HomeMy WebLinkAboutFile Documents.1039 E Cooper Ave.0226.2017.ARBK0226-2017-ARBK_BuildingComments_1
Page: 1
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide a sound underlayment
product spec sheet for the new
tile to achieve and IIC rating of
50 or greater (2015 IBC 1207).
FULL PLANS SET.pdf (10)
Page: 1
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
If dwelling separation walls are
disturbed, they must be
asbestos abated and a 1 hour
fire and STC 50 sound rated
assembly must be submitted and
approved.
Page: 1
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
If dropped ceilings in bathrooms
are disturbed, they must be
abated and a 1 hour fire and
STC 50 rated assembly must be
submitted and approved.
Page: 1
File Name: FULL PLANS SET.pdf
Subject: 75% high efficacy lamps
Author: nickt
Color:
A minimum of 75% of all lamps
installed in permanent light
fixtures must be high efficacy in
dwelling units. Note this
requirement on the plans. (2015
IECC R404.1 & C405.1)
Page: 1
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide an existing floor plan.
Provide a sound
underlayment product spec
sheet for the new tile to
achieve and IIC rating of 50 or
greater (2015 IBC 1207).
If dwelling separationwalls are disturbed,they must be asbestosabated and a 1 hourfire and STC 50 soundrated assembly mustbe submitted andapproved.
If dropped ceilings inbathrooms aredisturbed, they mustbe abated and a 1hour fire and STC 50rated assembly mustbe submitted andapproved.
A minimum of 75% of all lampsinstalled in permanent light fixtures
must be high efficacy in dwelling
units. Note this requirement on theplans. (2015 IECC R404.1 & C405.1)
Provide an existing floor plan.
See attached document sound specs
See USG document attached
Noted on plan
Provided
See fire rated assembly attached
3/04/2018
Page: 1
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide a completed IBC
building description form.
Page: 1
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
Ceilings may not be dropped
anywhere unless a 1 hour fire
and STC 50 sound rated
assembly is provided and
approved.
Page: 1
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
If Dryer is being removed,
please remove it from the plans.
Page: 1
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide make up air if kitchen
hood exhausts greater than 400
cfm.
Page: S1.2
File Name: FULL PLANS SET.pdf
Subject: PlanCheck
Author: nickt
Color:
Snow load should be 100psf per
Ordinance 16, 2014. Revise
S1.2.
Provide a completed IBC building
description form.
Ceilings may not bedropped anywhereunless a 1 hour fireand STC 50 soundrated assembly isprovided andapproved.
If Dryer is beingremoved, pleaseremove it from theplans.
Provide make up air ifkitchen hood exhaustsgreater than 400 cfm.
Snow load should be100psf per Ordinance16, 2014. Revise S1.2.
Dryer removed
Re circulation hood
See fire rated assembly
IBC document attached
Change made
3/04/2018