HomeMy WebLinkAboutFile Documents.210 E Cooper Ave.0171.2018 (9).ARBKTHIRTYSEVENDEGREES.CO
210 E. COOPER ASPEN CO. APT. 1D
CONTRACTOR: Jacob Pipe THIRTY-SEVEN DEGREES CONSTRUCTION
ARCHITECT: JHD DESIGN
OWNER: SCOTT & CARLY WEBER
6/22/2018
Lorem Ipsum 2
6/22/2018
Lorem Ipsum 3
NON-STRUCTUAL INTERIOR REMODEL OVERVIEW:
Demolition
1. Remove ceiling drywall and asbestos.
2. Remove all cabinets.
3. Remove wood flooring.
4. Remove interior doors and all trim.
5. Remove old plumbing fixtures and lighting fixtures.
6. Remove old water heater.
INTERIOR ADDITIONS:
The following items of construction will be performed during remodel time frame.
1. Install new sound barrier and new wood floor.
2. Install new ceiling, drywall, plaster and paint walls.
3. Install new electrical fixtures and rated ceiling cans, electrical panel and new bathroom fans.
4. Install plumbing fixtures and tank-less water heater.
5. Install new doors and jambs.
6. Install new fry reglet detail.
7. Install new gas fireplace and vent.
8. Install new tile and glass.
9. Install new appliances.
6/22/2018
Lorem Ipsum 4
CONTACT INFORMATION:
CONTRACTOR: Thirty-Seven Degrees Construction. Co.
WEBSITE: www.thirtysevendegreesconstruction.co
OWNER: Jacob Pipe
PHONE: 970.366.1840
EMAIL: pipez80@hotmail.com
ARCHITECT: JHD Design
PHONE: 970.948.4537
EMAIL: jhdesign@sopris.net
6/22/2018