structural members. Based
on the existing structural drawings and the work being done, it is my opinion that the proposed
changes will not interfere with or alter the existing load path. Any framing conditions uncovered
during demolition that are not consistent with those described here shall be brought to the
attention of the engineer after to demolition. I have agreed to make myself available for consult
when new information regarding the structure allows for a better assessment. Any structural
modifications necessary will be provided at that time.
Sincerely,
Hein Brutsaert P.E.
03/13/2019
04/03/2019
justinh
Silver Town Structures 307N AABC Aspen, CO 81611
03/13/2019