Loading...
HomeMy WebLinkAboutFile Documents.1001 E Cooper Ave.0194.2019 (7).ARBKLJ TNB Cm oF A§p£N SPECIAL INSPECTION AND TESTING AGREEMENT Topermitapplicantsofprojectrequiringspecialinspectionand\ortestingperSection1704ofthe Intemational Building Code (IBC). Project Address:Permit Number: OO BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner's agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPHCIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. SpecialinspectionandtestingshallmeettheminimumrequirementsoftheJ#fej'7e¢fz.o#¢/jBwz.Jdz.ngCode Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the special Inspector I. Signify presence at job site. Special inspectors should notify contractor persormel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications,andapplicableworkmanshipprovisionsoftheJ#fer#4ft.o#o/jB#z./dz.ng Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have priorapprovalbasedonaseparatewrittenplanreviewedandapprovedbythebuilding department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the irrmediate attention of the contractor and note all such items in the daily report. If anyitemisnotresolvedinatimelymannerorisabouttobeincoxporatedinthework,the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704. I .2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing ofnonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. Change Order #2 0194.2019.ARBK 09/18/2019 5. Provide Final Inspection Report. The special inspector shall submit a written final reportdocunentingrequiredspecialinspectiousandcorrectionofanydiscrepancies noted in the inapections prior to the final building inspection. a. Owner Responsibffities. The project owner, the engineer or architect or record, or an agent of the owner is reaponsil]]e for employing special-inspection services. The special inapectohagency shall Jlo/ be in the employ of the contractor, subcontractor or material supplier. [mc See 1704.1] In case of an owner\contractor, the apecial inspector\agency shall be employed as apecified by the building official. C. Engineer or Archifect of Record ReaponsibiREes I. Prepare special inspection program. The engineer or architect of record shall list the itelusforwhichapecialinspectionisrequired;andshallindicateanyitrmsforwhichthe IBCorthebuildingoffcialapprovesperiodicinspectionandthefrequencyofsuch inapech-ous. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies I.n design, material, or workmanship observed by the special inapector. 3. Review shop drawings and submfi design changes. The enginer or architect ofr~d shallacknowledgeandreviewforconformancewiththeconstnictiondrawingsthose shopdrawingsthatmaydetailstruetLiralinformation,shallsubmittothebuildingofficiai andtothespecial-inspectionagencywrittendocumentationofanyverballyauthorized deviatiousfromtheapprovedcoustructiondocunents,andshallsubmitrevised documents for building official approval as required D. Contractor ResponsmiHties 1. Notify the special inspector. The contractor is responsible for notifying the special iuspectororngencyregardingindividualinapectiousforitenrslistedontheattached schedule and as noted on the building department approved plans. Adequate notice shall beprovidedsothespecialixpectorhastimetobecomefroiliarwiththeprojecL 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records. Upon request the contractor is also responsible for retaining,atthejobsite,allspecialiuspeetionrecordscompletedtrythespecialiuspector. E. Inspection ofFabricators I. Fabrication of structural assembnes and members. Where fabrication of struetural load-bearingmembersandassembifesisbeingperfomedonthepremisesofa fchricator'sshop,IBCSection1704.2shaurequirespecialiuspectionofthefichricated items. 2. Fabrhation and implementation procedures. The special ixpector sham verify that thefabricatormalntainsdetailedfabricationandqualitycontrolproceduresthatprovidea basisforinspectioncontroloftheworkmanshipandthefabricator'sabilitytoconformto approvedcustructiondocunentsandreferencestandards.Thespecialinspectorshall reviewtheproced.]Iesforcompletenessandadequncyrelativetocoderequirenentsfor fabricator's scope of work. F. Approved Fabricator Responsibiffies I. Fabrication exempt inspections. Special inspections are not required where work is doneonthepremiseofafabricatorregisteredandapprovedtoperformsuchwck without special inspection. 2 09/18/2019 2. ^pprovBI of robrlcator. Approval shall bc `iascd upon rcvicw ofthc fabric8tor`s wrillcn proc.'dural und qualily colili.ol m#iiiials ai`d periodic audiling of f`abf(calion practices by &n apprl}vetl xpecjfll inspection agcii.`y. .]. C`olitplctlon a/ fabrJc&llo». LJ|ion «w»rilclitm of r4hric4(i{7», llic approved fobr`c8tor 9holl Submit certiricatc or contT]liancc to the building ofricial €tetilig (hat lhc work was performed i" accord8ncc with the approved conglruclion documents, a, Bulldlng D®p.rtmeiil Re.lion.lbllltl.I I. ^i]pl'ove.pcclll-ln.|i¢ctlon progr.in. 'l'lic buildillg dcparlmenl Shnll a|}provc all special iltspccror8 and special.ii`3pcclioii rcquii.eniciils. 2. F,nforce .peclal Inlpcctlon. Work rcqujring ®pccial inspec[ion and lhc building inlpcctor shall moililor lhc pcrl`orm8nci. of §pcci8l ins|icctorl. HIN±I¢r approval, jn addition to tl`al or the apccial inspc..tor, muSt bc obt®incd prior to plo¢¢menl of concrcle, covering orstructuml slccl, or other simllar matcri.15. 3. Revlew' Inipectlon reporli. The biiilding omci#I should rcvi¢w.pccial.inspcclion progrc..i end rlnal rcf}om, 4. Pei.roi.in flml lnii]ectlon. Tlie buildiflg offici.I IIIould pcrfoml lhc fmal impcclion and approval for ti projcc` |lBC. Scc. log,3,I j el'rer tli¢ rinal spcci.I-inipccLion rcporl has bc€fi rcvicwcd and approved. pr®fuct^ddrow.Iat9thacifepeREjan±±Jp;rf`±±.pqmN^Nwher..enftrfeJanBaK ACKNOWLEDGMF,NTS I have road and agrcc to comply w`lh tlic coiidilion. of lhi. agrccitlcnt. Spcciil IItspcction ^gciicy: Ownc,:•'//i ,/,'T I,1, ,.fi iiuni`iul i;k. ` I,,^! I 1.,r ._ E#r;;I:h{Cfesqu4giv C?on(rector; ^rlproved Fchricalor: I liipeeted Fabricotor: ftyMl['Offh;I,/!£c (ci,cle onl') C.lTY OF ASPF,N J'ITKIN COUN.I.Y; Signatwrc: Sigm,ure Prjnlcd N#me: .a ---A --rf .,-~,th` .-.. ~ _,let+-`~'+ ,..,. i.-J~`c.+---7o Printed Nan¢ Priillcd Name: keg:~L+un. Printed Name: jfystuL«fJdyfen3 Prf nicd Nrmc: Printed Name; {.i Wl/l¢ri f tyDL'fv Prinlcd Nan`c: I)8'C: D8'C -t,/"-/-?€J-3- -. Dale: .` 3=!1:Pff ,.,_ Dote: 1-J1-=sOM' . - l'alc: Do'c ~_orfJ.i,!!_,CI I)ate: JH Justin Hahn 9/24/18 09/18/2019 `P#rq`#i S"#ft'}ci{`.r `^ , . `+` I a \+ ,`jiu`J iti`i`+ ,r|l.£ch `Ti .tic f.br{c3tiir . .J.r`-` '.~iicl'¢tr+.a: a?i `t.fiL:.` 'S`{^!( `i ~~ `. i'` £t`d gs"ii3 ih iui3t!mg O!'!ahtt..a;ia. Pfs€tice. t`.i dr #ftstr```tL{ trr¢SiJ ,in£Tt{` ( ``Jt a#er..I % {``®"PtotiSc cf r.brfe.ihaq. i rt!" "`ittr!t`¢{t¢ „(-r.hr.i-a{itrm. Iba apprw`ed r4brii`a!dyr bh&H! tjhrii c€il.~:ite L`t-`.ar.`` 7Sr```-`. iQ i`€ b*"J!r\£ om`.ta} Iul{ir,B tt`.i th€ tl'Sr* u8. i 4``r' r' ry?tLI= `, a€,:dyizdi*L~: =^ /zi+ `t`\r &`r-,ry`q`\¢d €Sn.iru€{j¢# €fe-tlfi?¢rJ..t a, beuelut nep.rtcoi ll.aponlanmtl +?Si8`t *p€:Sl!+{'p€?e`€!i¢r p7`ngrim ;-:€ l`jii*tii* J€apr`mci: tho!; #+!tpronbt A;i * 'tir* ,(; *€ i I `^*#€€ thrirS * y'u3 ftyc€ )` jl , . ( tqu's't` `R`, i t ... I i i € rf}€it I & ~fa t',®fgivF€r Spest*}?atptiwh. W` lil rtqi[+€\].ni.pe¢7,&4 {rt*pect[¢| az`d l*€ bu!{dlflg lqu`¢gft a+to^a`; m*,trLtL„ . t€ ap-*a.r`£~fa`t „ SpeL!4l triipei!urs !{iitilcf lpprs`'3L t*` safj+. Sr L} i+vj¥L .\*' i~,£ tnoL5Si ,*q)+mi#r ;r}uifri, be ¢tl!jiin£8 p! tat tL` p!a`.cr?ico{ ut.€¢n€r€l€ hht+`£mS 1?)I £:Hut:c;ra` Ire: +1+ `Ttfa€r }i-I;a-r,a],c{i.i` .?,, ftm*.:Lu 3mixp¢e:ciaa rtperti The ha;t!#tn8 {i.Ti£ ,$1 thoi!{`J, retJzc* .p€€+.I-inlpe€!ltm i,xxpgrg¢t a-,€ rtttS , i qu?r.. i Prarfroee mfaSH#.pnd##ut Tfi€ *Li¢iLz,\,,# ufr!.`!i{ lit+"(a jictfom iit€ fmjHnqu-iiur.nu do`'``4i"cjtf f^+ 3 #.c.`,:.~ :r!i `;~ `'`ap; 1 gt-.Tf :'c i.n¢i Sft€ I:..n!r¢i`:I."gror: ha5t`C€m ~€¢ .\,rvL f£ € Td 3-Fr~6T . i; ¥TdrfroA \S&run ifef EaITapny gr€ ttiit #I ptwlNowwh. 0"8.f lola.1RBX A c-i{ i Ou I r ri c; `i r,` 1 S ; be.ng #" and Si,t;p! :1` t&rr!ri} '* itti the €at!d;!ian. ¢r !hi6 igr€cmcnt`,-.ifngl,~=`:",,-q^{lqllr.~__,fz Tf3dy`i urf ais I R.fill iS¢ft tri Tk!IfI + < , # r*`{, 4 p=- f qu p€RTchT±\ke«priA#t± tepetheGfrrfe. a,,f i ,-`;, =£ t±Eifer+cri. i;' ``8~='`'= I;Tr:ai `3h"c Ltal': f tyNuh i eAA. q//i/zor9 "^f it,1 h¢.\T *a!Lo itoF LALfun q-tt-zforf 'jjLkif #3:is~f i:Jch+ben3 :-11-&Dn 'l`ftytl:+` Cd L3t3qu.,`h&.I + I ,, |jt/ ir;;,j ilirf "I"., „, !,i /##,:,I-'!u, ,I. tr (ij,~ ~ ,,` ~ ` \ rq' . 'L, .1``: ; *, (,`'.I `, v I.-. pi3*`,.,£ I ~ ; ,,,, lf f i",,,Jl [f ,i/„ JH Justin Hahn 9/24/19 SPECIAL INSPECTION - AN OVERVIEW Therm/e7nd].ore/B#z.JdingCbdeqBC)hassetforthanunberofstipulationsinwhichthe employmentofspecialiuspectorsismandatory.InthefirsteditionoftheIBC,theo""crorthereg!.s!ered-E;£fk5i=sV=i:Ei;=r-=f;wiiirle-change.ac.i_-inEasth?own.er'.sag_=_i:rs_:=±ed_torpc¥`\#.=#\LAlk# qualifiedinapectorsforcon#n#ousorpen.ediciuspeofousdrigconstructionaBCSec.1704.1).These iliapeedonsareinadditiontotheinspeedonsspecifiedinIBCsection109.Exceptionstoapecialiuspection are noted also. Aspecialinspectorisapersonwhohasbeenapprovedbythebuildingofficialtoperfomcertain typesofinspeedonasdetailedinIBCsection1704.Thesegenenllyinclude: I. Inape€tion of fal]ricators: Where fabrication of structural load-bearing members and assembliesarebeingperfomedonthepremisesofthefabricator.Noteexceptionfor approved fabricators. See Section 1704.2 i 2. Steel cousrfudion: See Tchle l704.3 for detailed information ngarding inspections. Major areas under steel coustruchon (see Section 1704.3) are: matedalverification6fhi9h-strengthbolts,nuts,andwashers; inspection of high-strength bolting, material verification of structural steel, materialverificationofweldfiltermaterials, in§pectionofweldingforbothsfrocturaLsteelandreinforcingsteeL,and, inapectionofsteelfianejointdetailsforcoxpliancewithapprovedconsndon documents. 3. Concrete construction: See Table 1704.4 for detailed information regarding inspection. Major areas under steel construction (see Section 1704.4) are: a. ixpection of reinforcing stol, including pestressing tendons, and placement b. inapection of bolts to be installed in concrete prior to and during placement of concrete, c. verification of use required design mix, d. sampling of fresh condrete and performing slump, air content and fresh concrete temperatureattimeofmakingspecimeusforstrengthtests, e. inapedion of cormcte and chortorcte placenent for proper application techniques, f. inapeedon for maintenance of apecified curing temperature and techniques, 9. inapeetion of prestressed concrete including application of prestressing forces and groutingofbondedprestressingtendons, h. erection of precast concrete members, i. verification of in-situ concrete strength prior to stressing oftendous in post-tensioned concreteandpriortoremovalofshoresandformsfrombeamsandsrfucturalslabs. 4. Masonry construction: See mc Tables 1604.5 and 1617.6 for classification Of building or structuerequingapecialiuspection.Tables1704.5and1704.5.3showdetalledinformation regardinglevel1andlevel2specialinapectionsformasonycoustruetion.Majorareasunder masonry construction are (see Section 1704.5): a. verification of site-prepared mortar, coustruetion of mortar joints, and locations of reinforcement and comectors, b. wificafron of size and location of structural elements; type, size, and location of anchors;includingdifaitsofanchorageofmasonytostructuralmenkers,frames,or other cousrfuction, verificationofspecifiedsize,.grade,andtypeofreinforcement verificationofweldingofreinforcingbars, verificationOfprotectionofmasonryduringhotandcoldweather, vedicationpriortogroutingthatthegroutapaceiscleanandconectproportioasof site-prepared grout are present, pxparafronofanygroutspecimens,monarspecimens,and\orprisms, 4 09/18/2019 h. verification ofcompliance with required inspection provisions of the construction documents and the approved submittals. 5. Wood construction: Inspection of the fabrication of wood structural elements and assemblies. (Section 1704.2) See Section 1704.6. 6. Soils: Inspection of site preparation prior to placement of prepared fill, verification offill materials and maximum lift thickness, and verification that in-place densities meet soils report. See Section 1704.7. 7. Pile foundations: Inspection of installation and testing of pile foundations, and recording of installation,load test, and cutoff and tip elevation of each pile. See Section 1704.8. 8. Pier foundations: Inspection of pier foundations in accordance with Section 1616.3 for buildings located in Seismic Design Categories C, D, E, or F. See Section 1704.9. 9. Wall panels and veneers: Inspection of exterior and interior architectural wall panels and the anchoring of veneers for building assigned to Seismic Design Categories E and F. Inspections of veneers shall meet requirements of section 1704.5. See Section 1704.10 10. Sprayed fire-resistant materials: Inspection of fire-resistant material applied to structural elements and decks in accordance with Section 1704. I 1 through 1704.11.5. 11. Exterior insulation and finish systems allFS): See Section 1704.12 for exceptions to required inspections. 12. Special cases: Inspections that, in the opinion of the building official, are needed because of the use of altemate materials, unusual design, or use of materials not having building code approval that are necessary to meet special manufacturer requirements. See Section 1704.13 13. Smoke control: See Section 1704.14 09/18/2019 GENERAL PROGRAM GUIDELINES A. Purpose of spceial Inspection Speciallnspectionisthemonitoringofthematerialsandworkmanshipthatarecriticaltothe integrityofthebuildingstructure.Itisareviewoftheworkthatthecontractorsandtheir employeestoassurethattheapprovedplansand§pecificatiousarebeingfollowedandthat relevant codes and ordinances ac being observed. The apecial inspection process is in add!.fl.ore to thoseinspectionsconductedbythemunicipalbuildingiuspectorandbytheengineerorarchitect of record as part of periodic structural observation. The special inspectors fimich co##.#%ous or per!.od!.cinspectionasprescribedinIBCTable1704.3forthatconstruchonwhichrequirestheir presence. [HBC Section 109.3.9 and 1704] Gone-commuricationbetweenthespeeialinspectorandthedesigners,contractor,andbuilding deparment is essential to project quality assurance. 8. Duties and Respousibflities of the special Inspector Thoughnotrequiredbycode,specialinspectorsand\orinspectionagenciescandocument acceptanceoftheirrespousibilitiesandscopeofworkforaprojectbysigninganagreementthat includesadetailedscheduleofservices,commonlyknownastheSpecial-IuspectionandTesting AgreementandtheSpecial-InspectionandTesthgSchedule.mtiesOfspecialinspectorsand\or inxpection agencies include the following I. Signify pesence at job site. Special inspectors should notify contractor persomel of theirpresenceandresponsibilitiesatthejobsite.Ifrequiredbythebuildingofficial,they shallsigninontheappropriateformpostedwiththebuildingpermiL 2. Observe asigned work. pec Section 1704] Special inspectors shall inspect all work forwhichtheyarereapousibleforconformancewiththebuildingdapartmentapproved (staged)plansandapecificatiousandapplicableprovisionsoftheIBC.3. Rqurt nonconforming items. Special inspectors shall bring all nonconfoming iteus to the immediate attention of the contractor. If any such item is not resolved in a timely rmmerorisabouttobeincorporatedintothework.theengineerorarchitectofrecord andthebuildingofficialshouldbenotifiedirmediatelyandthentheitemnotedinthe inapector'swittenraporLpecSection1704.1]Thespecialinspectorshanwritea saparateTaporttobepostedatthejobsiteregardingnoteddiscrapanciesthatshould contain,asaminimurn,thefollowinginformationabouteachnonconformingitem: a. Description and exact location b. Reference to applicable detail of approve planstspecifications c. Name and title of each individual notified and method of notification a. Resolution or conective aedon taken 4. Provide fudy reports. The special inspector should complete written inspection reportsforeachinapectionvisitandprovidethereportsonatimelybasisdeterminedby thebuldingofficial.Thespecialinspectororinspectionageneychallfumishthese reportsdirectlytothebuildingofficial,engineer,orarchitectofrecord,andothersas designated.HBCSection1704.I.2]Thesereportsshouldbeorganizedonadailyand weeklyformatandmaybesubrfedweeklyattheoptionofthebuildingofficial.in these reports, special inspectors should include: a. Describe inspections and tests made, with applicable locations b. Indicate how nonconforming items were resolved c. List unesolved iteus, parties notified, time and method of notification d. Itemize changes authorized by the engineer or architect ofreeord if not included in the nonconforming items. 5. Subndt fiml report. Special inspectors or inspection agencies shall submit a final signedreporttothebuildingdeparmentstatingthatalliteusrequiringspecialinspection andtestingwerefulfilledandraported,andtothebestoftheirknowledge,in conformancewiththeapprovedplans,specifications.andtheapplicableprovisiousofthe BC.[IBCSection1704.I.2]Ifemsnotinconformance,unresorveditems,orany discrquciesininspectioncovenge(i.e.missedinspections,periodiciuspectionwhen continunusinspectionwasrequired,etc)shouldbespecificallyitenizedinthisreport. C. Duties and Responsibilities of the project owner 6 09/18/2019 The project owner, the engineer, architect of record, or an agent of the owner is responsible for funding special inspections services. The special inspector\agency shall #o! be in the employ of the contractor, subcontractor, or material supplier. [IBC Section 106.3.5] In the case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. D. Duties and Responsibilities of the Design Professional in Responsible Charge The design professional in responsible charge should be a consenting party by written acknowledgement of special inspection and testing agreements. The design professional in responsible charge has many duties and responsibilities related to special inspection, including the following: 1. Prepare special inspection program. The design professional in responsible charge shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspection. [IBC Section 106.3.4] The design professional in responsible charge should coordinate with the project owner in the selection of special inspectors [IBC Section 1704.1] and is required to list special inspectors and their duties on the special inspection program [IBC Section 106.3.4.1]. The standard of the industry for employing a qualified inspection agency is its compliance with the requirements of ASTM E-329. The choice of special inspector should include the following considerations: a. Project size and complexity: experience with similar projects b. Inspection staffing: sufficient qualified inspectors c. Site location: proximity of inspection and testing facilities d. Off-site inspection: capabilities for inspecting at remote locations 2. Respond to field discrepancies. The engineer or architect of record shall respond to special inspector reports of uncorrected noncomplying items and shall approve remedial measures. 3. Review shop drawings and submit revisions to approved plans. The design professional in responsible charge shall acknowledge and review for conformance with the construction documents those shop drawings that may detail structural information, shall submit to the building official and to the special inspection agency written documentation of any verbally approved deviations from the approved construction documents, and shall submit revised documents for the building official approval as needed. [IBC Section 106.3.4.2] E. Duties and Responsibilities of the contractor The contractor's duties include the following: 1. Notify the special inspector. The holder of the building permit or their duly authorized agent is responsible for notifying the special inspector or agency regarding individual inspections as required by the building department. [IBC Section 109.5] Adequate notice shall be provided so that the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. [IBC Section 106.3.1] 3. Retain special inspection records. When required by the building official, the contractor is responsible for retaining, at the job site, all special inspection records submitted by the special inspector, and providing them for review to the building department' s inspector upon request. F. Duties and responsibilities of the Building official Of all the team members involved in the construction process, the building official is the only one with the legal authority to enforce the special inspection provisions of the code. [IBC Section 104.4] The employment of a special inspector or agency shall "o/ relieve the building department of responsibility for progress or called inspections as required by the code. Building department inspections of items also requiring special inspection should not be signed off without the concurrence of the special inspector. 7 09/18/2019 Thespecificdutiesandrespousibilitiesofthebuildingofficialrelatingtospecialinspection include the following: I. Review submittal documents for compliance with special inspection requirements. The building official is charged with the legal authority to review the plans, specifications, special inspection program, and other submittal documents for compliance with code requirements. HBC Section 104.2,106.3,106.5 through 106.5] 2. Approve special inspection program. The building official is responsible for approvingthespecialinapectionprogramsubmittedbythedesignprofessionalin responsiblechargePBCSection1704.1]andmayrequireapreconstruction conferencetoreviewtheprogramwithallappropriatemembersofthecoustruction team. 3. Approve special inspectors\inspection agencies. The building official is responsiblefordeterminingthecompetenceofspecialinspectorsforthetypesof work they will be inspecting. [IBC Section 1704] 4. Monitor special inspection activities. The building official should monitor the specialinspectionactivitiesatthejobsitetoassurethatqualifiedspecialiuspectors areperformingtheirdutieswhenworkrequiringapecitlinspectionisinprogress. 5. Review inspection reperts. The building official receives and reviews special inspeetionprogressreportsandfinalreportsforconformancewiththeapproved plans, specifications, and workmanship provisions of the code. [IBC Section 1704.1.2] 6. Perform special inspection. The building official should not perfom the froal iuspectionandapprovalofaproject[mcSection109.3.10]untilthefinalspecial inspectionraporthasbeenreviewedandapproved. Theuseofspecialiuspectorsis%ofdiscretionay.IBCSection1704clearlystatestheconditions underwhichtheymustbeutilized,butthereisaprovisionforthebuildingofficialtowaivethe specialiuspectionforworkofaminomature. Itistheresponsfoilityofthebuildingofficialtodeterminethecompetencyofspecialiuspectors. TheIBCdoesnotmakespecificrequirementsforthedeteminationofaninspector's qunlificatious,butthatinnowaylessenstheimportanceofbeingselectiveinthiscrucialprocess. AqualifiedspeeialinspeetorusullyhasstrillsthataresignificantlymorespecializedthanthoseOf regularmunicipalinapectors.Amunicipaliuspectorisrequiredtohaveageneralknowledgeofa greatnunberofcoderequirements,whereasspecialinspectorsfocusonlimitedareasofstructural inspection and materials testing. a. Duties and Responsibilfties of the approved fabricator Specialinspectionsrequlredbythiscodearenotrequiredwhereworkisdoneonthepremisesofa fabricatorregisteredandapprovedtoperfomsuehworkwithoutspeeialiuspection.Approved shallbebaseduponreviewofthefroricator'swrittenproceduralandqulitycontrolmanualsand periodicanditingoffichricationpracticesbyanapprovedspecialinspedionagency. Atcompletionoffabrication,theapprovedfabricatorshallsubmitacertificateofcomplianceto thebuildingofficialstatingthattheworkwasperformedinaccordancewiththeapproved construction documents. 8 09/18/2019 Name Rebecca Gremillion Carbondale, CO 81623 Stuart M. Hackett Thorton, CO Scott L. Maxwell Grand Junction, CO 81505 David L. Sturgeon Conifer, CO Bernie Whitman Rifle, CO CTL Thompson Glenwood Springs, CO 81601 Hepworth Pawlak Glenwood Springs, CO 81601 West Slope Testing and Inspection Grand Junction, CO 81505 Thunder Mountain Testing 2973 F. Road Grand Junction, CO 81504 GI.ound Engineering 41 lnvemess Drive East Englewood, CO 80112 www.groundeng.com APPROVED SPECIAL INSPECTORS Category Reinforced Concrete Structural Steel\We lding High-Strength Bolting Reinforced Concrete Structural Steel\We lding High-Strength B olting Sprayed-applied F ireproofing Structural Steel\Welding High-Strength B olting Structural Ste el\We lding High-Strength B olting Structural Steel\Welding Various Various Structural Steel\Welding High-Strength Bolting Various Various APPROVED FABRICATORS Name Myer's and Company Architectural Metals 555 Basalt Ave. Basalt CO 81621 www.meversandco.com Western Slope Iron & Supply Inc 670 23 Rd. Grand Junction CO 81505 Z~orLLC PO Box 1006 7011 Titan Rd. Littleton CO 80160 9 Phone # 970/963-8452 303/472-5233 970/256-9965 303/674-7560 970/370-8644 970/945-2809 970/945-8454 970/434-6988 970/260-2844 970/256-9965 303/289-1989 Phone # 970/9274761 970/243-9770 303/791-1333 (FAX) 303/791-1340 09/18/2019