Loading...
HomeMy WebLinkAboutFile Documents.210 E Cooper Ave.0316.2017.ARBKBuildingComment1 Subject: PlanCheck Page Label: 6 Author: justinh File Name: 210 Cooper Permit Set_120817.pdf Provide structural verification that the walls being demolished are not structural and that this remodel will have no negative affect on the building's structure. This can be in the form of a stamped and signed letter from an engineer or a note in your plans specific to that on a sheet that you have stamped and signed. 210 Cooper Permit Set_120817.pdf (8) Subject: PlanCheck Page Label: 7 Author: justinh File Name: 210 Cooper Permit Set_120817.pdf Note the requirement for a minimum of 75% of lamps in permanently installed fixtures to be high efficacy on your RCP. Also note that recessed luminaries installed in the building's thermal envelope shall be IC rated and air sealed. Subject: PlanCheck Page Label: 7 Author: justinh File Name: 210 Cooper Permit Set_120817.pdf Show bath exhaust fans on your RCP. Subject: PlanCheck Page Label: 7 Author: justinh File Name: 210 Cooper Permit Set_120817.pdf Show required smoke and CO detectors on the RCP Subject: PlanCheck Page Label: 7 Author: justinh File Name: 210 Cooper Permit Set_120817.pdf The permit application made reference to new flooring, but this is not shown or mentioned in the plans. Provide a spec for an underlayment product that achieves an IIC and STC rating of 50 or greater when used with your existing floor assembly. 2 FIREPLACE TO BEREMOVED; MAINTAINVERTICAL CHASE/FLUEFOR NEW GAS APPLIANCE UNIT REMOVE PLUMBING FIXTURES TYP. BATHROOM106 MASTERBATHROOM108 MECH104 NITF CLOSET Provide structural verification that the walls being demolished are not structural and that this remodel will have no negative affect on the building's structure. This can be in the form of a stamped and signed letter from an engineer or a note in your plans specific to that on a sheet that you have stamped and signed. 3 A 2 D COVE Note the requirement for a minimum of 75% of lamps in permanently installed fixtures to be high efficacy on your RCP. Also note that recessed luminaries installed in the building's thermal envelope shall be IC rated and air sealed. 2 OM LIGHTING TO REMAIN BATHROOM106 MASTERBATHROOM108 CLOSET Show bath exhaust fans on your RCP. C CCC 103 Show required smoke and CO detectors on the RCP The permit application made reference to new flooring, but this is not shown or mentioned in the plans. Provide a spec for an underlayment product that achieves an IIC and STC rating of 50 or greater when used with your existing floor assembly. NOTE INCLUDED ON SHEET 3.1 DEMO PLAN BOTH NOTES ARE INCLUDED IN GENERAL NOTES ON SHEET 1.2 SHOWN ON RCP SHOWN ON RCP THE NEW FLOORING IS SHOWN ON SHEET 3.2 FURNITURE PLAN. I'VE INCLUDED A SICA PRODUCT SPEC FOR THE STC RATING 02/06/2018 Subject: PlanCheck Page Label: 7 Author: justinh File Name: 210 Cooper Permit Set_120817.pdf Asbestos abatement documentation and clean air report is required before the building department can approve this permit as asbestos testing was positive in multiple locations. Subject: PlanCheck Page Label: 7 Author: justinh File Name: 210 Cooper Permit Set_120817.pdf Provide more information on the millwork paneled surround. If this surround is floor to ceiling and creating concealed space behind it it must meet the requirements of IBC 803.13.2-803.13.2.1 for set out construction. Subject: PlanCheck Page Label: 8 Author: justinh File Name: 210 Cooper Permit Set_120817.pdf Provide a listed/tested assembly for the demising wall that has a 1 hour fire rating and STC of 50 or greater. This detail does not work because you are disturbing the existing rated wall with the connection of the new interior wall. With this assembly you no longer have a 1 hour rated assembly where the demising wall and the new interior wall meet. 1 B EXISTRAILIN SCALE: 1/4" = 1'-0"1 FLOOR PLAN Asbestos abatement documentation and clean air report is required before the building department can approve this permit as asbestos testing was positive in multiple locations. RELOCATE DOOR NEW FIREPLACEAPPLIANCE W1 WALL TYPE TYP. MILLWORK PANELED SURROUND BAT MECH104 ORAY ADJACENT UNITOUTSIDE OFSCOPE CLOSET F Provide more information on the millwork paneled surround. If this surround is floor to ceiling and creating concealed space behind it it must meet the requirements of IBC 803.13.2-803.13.2.1 for set out construction. 3" = 1'-0"1 DEMISING WALL:1 HOUR RATED WALL CONNECTION EXIST. WALL NEW BLOCKING FOR FIRE RATINGNEW TYPE X 5/8" SHEET ROCK BACKER FORFIRE RATING EXIST. WALL NEW BLOCKING FOR FIRE RATINGNEW TYPE X 5/8" SHEET ROCK BACKER FORFIRE RATING 5/8"SEE PLAN 1 ½" = 1'-0"INTERIOR WALLW1 GL Provide a listed/tested assembly for the demising wall thathas a 1 hour fire rating and STC of 50 or greater. Thisdetail does not work because you are disturbing theexisting rated wall with the connection of the new interiorwall. With this assembly you no longer have a 1 hour ratedassembly where the demising wall and the new interior wallmeet. THE MITIGATION AND REMOVAL IS BEING CONDUCTED AND A CLEAN AIR REPORT WILL BE PROVIDED ONCE COMPLETED THE MILLWORK PANEL WILL NOT CREATE AIR SPACE; IT IS SIMPLY A WALL TREATMENT THAT WILL BE FASTENED DIRECTLY TO THE DRYWALL ASSEMBLIES UPDATED WITH A LISTED ASSEMBLY. 02/06/2018