HomeMy WebLinkAboutFile Documents.205 S Mill St.0078.2018 (6).ACBK COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 4Ϭ, Series of 2Ϭ16 adopts the 2Ϭ15 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
RϭϬϴ͘ϯ uildinŐ Ɖermit ǀaluations͘ Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
ϭϬϵ͘ϯ uildinŐ Ɖermit ǀaluations͘ The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the oƉinion of the buildinŐ oĸcial͕ the ǀaluation is underestimated on the aƉƉlication͕ the Ɖermit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
ity Ɖolicy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HsAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, Ňoor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
AFFIDAVIT POLICY
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: _________________________ Date:___________
Owner Printed Name: _________________________
or,
Authorized Agent Signature: _________________________ Date:___________
Authorized Agent Printed Name: _________________________
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
AuŐust ϮϬϭϳ
Ian Walker
Ian Walker 7.10.18
07/13/2018
0./%02)%1
3)2%
)++2
1/%-
!+*%0.-1203#2).--#
.5
!1!+2
%+
%,.!-$0%12.0%4)-$.4$)1/+!61&0!,)-'!$$$..0
064!++%+%#20)#)!-!1-%%$%$
!0/%-2%01$%,.&0!,)-'&)-)1(%1!1-%%$%$
!".020!1((!3+!-$$%,.
+%#20)#)!-$%,.&)5230%1!1-%%$%$
!)-2
064!++
%2!+1(!-$0!)+1
0!,)-'$064!++$..0&+..0)-'
0!1(!3+
!- !+*%0
!0*)-'
+%!-)-'
07/13/2018