Loading...
HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0096.2018 (28).ARBKMarkup Summary Cloud+ 5-1-2018 1130 Black Birch 0096.2018.ARBK Subject: Cloud+ Page: [10] C9 EROSION CONTROL PLAN Checkmark: Unchecked Author: aaronr Date: 5/1/2018 4:07:16 PM Creation Date: 5/1/2018 3:57:50 PM Color: File Name: Civil Drawings.1130 Black Birch.2018.04.pdf Please indicate tracking pad and concrete washout locations Cloud+ (5) Subject: Cloud+ Page: [10] C9 EROSION CONTROL PLAN Checkmark: Unchecked Author: aaronr Date: 5/1/2018 3:57:14 PM Creation Date: 5/1/2018 3:56:20 PM Color: File Name: Civil Drawings.1130 Black Birch.2018.04.pdf Please Add: Concrete Wash-out detail, tracking pad detail, statement or detail related to temporary toilet anchors. Subject: Cloud+ Page: [10] C9 EROSION CONTROL PLAN Checkmark: Unchecked Author: aaronr Date: 5/1/2018 3:36:08 PM Creation Date: 5/1/2018 3:34:53 PM Color: File Name: Civil Drawings.1130 Black Birch.2018.04.pdf Please ensure the wattles are positioned in a manner that provide ponding. Subject: Cloud+ Page: [10] C9 EROSION CONTROL PLAN Checkmark: Unchecked Author: aaronr Date: 5/1/2018 4:02:34 PM Creation Date: 5/1/2018 4:01:00 PM Color: File Name: Civil Drawings.1130 Black Birch.2018.04.pdf Additional structures may be required, to be determined based upon effectiveness in the field. Subject: Cloud+ Page: [10] C9 EROSION CONTROL PLAN Checkmark: Unchecked Author: aaronr Date: 5/1/2018 4:00:49 PM Creation Date: 5/1/2018 3:58:24 PM Color: File Name: Civil Drawings.1130 Black Birch.2018.04.pdf Please locate stockpile locations as far away from waters of the state as possible, this includes the Roaring Fork/Castle Creek/open ditches. S Please indicate tracking pad and concrete washout locations Please Add:Concrete Wash-outdetail, tracking paddetail, statement ordetail related to temporary toilet anchors. S G Please ensure the wattles are positioned in a manner that provide ponding.EAdditional structures may be required, to be determined based upon effectiveness in the field. Please locate stockpile locations as far away from waters of the state as possible, this includes the Roaring Fork/Castle Creek/open ditches. Vehicle tracking pad has been added to erosion control sheet. See CMP for concrete washout location A vehicle tracking pad detail and concrete washout detail has been added to the detail sheet. Wattles are positioned in a manner to provide ponding. See CMP for material stockpile location 11/05/2018