HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0096.2018 (29).ARBKMarkup Summary Callout 5-1-2018 1130 Black Birch 0096.2018.ARBK
Subject: Callout
Page: [10] C9 EROSION CONTROL PLAN
Checkmark: Unchecked
Author: aaronr
Date: 5/1/2018 4:05:50 PM
Creation Date: 5/1/2018 4:04:29 PM
Color:
File Name: Civil Drawings.1130 Black Birch.2018.04.pdf
Please add additional physical
barrier (construction fence) at
stream margin setback if
possible. This will help ensure
there is no disturbance within the
setback.
Callout (1)
Please add additional
physical barrier
(construction fence)
at stream margin
setback if possible.
This will help ensure
there is no
disturbance within the
setback.
See CMP for
construction fence
location
11/05/2018