Loading...
HomeMy WebLinkAboutFile Documents.210 E Cooper Ave.0316.2017 (4).ARBKConstruction Management Plan 210 E Cooper St 3G 1.0  No Exterior Work 2.0  Interior Remodel  Vicinity map included 3.0  3.1 o Applying for Building Permit  3.3 o Project Sign will be posted  3.4 o Owner – Feral Venture Capital LLC o S&S Construction (Scott) 618-7318 o Scott is supervisor, safety, and traffic officer 4.0  Dates of construction pending permit application review and issuance of building permit. Hopefully Spring of 2018  Hours of construction to comply with COA regulations  Construction Schedule attached  Project Fencing – N/A  Tree Protection and Fencing – N/A 5.0  Construction workers will be requested to carpool. Any parking will either be on the street or possibly a couple space in the back of the complex may be used  Emergency access is always maintained  5.4 o Materials will be delivered and unloaded either from the street or in the back of the building. Staging will be in back of the building or in our working area. 12/14/17 o Temp Toilet and Dumpster will be in back of complex’s parking area. 6.0  Licensed Traffic control will be provided if needed 10.0  Agreed 11.0  All Construction Equipment will be adequately muffled and maintained to minimize project noise  No radios on site prior to 8am 12/14/17