HomeMy WebLinkAboutFile Documents.210 E Cooper Ave.0316.2017 (4).ARBKConstruction Management Plan
210 E Cooper St 3G
1.0
No Exterior Work
2.0
Interior Remodel
Vicinity map included
3.0
3.1
o Applying for Building Permit
3.3
o Project Sign will be posted
3.4
o Owner – Feral Venture Capital LLC
o S&S Construction (Scott) 618-7318
o Scott is supervisor, safety, and traffic officer
4.0
Dates of construction pending permit application review and
issuance of building permit. Hopefully Spring of 2018
Hours of construction to comply with COA regulations
Construction Schedule attached
Project Fencing – N/A
Tree Protection and Fencing – N/A
5.0
Construction workers will be requested to carpool. Any
parking will either be on the street or possibly a couple space
in the back of the complex may be used
Emergency access is always maintained
5.4
o Materials will be delivered and unloaded either from the
street or in the back of the building. Staging will be in
back of the building or in our working area.
12/14/17
o Temp Toilet and Dumpster will be in back of complex’s
parking area.
6.0
Licensed Traffic control will be provided if needed
10.0
Agreed
11.0
All Construction Equipment will be adequately muffled and
maintained to minimize project noise
No radios on site prior to 8am
12/14/17