Loading...
HomeMy WebLinkAboutFile Documents.58 Pitkin Way.0158.2019 (6).ARBKAPPENDIX E CONSTRUCTION SITE MANAGEMENT PLAN 58 PITKIN WAY, ASPEN, CO 81611Portable ToiletExisting snowmelted driveway area to be removed and replaced 6 Yard DumpsterTemporary material layout down area Erosion control fence or straw waddles Erosion control fence or straw waddles All temporary parking to be located off-site due to site restrictions - Red Mountain RROW or Pitkin Way ROWSCALE = 1" = 20'-0" NORTH06/20/2019APPROVED APPENDIX - B EMERGENCY ACCESS PLAN - HAUL ROUTE 58 PITKIN WAY, ASPEN, CO 81611Emergency and Fire Vehicle Turn-a-Round 58 Pitkin WayWilloughby WayPitkin WayTo Hospital & Fire Dept. 06/20/2019 APPENDIX A PROJECT VICINITY MAP 58 PITKIN WAY, ASPEN, CO 81611 Willoughby WayRed Mountain Road58 Pitkin WayPitkin WayCul-de-sac / turn around Red Mountain RoadWilloughby WayTo Downtown Aspen 06/20/2019 ID Task Name1LOCATES2Property Line and Envelope Locate3Utility Locate4SITE PROTECTION & SETUP5Deliver Temp Toilet6Deliver Dumpster7Install waddle and silt fence8Install tree protection fencing (if required)9DEMOLITION & HAUL OFF10Cut Concrete Slab11Demo & Haul-Off12EXCAVATION13Prep sub grade14Install rigid foam insulation 15CONCRETE16Form Slab 17Set Remesh18Set and Tie Rebar19Pour Slab20Remove Forms21Power Wash Slab22Seal New Slab - 2 Coats23MECHANCICAL24Install New Tubing and Manifolds25Install New Boilers26Commission New System 27DEMOBILIZATION28Remove Dumpster29Remove Temp Toilet30LANDSCAPING 31Remove Silt Fence32Final Clean-Up33Repair Grading / Top Soil (as required)34Install softscape (as required)Property Line and Envelope LocateUtility LocateDeliver Temp ToiletDeliver DumpsterInstall waddle and silt fenceInstall tree protection fencing (if required)Cut Concrete SlabDemo & Haul-OffPrep sub gradeInstall rigid foam insulation Form Slab Set RemeshSet and Tie RebarPour SlabRemove FormsPower Wash SlabSeal New Slab - 2 CoatsInstall New Tubing and ManifoldsInstall New BoilersCommission New System Remove DumpsterRemove Temp ToiletRemove Silt FenceFinal Clean-UpRepair Grading / Top Soil (as required)Install softscape (as required)SMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMJul 21, '19Jul 28, '19Aug 4, '19Aug 11, '19Aug 18, '19Aug 25, '19Sep 1, '19Sep 8, '19Sep 15, '19Sep 22, '19WING RESIDENCESTRUCTURAL ASSOCIATESJune 20th, 2019APPENDIX D06/20/2019